| Conception - Réalisation d'une infrastructure locale de fourreaux et de fibres optiques
|
label / en | label / en |
| Design – Development of a local fibre and foil infrastructure
|
description / en | description / en |
| Project Q192819 in France
|
description / fr | description / fr |
| Projet Q192819 en France
|
Property / French Kohesio ID | |
| 11670
| |
Property / French Kohesio ID: 11670 / rank | |
| Normal rank
| |
Property / instance of | |
| | |
Property / instance of: Kohesio project / rank | |
| Normal rank
| |
Property / country | |
| | |
Property / country: France / rank | |
| Normal rank
| |
Property / EU contribution | |
| 2,564,025.7 EuroAmount | 2,564,025.7 Euro |
---|
Unit | Euro |
---|
| |
Property / EU contribution: 2,564,025.7 Euro / rank | |
| Normal rank
| |
Property / budget | |
| 6,367,086.41 EuroAmount | 6,367,086.41 Euro |
---|
Unit | Euro |
---|
| |
Property / budget: 6,367,086.41 Euro / rank | |
| Normal rank
| |
Property / postal code | |
| 97307
| |
Property / postal code: 97307 / rank | |
| Normal rank
| |
Property / start time | |
| 1 February 2018Timestamp | +2018-02-01T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / start time: 1 February 2018 / rank | |
| Normal rank
| |
Property / end time | |
| 31 December 2018Timestamp | +2018-12-31T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / end time: 31 December 2018 / rank | |
| Normal rank
| |
Property / beneficiary name (string) | |
| Société Publique Locale pour l'aménagement numérique de la Guyane
| |
Property / beneficiary name (string): Société Publique Locale pour l'aménagement numérique de la Guyane / rank | |
| Normal rank
| |
Property / summary | |
| Cette opération a pour objet le déploiement d’une infrastructure de fourreaux au sein du territoire de la Ville de Saint Laurent du Maroni. Le projet est divisé en deux axes, dont la réalisation n’est pas séquencée temporellement. Dans le cadre du premier axe, le titulaire devra déployer une infrastructure de fourreaux et de fibre optique pour 44 sites du patrimoine municipal, devant être reliés entre eux (« interconnexion municipale »). Dans le cadre du deuxième axe, le titulaire devra réaliser une infrastructure de fourreaux et de fibre optique pour deux catégories de sites : - D’une part, des sites d’intérêts économiques constitués d’administrations et de zones d’aménagements sur 29,8 km ; - D’autre part, des carbets numériques, qui seront des points d’accès numériques pour les zones les moins connectées de la Ville, sur 38,5 km. (French)
| |
Property / summary: Cette opération a pour objet le déploiement d’une infrastructure de fourreaux au sein du territoire de la Ville de Saint Laurent du Maroni. Le projet est divisé en deux axes, dont la réalisation n’est pas séquencée temporellement. Dans le cadre du premier axe, le titulaire devra déployer une infrastructure de fourreaux et de fibre optique pour 44 sites du patrimoine municipal, devant être reliés entre eux (« interconnexion municipale »). Dans le cadre du deuxième axe, le titulaire devra réaliser une infrastructure de fourreaux et de fibre optique pour deux catégories de sites : - D’une part, des sites d’intérêts économiques constitués d’administrations et de zones d’aménagements sur 29,8 km ; - D’autre part, des carbets numériques, qui seront des points d’accès numériques pour les zones les moins connectées de la Ville, sur 38,5 km. (French) / rank | |
| Normal rank
| |
Property / summary | |
| The purpose of this operation is to deploy a crap infrastructure within the territory of the City of Saint Laurent du Maroni. The project is divided into two axes, the realisation of which is not temporally sequenced. As part of the first axis, the licensee will be required to deploy crap and fibre-optic infrastructure for 44 municipal heritage sites, to be linked to each other (“municipal interconnection”). As part of the second axis, the holder will have to build a crap and fibre-optic infrastructure for two categories of sites: — On the one hand, sites of economic interest consisting of administrations and development areas covering 29,8 km; — On the other hand, digital carbets, which will be digital access points for the least connected areas of the city, over 38.5 km. (English)
| |
Property / summary: The purpose of this operation is to deploy a crap infrastructure within the territory of the City of Saint Laurent du Maroni. The project is divided into two axes, the realisation of which is not temporally sequenced. As part of the first axis, the licensee will be required to deploy crap and fibre-optic infrastructure for 44 municipal heritage sites, to be linked to each other (“municipal interconnection”). As part of the second axis, the holder will have to build a crap and fibre-optic infrastructure for two categories of sites: — On the one hand, sites of economic interest consisting of administrations and development areas covering 29,8 km; — On the other hand, digital carbets, which will be digital access points for the least connected areas of the city, over 38.5 km. (English) / rank | |
| Normal rank
| |
Property / summary: The purpose of this operation is to deploy a crap infrastructure within the territory of the City of Saint Laurent du Maroni. The project is divided into two axes, the realisation of which is not temporally sequenced. As part of the first axis, the licensee will be required to deploy crap and fibre-optic infrastructure for 44 municipal heritage sites, to be linked to each other (“municipal interconnection”). As part of the second axis, the holder will have to build a crap and fibre-optic infrastructure for two categories of sites: — On the one hand, sites of economic interest consisting of administrations and development areas covering 29,8 km; — On the other hand, digital carbets, which will be digital access points for the least connected areas of the city, over 38.5 km. (English) / qualifier | |
| point in time: 13 October 2020Timestamp | +2020-10-13T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / coordinate location | |
| 4°56'20.58"N, 52°20'9.82"WLatitude | 4.93904965 |
---|
Longitude | -52.33605895 |
---|
Precision | 1.0E-5 |
---|
Globe | http://www.wikidata.org/entity/Q2 |
---|
| |
Property / coordinate location: 4°56'20.58"N, 52°20'9.82"W / rank | |
| Normal rank
| |
Property / financed by | |
| | |
Property / financed by: European Union / rank | |
| Normal rank
| |
Property / programme | |
| | |
Property / programme: Guyane - ERDF/ESF / rank | |
| Normal rank
| |
Property / co-financing rate | |
| | |
Property / co-financing rate: 40.27 percent / rank | |
| Normal rank
| |
Property / beneficiary | |
| | |
Property / beneficiary: Q2539444 / rank | |
| Normal rank
| |
Property / ID used by InfoRegio | |
| 4720
| |
Property / ID used by InfoRegio: 4720 / rank | |
| Normal rank
| |
Property / info Regio url | |
| | |
Property / info Regio url: https://ec.europa.eu/regional_policy/en/projects/europe/lamenagement-numerique-de-louest-guyanais / rank | |
| Normal rank
| |
Property / image url | |
| | |
Property / image url: https://ec.europa.eu/regional_policy/rest/projects/upload/4720.jpg / rank | |
| Normal rank
| |
Property / image url: https://ec.europa.eu/regional_policy/rest/projects/upload/4720.jpg / qualifier | |
| summary: AgreenTech Valley, a hub dedicated to digital technologies for the crop sector. (English) | |
Property / image url: https://ec.europa.eu/regional_policy/rest/projects/upload/4720.jpg / qualifier | |
| | |
Property / fund | |
| | |
Property / fund: European Regional Development Fund / rank | |
| Normal rank
| |
Property / contained in NUTS | |
| | |
Property / contained in NUTS: Guyane / rank | |
| Normal rank
| |