Q3057476 (Q3057476): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) Tag: Replaced |
(Changed an Item: import item from Latvia) |
||||||||||||||
Property / instance of | |||||||||||||||
Property / instance of: Kohesio project / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / financed by | |||||||||||||||
Property / financed by: European Union / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / country | |||||||||||||||
Property / country: Latvia / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
1,238,428.63 Euro
| |||||||||||||||
Property / budget: 1,238,428.63 Euro / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
818,897.0 Euro
| |||||||||||||||
Property / EU contribution: 818,897.0 Euro / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / start time | |||||||||||||||
1 July 2020
| |||||||||||||||
Property / start time: 1 July 2020 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / end time | |||||||||||||||
30 September 2021
| |||||||||||||||
Property / end time: 30 September 2021 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
RĒZEKNES PILSĒTAS DOME | |||||||||||||||
Property / beneficiary name (string): RĒZEKNES PILSĒTAS DOME / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary | |||||||||||||||
Projekta mērķis ir ceļa savienojošā posma pārbūve no Maskavas ielas līdz dzelzceļam, reģenerējot degradētās teritorijas, atbilstoši pašvaldības attīstības programmai, nodrošinot videi draudzīgu un vides ilgtspēju veicinošu teritoriālo izaugsmi un jaunu darba vietu radīšanu. Galvenās darbības mērķa realizācijai ir ceļa savienojošā posma pārbūve, veicot asfaltbetona ceļa seguma pārbūvi un pazemes inženierkomunikāciju izbūvi vai pārbūvi, proti, tiks izbūvēts jauns ielas apgaismojums, jauna lietus kanalizācijas sistēma, jauns maģistrālais ūdensvads un sadzīves kanalizācijas tīkli t.sk., sūkņu stacija. Tiks pārbūvēti esošie AS "Sadales tīkls" elektrotīkli (iznesti ārpus ceļa braucamās daļas, nemainot tehniskos parametrus) un SIA "TET" optiskie tīkli (gaisvadu līnija tiks demontēta un izbūvēts pazemes kabelis). Ceļa posma pārbūvējamais garums - 760m. Projekta plānoto darbību rezultātā tiks izveidotas vismaz 20 jaunas darbavietas, piesaistītas nefinanšu investīcijas vismaz 818 897 EUR apmērā, degradētās teritorijas platība tiks samazināta par 0.78 ha.Projekta kopējie izdevumi ir 1 395 173,83 EUR, no tiem kopējie attiecināmie izdevumi 1 238 428,63 EUR. Atbalsta summa: 100 % no attiecināmajiem izdevumiem, nepārsniedzot 1 238 428,63 EUR, no tās: Eiropas Reģionālā attīstības fonda finansējums: 66,12% apmērā no attiecināmajiem izdevumiem, nepārsniedzot 818 897,00 EUR, Valsts budžeta dotācija pašvaldībām: 3,50 % no attiecināmajiem izdevumiem, nepārsniedzot 43 353,37 EURPašvaldības finansējums: 30,38 % no attiecināmajiem izdevumiem, nepārsniedzot 376 178,26 EURProjekta kopējie neattiecināmie izdevumi: 156 745,20 EUR, ko finansēs pašvaldība. Projektu ir paredzēts uzsākt 2020.gada 3.ceturksnī un īstenot līdz 2021.gada 3.ceturkšņa beigām. (Latvian) | |||||||||||||||
Property / summary: Projekta mērķis ir ceļa savienojošā posma pārbūve no Maskavas ielas līdz dzelzceļam, reģenerējot degradētās teritorijas, atbilstoši pašvaldības attīstības programmai, nodrošinot videi draudzīgu un vides ilgtspēju veicinošu teritoriālo izaugsmi un jaunu darba vietu radīšanu. Galvenās darbības mērķa realizācijai ir ceļa savienojošā posma pārbūve, veicot asfaltbetona ceļa seguma pārbūvi un pazemes inženierkomunikāciju izbūvi vai pārbūvi, proti, tiks izbūvēts jauns ielas apgaismojums, jauna lietus kanalizācijas sistēma, jauns maģistrālais ūdensvads un sadzīves kanalizācijas tīkli t.sk., sūkņu stacija. Tiks pārbūvēti esošie AS "Sadales tīkls" elektrotīkli (iznesti ārpus ceļa braucamās daļas, nemainot tehniskos parametrus) un SIA "TET" optiskie tīkli (gaisvadu līnija tiks demontēta un izbūvēts pazemes kabelis). Ceļa posma pārbūvējamais garums - 760m. Projekta plānoto darbību rezultātā tiks izveidotas vismaz 20 jaunas darbavietas, piesaistītas nefinanšu investīcijas vismaz 818 897 EUR apmērā, degradētās teritorijas platība tiks samazināta par 0.78 ha.Projekta kopējie izdevumi ir 1 395 173,83 EUR, no tiem kopējie attiecināmie izdevumi 1 238 428,63 EUR. Atbalsta summa: 100 % no attiecināmajiem