(Created claim: summary (P836): The construction is a reconstruction of the decomposed part of the slope of land p. 394/22 in the village Žabokliky – Nové Sedlo in Žateck (swall of category III) in the length of 14.0 m and the removal of torrential rainwater outside the landslide’s own area. This is the construction of a gabiono wall under the existing landslide of height above the terrain 2,0 m. The construction is in accordance with the territorial planning documentation. Co...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 17:44, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Czech Republic financed by DG Regio |
Statements
648,067.19 Czech koruna
0 references
762,431.99 Czech koruna
0 references
85.0 percent
0 references
27 May 2016
0 references
31 August 2018
0 references
31 August 2018
0 references
Obec Nové Sedlo
0 references
43801
0 references
Stavbou je obnova sesuté části svahu pozemku p. č. 394/22 v obci Žabokliky - Nové Sedlo na Žatecku (svah III. kategorie) v délce 14,0 m a odvedení přívalových dešťových vod mimo vlastní oblast sesuvu. Jedná se o výstavbu gabionové zdi pod stávajícím sesuvem výšky nad terénem 2,0 m. Stavba je v souladu s územně plánovací dokumentací. Stavbou se nijak nemění stávají využití území. Plocha nově stabilizovaných objektů je v místě sanace sesuvu 0,025 ha. (Czech)
0 references
The construction is a reconstruction of the decomposed part of the slope of land p. 394/22 in the village Žabokliky – Nové Sedlo in Žateck (swall of category III) in the length of 14.0 m and the removal of torrential rainwater outside the landslide’s own area. This is the construction of a gabiono wall under the existing landslide of height above the terrain 2,0 m. The construction is in accordance with the territorial planning documentation. Construction does not change in any way become land use. The area of newly stabilised buildings is in the place of remediation of 0.025 ha. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.24/0.0/0.0/16_034/0002256
0 references