Remediation of the slopes in the village Žabokliky (Q58041): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed an Item: Change because item Q214253 was merged with Q4863)
Property / contained in NUTSProperty / contained in NUTS

Revision as of 17:32, 27 December 2020

Project Q58041 in Czech Republic
Language Label Description Also known as
English
Remediation of the slopes in the village Žabokliky
Project Q58041 in Czech Republic

    Statements

    0 references
    648,067.19 Czech koruna
    0 references
    25,922.69 Euro
    10 January 2020
    0 references
    762,431.99 Czech koruna
    0 references
    30,497.28 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    27 May 2016
    0 references
    31 August 2018
    0 references
    31 August 2018
    0 references
    Obec Nové Sedlo
    0 references
    0 references
    0 references

    50°19'26.26"N, 13°32'28.79"E
    0 references

    50°18'44.28"N, 13°31'58.12"E
    0 references

    50°16'53.29"N, 13°26'32.96"E
    0 references
    43801
    0 references
    Stavbou je obnova sesuté části svahu pozemku p. č. 394/22 v obci Žabokliky - Nové Sedlo na Žatecku (svah III. kategorie) v délce 14,0 m a odvedení přívalových dešťových vod mimo vlastní oblast sesuvu. Jedná se o výstavbu gabionové zdi pod stávajícím sesuvem výšky nad terénem 2,0 m. Stavba je v souladu s územně plánovací dokumentací. Stavbou se nijak nemění stávají využití území. Plocha nově stabilizovaných objektů je v místě sanace sesuvu 0,025 ha. (Czech)
    0 references
    The construction is a reconstruction of the decomposed part of the slope of land p. 394/22 in the village Žabokliky – Nové Sedlo in Žateck (swall of category III) in the length of 14.0 m and the removal of torrential rainwater outside the landslide’s own area. This is the construction of a gabiono wall under the existing landslide of height above the terrain 2,0 m. The construction is in accordance with the territorial planning documentation. Construction does not change in any way become land use. The area of newly stabilised buildings is in the place of remediation of 0.025 ha. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/16_034/0002256
    0 references