izdevumiem, nepārsniedzot 1 238 428,63 EUR, no tās: Eiropas Reģionālā attīstības fonda finansējums: 66,12% apmērā no attiecināmajiem izdevumiem, nepārsniedzot 818 897,00 EUR, Valsts budžeta dotācija pašvaldībām: 3,50 % no attiecināmajiem izdevumiem, nepārsniedzot 43 353,37 EURPašvaldības finansējums: 30,38 % no attiecināmajiem izdevumiem, nepārsniedzot 376 178,26 EURProjekta kopējie neattiecināmie izdevumi: 156 745,20 EUR, ko finansēs pašvaldība. Projektu ir paredzēts uzsākt 2020.gada 3.ceturksnī un īstenot līdz 2021.gada 3.ceturkšņa beigām. (Latvian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Electricity (storage and transmission) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Natural gas / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Water management and drinking water conservation (including river basin management, water supply, specific climate change adaptation measures, district and consumer metering, charging systems and leak reduction) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Other reconstructed or improved road (motorway, national, regional or local) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Business infrastructure for SMEs (including industrial parks and sites) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / intervention field | |||||||||||||||
Property / intervention field: Rehabilitation of industrial sites and contaminated land / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Rēzekne | |||||||||||||||
Property / location (string): Rēzekne / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Rēzekne | |||||||||||||||
Property / location (string): Rēzekne / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / location (string) | |||||||||||||||
Rēzekne | |||||||||||||||
Property / location (string): Rēzekne / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / fund | |||||||||||||||
Property / fund: European Regional Development Fund / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / programme | |||||||||||||||
Property / programme: Growth and Employment - LV - ERDF/ESF/CF/YEI / rank | |||||||||||||||
Normal rank |
Revision as of 10:12, 13 July 2021
Project Q3057476 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3057476 in Latvia |
Statements
818,897.0 Euro
0 references
1,238,428.63 Euro
0 references
1 July 2020
0 references
30 September 2021
0 references
RĒZEKNES PILSĒTAS DOME
0 references
Projekta mērķis ir ceļa savienojošā posma pārbūve no Maskavas ielas līdz dzelzceļam, reģenerējot degradētās teritorijas, atbilstoši pašvaldības attīstības programmai, nodrošinot videi draudzīgu un vides ilgtspēju veicinošu teritoriālo izaugsmi un jaunu darba vietu radīšanu. Galvenās darbības mērķa realizācijai ir ceļa savienojošā posma pārbūve, veicot asfaltbetona ceļa seguma pārbūvi un pazemes inženierkomunikāciju izbūvi vai pārbūvi, proti, tiks izbūvēts jauns ielas apgaismojums, jauna lietus kanalizācijas sistēma, jauns maģistrālais ūdensvads un sadzīves kanalizācijas tīkli t.sk., sūkņu stacija. Tiks pārbūvēti esošie AS "Sadales tīkls" elektrotīkli (iznesti ārpus ceļa braucamās daļas, nemainot tehniskos parametrus) un SIA "TET" optiskie tīkli (gaisvadu līnija tiks demontēta un izbūvēts pazemes kabelis). Ceļa posma pārbūvējamais garums - 760m. Projekta plānoto darbību rezultātā tiks izveidotas vismaz 20 jaunas darbavietas, piesaistītas nefinanšu investīcijas vismaz 818 897 EUR apmērā, degradētās teritorijas platība tiks samazināta par 0.78 ha.Projekta kopējie izdevumi ir 1 395 173,83 EUR, no tiem kopējie attiecināmie izdevumi 1 238 428,63 EUR. Atbalsta summa: 100 % no attiecināmajiem izdevumiem, nepārsniedzot 1 238 428,63 EUR, no tās: Eiropas Reģionālā attīstības fonda finansējums: 66,12% apmērā no attiecināmajiem izdevumiem, nepārsniedzot 818 897,00 EUR, Valsts budžeta dotācija pašvaldībām: 3,50 % no attiecināmajiem izdevumiem, nepārsniedzot 43 353,37 EURPašvaldības finansējums: 30,38 % no attiecināmajiem izdevumiem, nepārsniedzot 376 178,26 EURProjekta kopējie neattiecināmie izdevumi: 156 745,20 EUR, ko finansēs pašvaldība. Projektu ir paredzēts uzsākt 2020.gada 3.ceturksnī un īstenot līdz 2021.gada 3.ceturkšņa beigām. (Latvian)
0 references
Rēzekne
0 references
Rēzekne
0 references
Rēzekne
0 references
Identifiers
5.6.2.0/20/I/001
0 references