(Created claim: summary (P836): The project involves rehabilitation of railway lines 694, 157, 190 and 191 on the following sections: — line No. 694 Bronów – Bieniowiec section from km 0.000 to km 3.217, – line no. 157 section Bieniowiec – Skoczów from km 12.650 to km 23.721, – line No. 190 of Skoczów – Goleszów – Cieszyn from km 21.506 to km 39.122 – line no 191 Goleszów – Wisła Głębce from km -0.550 to km 19.543. with a total length of 51.997 km. After the project, the techn...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 10:13, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
324,744,500.0 zloty
0 references
432,024,461.69 zloty
0 references
75.17 percent
0 references
29 September 2016
0 references
31 December 2021
0 references
PKP POLSKIE LINIE KOLEJOWE SPÓŁKA AKCYJNA
0 references
Projekt obejmuje rehabilitację linii kolejowych nr 694, 157, 190 i 191 na poniższych odcinkach: - linia nr 694 odcinek Bronów - Bieniowiec od km 0,000 do km 3,217, - linia nr 157 odcinek Bieniowiec - Skoczów od km 12,650 do km 23,721, - linia nr 190 odcinek Skoczów - Goleszów - Cieszyn od km 21,506 do km 39,122 - linia nr 191 Goleszów - Wisła Głębce od km -0,550 do km 19,543. o łącznej długości 51,997 km. Po realizacji projektu parametry techniczne linii będą spełniały wymagania określone w Rozporządzeniu KE nr 1299/2014 z 18.11.2014 r. dotyczące technicznych specyfikacji interoperacyjności podsystemu „Infrastruktura” systemu kolei w UE, w następującym zakresie: - max. prędkość (pociągi pasażerskie): na liniach nr 694,190 - 120 km/h; na linii nr 157 – 110 km/h; na linii nr 191 – 80 km/h, - max. prędkość (pociągi towarowe): na liniach nr 694, 157 i 190 – 80 km/h; na linii nr 191 – 60 km/h. - dopuszczalny nacisk na oś: 221 kN (Polish)
0 references
The project involves rehabilitation of railway lines 694, 157, 190 and 191 on the following sections: — line No. 694 Bronów – Bieniowiec section from km 0.000 to km 3.217, – line no. 157 section Bieniowiec – Skoczów from km 12.650 to km 23.721, – line No. 190 of Skoczów – Goleszów – Cieszyn from km 21.506 to km 39.122 – line no 191 Goleszów – Wisła Głębce from km -0.550 to km 19.543. with a total length of 51.997 km. After the project, the technical parameters of the line will meet the requirements set out in EC Regulation No 1299/2014 of 18.11.2014 concerning technical specifications for interoperability of the infrastructure subsystem of the EU rail system, to the following extent: — max. speed (passenger trains): on lines No 694.190-120 km/h; on line No 157-110 km/h; on line No 191-80 km/h, – max. speed (traffic trains): on lines 694, 157 and 190-80 km/h; on line No 191-60 km/h. – permissible axle load: 221 kN (English)