Construction of a section of the G-class road from the intersection of ul. Polish Army from St. Downtown to the design of the Jarocin bypass junction. (Q135184): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 2 languages: Changing unique label-description pair) |
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
||
Property / financed by | |||
Property / financed by: Directorate-General for Regional and Urban Policy / rank | |||
Revision as of 19:33, 29 October 2020
Project Q135184 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a section of the G-class road from the intersection of ul. Polish Army from St. Downtown to the design of the Jarocin bypass junction. |
Project Q135184 in Poland |
Statements
11,931,289.7 zloty
0 references
15,908,386.27 zloty
0 references
75.0 percent
0 references
5 October 2015
0 references
9 November 2018
0 references
GMINA JAROCIN
0 references
Przedmiotem projektu jest budowa drogi gminnej klasy G od skrzyżowania ul. Wojska Polskiego z ul. Śródmiejską o dł. 1830,0 m (0+000 km –1+830 km) w tym 1779,0 m (0+000 km - 1+779 km) kwalifikowanego, o nośności 115kN/oś, z kategorią ruchu KR3, do „węzła Jarocin” w ciągu drogi ekspresowej S11. Na projekt składają się elementy robót: a) budowa drogi o dł. 1830,0 m i szer. 7,0 m (przy łukach i zjazdach do 12,0 m) o nawierzchni bitumicznej, w tym 1779,0 m kwalifikowanego; b) budowa chodników o łącznej dł. 1776,0 m i szer. (1,5 m do 3,5 m) z kostki betonowej; c) budowa dróg rowerowych (długość wspartej infrastruktury rowerowej) o łącznej dł. 1576,0 m i szer. (2,2 m do 2,5 m) o nawierzchni bitumicznej; d) budowa 2 rond (o śr. zew. 31,0 m i szer. pasa ruchu 5,5 m), 1 skrzyżowania zwykłego z drogą gminną; e) montaż balustrad ochronnych: typu U-11a o dł. 245,0 m; f) budowa odwodnienia: kanalizacji deszczowej o dł. 2040,18 m i przydrożnych rowów o dł. 801,0 m g) budowa kanału technologicznego o dł. 1665,0 m; h) budowa 12 przejść dla pieszych; i) budowa 4 zatok autobusowych o głębokości 3,0 m; j) budowa nowego oświetlenia ulicznego (60 punktów świetlnych); k) budowa 2 przepustów (obiektów infrastruktury drogowej) na rowach melioracyjnych przecinających budowaną drogę o łącznej dł. 42,6m oraz 3 przepustów pod zjazdami w ciągu rowów przydrożnych (nie ujęte we wskaźnikach produktu); l) ułożenie opaski drenarskiej (od ul. Glinki do włączenia w S11) o dł. 6.050,3 m; m) montaż 189 nowych znaków i tablic pionowych oraz 14 słupków przeszkodowych; n) budowa 1 muru oporowego o dł. 55,0 m jako zabezpieczenie skarpy nasypu drogi przy stawie; o) przebudowa infrastruktury kolidującej z inwestycją (sieć wodociągowa, kanalizacyjna, gazowa, oświetlenia drogowego; sieć elektroenergetyczna ENERGA, PKP Energetyka; sieć telekomunikacyjna ORANGE). (Polish)
0 references
The object of the project is the construction of a G-class road from the intersection of ul. Polish Army from St. Downtown by long. 1830.0 m (0 + 000 km – 1 + 830 km) of which 1779.0 m (0 + 000 km – 1+ 779 km) qualified, with a load capacity of 115kN/axis, with KR3 traffic category, to the “Jarocin node” within the S11 expressway. The project consists of elements of works: construction of the road by length. 1830.0 m and wide. 7,0 m (for arches and descents up to 12,0 m) with bituminous surface, including 1779,0 m qualified; the construction of pavements with a total length. 1776.0 m and wide. (1.5 m to 3,5 m) of concrete cube; the construction of bicycle roads (length of supported bicycle infrastructure) with a total length. 1576.0 m and wide. (2.2 m to 2,5 m) with bituminous surface; d) construction of 2 roundabouts (w. zw. 31.0 m and wide lane 5.5 m), 1 junction with municipal road; installation of protective balustrades: U-11a type by long. 245,0 m; construction of dehydration: rainwater Sewerage. 2040.18 m and road ditches long. 801.0 m g) construction of the technological canal by length. 1665,0 m; construction of 12 pedestrian crossings; construction of 4 bus bays with a depth of 3,0 m; construction of new street lighting (60 light points); construction of 2 culverts (road infrastructure facilities) on drainage ditches crossing the built road with a total length. 42,6 m and 3 culverts under exits within road ditches (not included in product indicators); L) installation of the drain band (from ul. Clays to be insulated in S11) 6050,3 m; m) mounting 189 new vertical signs and boards and 14 obstruction posts; construction of 1 resistance wall length. 55,0 m as a protection of the embankment of the road at the pond; O) Reconstruction of the infrastructure conflicting with the investment (water, sewage, gas, road lighting; electricity grid ENERGA, PKP Energetyka; telecommunication network ORANGE). (English)
21 October 2020
0 references
Identifiers
RPWP.05.01.02-30-0015/16
0 references