Modernisation and retrofitting of the rural centre in Loms in order to adapt to modern cultural activities (Q132594): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): Modernised and retro-fitting building will be built in the village building in Loms (No 14-3/13; 8, Unit No 3/13, room 14 of Liki, Gmina Sępopol, pow. botoszycki), located under substantive care of M-GOK in Sępopol. Scope of construction work: • Renovation of the roof — including: the renovation of the Storm (73.6 m), the exchange of desking (410.7 m²), the exchange of caulting (410.7 m²), the new blachard and the lightning system. • Renewal o...) |
(Created claim: summary (P836): The building of the village common room in Liska (building number 14-3/13;8, Działka nr 3/13, part 14 of Liska, Sępopol Municipality, Bartoszycki district) will be modernised and upgraded, under the substantive care of M-GOK in Sępopol. Scope of construction works in Project: • Upgrading of the roof – including: overhaul of rafters (73,6 m), formwork replacement (410.7 m²), patch replacement (410.7 m²), new sheet metalworking and lightning insta...) |
||||||||||||||
Property / summary | |||||||||||||||
The building of the village common room in Liska (building number 14-3/13;8, Działka nr 3/13, part 14 of Liska, Sępopol Municipality, Bartoszycki district) will be modernised and upgraded, under the substantive care of M-GOK in Sępopol. Scope of construction works in Project: • Upgrading of the roof – including: overhaul of rafters (73,6 m), formwork replacement (410.7 m²), patch replacement (410.7 m²), new sheet metalworking and lightning installation. • Restoration of the ceiling – replacement of the ceiling beams (17.5 m), replacement of the ceiling (39 m²), reflection of the old and the location of new plasters (39 m²). • Reconstruction of chimneys (4.5 m³). • Modernisation of rooms in the building – including: plaster replenishment (140 m²), felting of existing plasters (457 m²), surface painting (678 m²), ceiling painting (285 m²), panel painting (192 m²), non-slip tiles (46 m²), interior doors (18.4 m²), stage renovation (22 m²), wooden stairs (16 degrees). • Replacement of windows (26.15 m²), exchange of doors for anti-burglary (2 pieces). • Repair of external stairs, non-slip tiles linings, stairways (19.5 m), paving in front of the building with concrete cube (120 m²). • Installations – including: water pipe, sewerage, C.O. installation, steel radiators (13 pcs.). • Electrical installation – including: cables (750 mb), replacement of LED lighting (63 pcs). In addition, modern durable equipment is purchased (full list in the Project schedule). Stages of implementation Project: — preparatory stage – technical doc. and feasibility study, – selection of contractor for construction works and equipment supplier in accordance with the PZP Act, – execution and reception of construction works and equipment delivery, – settlement of the investment. The project, by increasing the number of people benefiting from the broadened cultural offer of the rural community centre in Liska, is part of the specific objective of SZOOP for RPO WiM Submeasure 6.1.2 More people benefiting from the offer of cultural institutions building regional identity in the voivodship. (English) | |||||||||||||||
Property / summary: The building of the village common room in Liska (building number 14-3/13;8, Działka nr 3/13, part 14 of Liska, Sępopol Municipality, Bartoszycki district) will be modernised and upgraded, under the substantive care of M-GOK in Sępopol. Scope of construction works in Project: • Upgrading of the roof – including: overhaul of rafters (73,6 m), formwork replacement (410.7 m²), patch replacement (410.7 m²), new sheet metalworking and lightning installation. • Restoration of the ceiling – replacement of the ceiling beams (17.5 m), replacement of the ceiling (39 m²), reflection of the old and the location of new plasters (39 m²). • Reconstruction of chimneys (4.5 m³). • Modernisation of rooms in the building – including: plaster replenishment (140 m²), felting of existing plasters (457 m²), surface painting (678 m²), ceiling painting (285 m²), panel painting (192 m²), non-slip tiles (46 m²), interior doors (18.4 m²), stage renovation (22 m²), wooden stairs (16 degrees). • Replacement of windows (26.15 m²), exchange of doors for anti-burglary (2 pieces). • Repair of external stairs, non-slip tiles linings, stairways (19.5 m), paving in front of the building with concrete cube (120 m²). • Installations – including: water pipe, sewerage, C.O. installation, steel radiators (13 pcs.). • Electrical installation – including: cables (750 mb), replacement of LED lighting (63 pcs). In addition, modern durable equipment is purchased (full list in the Project schedule). Stages of implementation Project: — preparatory stage – technical doc. and feasibility study, – selection of contractor for construction works and equipment supplier in accordance with the PZP Act, – execution and reception of construction works and equipment delivery, – settlement of the investment. The project, by increasing the number of people benefiting from the broadened cultural offer of the rural community centre in Liska, is part of the specific objective of SZOOP for RPO WiM Submeasure 6.1.2 More people benefiting from the offer of cultural institutions building regional identity in the voivodship. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The building of the village common room in Liska (building number 14-3/13;8, Działka nr 3/13, part 14 of Liska, Sępopol Municipality, Bartoszycki district) will be modernised and upgraded, under the substantive care of M-GOK in Sępopol. Scope of construction works in Project: • Upgrading of the roof – including: overhaul of rafters (73,6 m), formwork replacement (410.7 m²), patch replacement (410.7 m²), new sheet metalworking and lightning installation. • Restoration of the ceiling – replacement of the ceiling beams (17.5 m), replacement of the ceiling (39 m²), reflection of the old and the location of new plasters (39 m²). • Reconstruction of chimneys (4.5 m³). • Modernisation of rooms in the building – including: plaster replenishment (140 m²), felting of existing plasters (457 m²), surface painting (678 m²), ceiling painting (285 m²), panel painting (192 m²), non-slip tiles (46 m²), interior doors (18.4 m²), stage renovation (22 m²), wooden stairs (16 degrees). • Replacement of windows (26.15 m²), exchange of doors for anti-burglary (2 pieces). • Repair of external stairs, non-slip tiles linings, stairways (19.5 m), paving in front of the building with concrete cube (120 m²). • Installations – including: water pipe, sewerage, C.O. installation, steel radiators (13 pcs.). • Electrical installation – including: cables (750 mb), replacement of LED lighting (63 pcs). In addition, modern durable equipment is purchased (full list in the Project schedule). Stages of implementation Project: — preparatory stage – technical doc. and feasibility study, – selection of contractor for construction works and equipment supplier in accordance with the PZP Act, – execution and reception of construction works and equipment delivery, – settlement of the investment. The project, by increasing the number of people benefiting from the broadened cultural offer of the rural community centre in Liska, is part of the specific objective of SZOOP for RPO WiM Submeasure 6.1.2 More people benefiting from the offer of cultural institutions building regional identity in the voivodship. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 18:09, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation and retrofitting of the rural centre in Loms in order to adapt to modern cultural activities |
Project in Poland financed by DG Regio |
Statements
290,638.52 zloty
0 references
345,998.24 zloty
0 references
84.0 percent
0 references
19 September 2017
0 references
30 November 2018
0 references
GMINA SĘPOPOL
0 references
