Construction of a walk bridge over the river Wałęsa together with the renovation of the religious site — a hood — and the restoration of the legacy of existing sources (Q132529): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): This project will be carried out in the Orneta’s ‘Valley of River Valley’ (Natura 2000 Natura site — PLH280006 River Pasłęka and the area of Protected Landscape of the Wałbrzych River). The phases of the implementation of the project: 1. Design documentation. 2. Feasibility study, 3. Construction work, including: Construction of a spanner in a steel structure with a bridge of strips on ropes or a steel frame (rolled or sheet strips) with a bridg...)
Property / summary
 
This project will be carried out in the Orneta’s ‘Valley of River Valley’ (Natura 2000 Natura site — PLH280006 River Pasłęka and the area of Protected Landscape of the Wałbrzych River). The phases of the implementation of the project: 1. Design documentation. 2. Feasibility study, 3. Construction work, including: Construction of a spanner in a steel structure with a bridge of strips on ropes or a steel frame (rolled or sheet strips) with a bridge and with a wood ball. A footbridge intended for walking and cycling. Building parameters for spammers: spreads in the light of the legs: up to ± 23.40 m, width of the footbridge: up to 1.8 m, height of barriers: up to 1.2 m. — Reerection of a cover for a wooden structure with a wooden roof covered with a reed cover, further to the state of archive photos together with the renovation works for repairing the root. — Remont Kapocacy, consisting of the exchange of plastering goods and the painting, replacement of doors in the door, with a concrete band which collects the moisture content in the foundation walls of the foundation. 4.Promotion of the project. The project is in conformity with the assumptions set out for Measure 5.3. in SzoOP ROP WiM. The objective of the project will be to achieve the objective of preserving and protecting the environment and promoting resource efficiency. It is planned to use the resources located in the reserve area of the “Wall River Valley” by adapting them to pursue tourist, leisure and educational objectives. Actions to improve the standard of the technical base and equip the reserve to strengthen the nature protection mechanism are planned within the framework of the project. (English)
Property / summary: This project will be carried out in the Orneta’s ‘Valley of River Valley’ (Natura 2000 Natura site — PLH280006 River Pasłęka and the area of Protected Landscape of the Wałbrzych River). The phases of the implementation of the project: 1. Design documentation. 2. Feasibility study, 3. Construction work, including: Construction of a spanner in a steel structure with a bridge of strips on ropes or a steel frame (rolled or sheet strips) with a bridge and with a wood ball. A footbridge intended for walking and cycling. Building parameters for spammers: spreads in the light of the legs: up to ± 23.40 m, width of the footbridge: up to 1.8 m, height of barriers: up to 1.2 m. — Reerection of a cover for a wooden structure with a wooden roof covered with a reed cover, further to the state of archive photos together with the renovation works for repairing the root. — Remont Kapocacy, consisting of the exchange of plastering goods and the painting, replacement of doors in the door, with a concrete band which collects the moisture content in the foundation walls of the foundation. 4.Promotion of the project. The project is in conformity with the assumptions set out for Measure 5.3. in SzoOP ROP WiM. The objective of the project will be to achieve the objective of preserving and protecting the environment and promoting resource efficiency. It is planned to use the resources located in the reserve area of the “Wall River Valley” by adapting them to pursue tourist, leisure and educational objectives. Actions to improve the standard of the technical base and equip the reserve to strengthen the nature protection mechanism are planned within the framework of the project. (English) / rank
 
Normal rank

Revision as of 13:04, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a walk bridge over the river Wałęsa together with the renovation of the religious site — a hood — and the restoration of the legacy of existing sources
Project in Poland financed by DG Regio

    Statements

    0 references
    1,801,976.28 zloty
    0 references
    432,474.3072 Euro
    13 January 2020
    0 references
    2,148,280.68 zloty
    0 references
    515,587.3632 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    9 December 2016
    0 references
    31 December 2020
    0 references
    SKARB PAŃSTWA -PAŃSTWOWE GOSPODARSTWO LEŚNE LASY PAŃSTWOWE - NADLEŚNICTWO ORNETA Z SIEDZIBĄ W ORNECIE
    0 references

