Q2769338 (Q2769338): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: import item from Greece) |
(Created claim: summary (P836): <p></p><p><span style="font-size: 8.0pt;color: Black?">The object of the project is the construction of wastewater drainage networks and sewage treatment plant (EEL) in T.K. Damasiou Municipality of Tyrnavos, where there are no infrastructures for the management of waste water and the management is done through private sewage. In recent times, soil saturation with liquid waste has occurred, resulting in </span><span style="color: Black?font-size...) |
||||||||||||||
Property / summary | |||||||||||||||
<p></p><p><span style="font-size: 8.0pt;color: Black?">The object of the project is the construction of wastewater drainage networks and sewage treatment plant (EEL) in T.K. Damasiou Municipality of Tyrnavos, where there are no infrastructures for the management of waste water and the management is done through private sewage. In recent times, soil saturation with liquid waste has occurred, resulting in </span><span style="color: Black?font-size: 8pt?">the overflow of absorbing sewage systems and the surface drainage of unprocessed sewage inside the settlement. The work will be done with the aim of protecting public health and improving the quality of life of the inhabitants of the TK and the management of the water resources of the area.</span></p></p> (English) | |||||||||||||||
Property / summary: <p></p><p><span style="font-size: 8.0pt;color: Black?">The object of the project is the construction of wastewater drainage networks and sewage treatment plant (EEL) in T.K. Damasiou Municipality of Tyrnavos, where there are no infrastructures for the management of waste water and the management is done through private sewage. In recent times, soil saturation with liquid waste has occurred, resulting in </span><span style="color: Black?font-size: 8pt?">the overflow of absorbing sewage systems and the surface drainage of unprocessed sewage inside the settlement. The work will be done with the aim of protecting public health and improving the quality of life of the inhabitants of the TK and the management of the water resources of the area.</span></p></p> (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: <p></p><p><span style="font-size: 8.0pt;color: Black?">The object of the project is the construction of wastewater drainage networks and sewage treatment plant (EEL) in T.K. Damasiou Municipality of Tyrnavos, where there are no infrastructures for the management of waste water and the management is done through private sewage. In recent times, soil saturation with liquid waste has occurred, resulting in </span><span style="color: Black?font-size: 8pt?">the overflow of absorbing sewage systems and the surface drainage of unprocessed sewage inside the settlement. The work will be done with the aim of protecting public health and improving the quality of life of the inhabitants of the TK and the management of the water resources of the area.</span></p></p> (English) / qualifier | |||||||||||||||
point in time: 2 July 2021
|
Revision as of 13:40, 2 July 2021
Project Q2769338 in Greece
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2769338 in Greece |
Statements
4,898,572.0 Euro
0 references
80.0 percent
0 references
1 February 2019
0 references
31 January 2023
0 references
ΔΕΥΑ ΤΥΡΝΑΒΟΥ
0 references
<p></p><p><span style="font-size: 8.0pt;color: black;">Το αντικείμενο του έργου είναι η κατασκευή των δικτύων αποχέτευσης ακαθάρτων και της εγκατάστασης επεξεργασίας λυμάτων (ΕΕΛ) στην Τ.Κ. Δαμασίου του Δήμου Τυρνάβου, στην οποία δεν υπάρχουν υποδομές για την διαχείριση των λυμάτων και η διαχείριση γίνεται μέσω ιδιωτικών βόθρων. Το τελευταίο διάστημα έχει επέλθει κορεσμός του εδάφους με υγρά απόβλητα, με αποτέλεσμα </span><span style="color: black;font-size: 8pt;">την υπερχείλιση των συστημάτων απορροφητικών βόθρων και την επιφανειακή απορροή των ανεπεξέργαστων λυμάτων μέσα στον οικισμό. Οι εργασίες θα γίνουν με σκοπό την προστασία της δημόσιας υγείας και την βελτίωση της ποιότητας ζωής των κατοίκων της Τ.Κ. και της διαχείρισης των υδάτινων πόρων της περιοχής.</span></p><p></p> (Greek)
0 references
<p></p><p><span style="font-size: 8.0pt;color: Black?">The object of the project is the construction of wastewater drainage networks and sewage treatment plant (EEL) in T.K. Damasiou Municipality of Tyrnavos, where there are no infrastructures for the management of waste water and the management is done through private sewage. In recent times, soil saturation with liquid waste has occurred, resulting in </span><span style="color: Black?font-size: 8pt?">the overflow of absorbing sewage systems and the surface drainage of unprocessed sewage inside the settlement. The work will be done with the aim of protecting public health and improving the quality of life of the inhabitants of the TK and the management of the water resources of the area.</span></p></p> (English)
2 July 2021
0 references
Identifiers
5.010.807
0 references