Centre for Social Services and Local Activity SATURN in Chechnya, (Q125997): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): As a result of an in-kind project, former electrical workshops and the building of former KWK Saturn will be transformed to the needs of the Centre for Social Services and Local Activity (workshops of artistic creation, education and physical activity, office space with their hinterland). All necessary repairs and construction works contributing to the new features of the facilities are foreseen. Buildings will be linked together with each oth...)
Property / summary
As a result of an in-kind project, former electrical workshops and the building of former KWK Saturn will be transformed to the needs of the Centre for Social Services and Local Activity (workshops of artistic creation, education and physical activity, office space with their hinterland). All necessary repairs and construction works contributing to the new features of the facilities are foreseen. Buildings will be linked together with each other with a glass link, with a communication function between the premises and functional functionality. (English)
 
Property / summary: As a result of an in-kind project, former electrical workshops and the building of former KWK Saturn will be transformed to the needs of the Centre for Social Services and Local Activity (workshops of artistic creation, education and physical activity, office space with their hinterland). All necessary repairs and construction works contributing to the new features of the facilities are foreseen. Buildings will be linked together with each other with a glass link, with a communication function between the premises and functional functionality. (English) / rank
Normal rank
 

Revision as of 10:27, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Centre for Social Services and Local Activity SATURN in Chechnya,
Project in Poland financed by DG Regio

    Statements

    0 references
    2,561,130.0 zloty
    0 references
    614,671.2 Euro
    13 January 2020
    0 references
    3,900,000.0 zloty
    0 references
    936,000.0 Euro
    13 January 2020
    0 references
    65.67 percent
    0 references
    22 January 2018
    0 references
    31 October 2019
    0 references
    MIASTO CZELADŹ
    0 references
    0 references
    Na skutek rzeczowej realizacji projektu budynek dawnych warsztatów elektrycznych i budynek transformatorów byłej KWK Saturn zostaną przekształcone na potrzeby Centrum Usług Społecznościowych i Aktywności Lokalnej (warsztaty twórczości artystycznej, edukacyjnej i aktywności fizycznej, pomieszczenia biurowe wraz z zapleczem). Przewidziano wszelkie niezbędne roboty remontowo-budowlane przyczyniające się do uzyskania w obiektach nowych funkcji. Budynki będą połączone ze sobą szklanym łącznikiem, pełniącym funkcję komunikacyjną między obiektami oraz funkcjonalną. (Polish)
    0 references

    Identifiers

    RPSL.10.02.01-24-01F3/17
    0 references