    54°14'19.0"N, 20°7'32.9"E
    0 references
    Niniejszy projekt zostanie zrealizowany w zlokalizowanej na terenie Nadleśnictwa Orneta formie ochrony przyrody–Rezerwacie „Dolina rzeki Wałszy” (obszar Natura 2000–PLH280006 Rzeka Pasłęka oraz Obszar Chronionego Krajobrazu Rzeki Wałszy). Etapy realizacji projektu: 1. Dokumentacja projektowa. 2. Opracowanie studium wykonalności, 3. Roboty budowlane, w tym: - Odbudowa kładki spacerowej w konstrukcji stalowej z pomostem z desek na linach lub o konstrukcji stalowej (dwuteowniki walcowane albo blachownice) z pomostem i balustradą z drewna. Kładka przeznaczona do ruchu pieszego i rowerowego. Parametry zabudowy dla kładki spacerowej: rozpiętość kładki w świetle podpór: do +/- 23,40 m, szerokość kładki: do 1,8 m, wysokość barierek: do 1,2 m. -Odbudowa drogi do kładki spacerowej (droga technologiczna na czas budowy kładki, w perspektywie do ruchu pieszego i rowerowego) przebieg drogi od strony Pieniężno 1 do Doliny Rzeki Wałszy. -Odbudowa zadaszenia źródełka o konstrukcji drewnianej z dachem czterospadowym pokrytym trzciną w nawiązaniu do stanu z archiwalnych zdjęć wraz z pracami remontowymi dotyczącymi naprawy umocnień zejścia do źródełka. -Remont Kaplicy Narodzenia polegający na wymianie tynków zewnętrznych wraz z malowaniem, wymianie stolarki drzwiowej kapliczki, zbiciu betonowej opaski, która ściąga wilgoć do ścian fundamentowych obiektu. 4.Promocja projektu. Projekt pozostaje w zgodności z założeniami określonymi dla Działania 5.3. w SzOOP RPO WiM. Realizacja projektu we wskazanym zakresie umożliwi osiągnięcie celu działania tj. zachowania i ochrony środowiska oraz promowania efektywnego gospodarowania zasobami. Zaplanowano wykorzystanie zasobów znajdujących się na terenie rezerwatu „Dolina Rzeki Wałszy” poprzez ich przystosowanie do realizowania celów turystyczno-rekreacyjnych oraz edukacyjnych. W ramach przedsięwzięcia zaplanowano działania podnoszące standard bazy technicznej i wyposażenie rezerwatu umożliwiające wzmocnienie mechanizmu ochrony przyrody. (Polish)
    0 references
    This project will be carried out in the Orneta’s ‘Valley of River Valley’ (Natura 2000 Natura site — PLH280006 River Pasłęka and the area of Protected Landscape of the Wałbrzych River). The phases of the implementation of the project: 1. Design documentation. 2. Feasibility study, 3. Construction work, including: Construction of a spanner in a steel structure with a bridge of strips on ropes or a steel frame (rolled or sheet strips) with a bridge and with a wood ball. A footbridge intended for walking and cycling. Building parameters for spammers: spreads in the light of the legs: up to ± 23.40 m, width of the footbridge: up to 1.8 m, height of barriers: up to 1.2 m. — Reerection of a cover for a wooden structure with a wooden roof covered with a reed cover, further to the state of archive photos together with the renovation works for repairing the root. — Remont Kapocacy, consisting of the exchange of plastering goods and the painting, replacement of doors in the door, with a concrete band which collects the moisture content in the foundation walls of the foundation. 4.Promotion of the project. The project is in conformity with the assumptions set out for Measure 5.3. in SzoOP ROP WiM. The objective of the project will be to achieve the objective of preserving and protecting the environment and promoting resource efficiency. It is planned to use the resources located in the reserve area of the “Wall River Valley” by adapting them to pursue tourist, leisure and educational objectives. Actions to improve the standard of the technical base and equip the reserve to strengthen the nature protection mechanism are planned within the framework of the project. (English)
    0 references

    Identifiers

    RPWM.05.03.00-28-0016/19
    0 references