Zmodernizowany i doposażony zostanie budynek świetlicy wiejskiej w Liskach (nr budynku 14-3/13;8, Działka nr 3/13, obręb 14 Liski, Gmina Sępopol, pow. bartoszycki), znajdujący się pod opieką merytoryczną M-GOK w Sępopolu. Zakres robót budowlanych w Proj.: • Modernizacja dachu -w tym: remont krokwi (73,6m), wymiana deskowania (410,7m2), wymiana łacenia (410,7m2), nowe obróbki blacharskie i instalacja odgromowa. • Odnowienie stropu -wymiana belek stropowych (17,5 m), wymiana podsufitki (39 m2), odbicie starych i położenie nowych tynków (39 m2). • Przebudowa kominów (4,5m3). • Modernizacja pomieszczeń w budynku – w tym: uzupełnienie tynków (140m2), filcowanie istniejących tynków (457m2), malowanie powierzchni wew.(678m2), malowanie sufitów (285m2), malowanie posadzek z desek (192m2), płytki antypoślizgowe (46m2), drzwi wewnętrzne (18,4m2), remont sceny (22m2), schody drewniane (16 stopni). • Wymiana okien (26,15m2), wymiana drzwi zew. na antywłamaniowe (2 szt.). • Naprawa schodów zewnętrznych, okładziny z płytek antypoślizgowych, balustrady schodowe (19,5m), nawierzchnia przed budynkiem z kostki betonowej (120 m2). • Instalacje –w tym: rurociąg wodociągowy, kanalizacyjny, instalacji C.O., grzejniki stalowe (13 szt.). • Instalacja elektryczna -w tym: przewody kablowe (750 mb), wymiana oświetlenia na LED-owe (63 szt.). Dodatkowo zakupione zostaje nowoczesne trwałe wyposażenie (pełna lista w harmonogramie Proj.). Etapy realizacji Proj.: - etap przygotowawczy - dok. techniczna i Studium Wykonalności, - wyłonienie wykonawcy robót bud. i dostawcy wyposażenia zgodnie z Ustawą PZP, - wykonanie i odbiór robót budowlanych oraz dostawa wyposażenia, - rozliczenie inwestycji. Projekt, poprzez zwiększanie liczby osób korzystających z poszerzonej oferty kulturalnej świetlicy wiejskiej w Liskach, wpisuje się w zawarty w SZOOP dla RPO WiM cel szczegółowy Poddziałania 6.1.2 Więcej ludzi korzystających z oferty instytucji kultury budujących tożsamość regionalną w woj. (Polish)
0 references
The building of the village common room in Liska (building number 14-3/13;8, Działka nr 3/13, part 14 of Liska, Sępopol Municipality, Bartoszycki district) will be modernised and upgraded, under the substantive care of M-GOK in Sępopol. Scope of construction works in Project: • Upgrading of the roof – including: overhaul of rafters (73,6 m), formwork replacement (410.7 m²), patch replacement (410.7 m²), new sheet metalworking and lightning installation. • Restoration of the ceiling – replacement of the ceiling beams (17.5 m), replacement of the ceiling (39 m²), reflection of the old and the location of new plasters (39 m²). • Reconstruction of chimneys (4.5 m³). • Modernisation of rooms in the building – including: plaster replenishment (140 m²), felting of existing plasters (457 m²), surface painting (678 m²), ceiling painting (285 m²), panel painting (192 m²), non-slip tiles (46 m²), interior doors (18.4 m²), stage renovation (22 m²), wooden stairs (16 degrees). • Replacement of windows (26.15 m²), exchange of doors for anti-burglary (2 pieces). • Repair of external stairs, non-slip tiles linings, stairways (19.5 m), paving in front of the building with concrete cube (120 m²). • Installations – including: water pipe, sewerage, C.O. installation, steel radiators (13 pcs.). • Electrical installation – including: cables (750 mb), replacement of LED lighting (63 pcs). In addition, modern durable equipment is purchased (full list in the Project schedule). Stages of implementation Project: — preparatory stage – technical doc. and feasibility study, – selection of contractor for construction works and equipment supplier in accordance with the PZP Act, – execution and reception of construction works and equipment delivery, – settlement of the investment. The project, by increasing the number of people benefiting from the broadened cultural offer of the rural community centre in Liska, is part of the specific objective of SZOOP for RPO WiM Submeasure 6.1.2 More people benefiting from the offer of cultural institutions building regional identity in the voivodship. (English)
21 October 2020
0 references
Identifiers
RPWM.06.01.02-28-0015/17
0 references