Pedestrian and cycling routes with associated infrastructure (Q112942): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project involves the construction of 9 tourist sites and recreational ruff paths around the Dobczycki reservoir in the municipality of Myślenice. The lengths of the defined paths shall be 16.88 km. The 90 pathways are defined by the existing routes and routes. The paths are reached at an average of 2,53.0 m. the paths are located in the immediate vicinity of a government. Ry and ZB. Dobczycki and is a continuation of the existing path for...) |
||
Property / summary | |||
Property / summary: The project involves the construction of 9 tourist sites and recreational ruff paths around the Dobczycki reservoir in the municipality of Myślenice. The lengths of the defined paths shall be 16.88 km. The 90 pathways are defined by the existing routes and routes. The paths are reached at an average of 2,53.0 m. the paths are located in the immediate vicinity of a government. Ry and ZB. Dobczycki and is a continuation of the existing path for a circular path in the city of Zamrabie. All project paths are connected to a single loop along the tracks planned to be carried out in neighbouring municipalities immediately adjacent to the tank. Sections on the right bank edge. To move towards a reservoir, the running running path begins with the urban park and the recreation centre and the Recreation Centre, with a car park on 300 passenger cars, located 300 metres from the bypass. Right ends of the river and comes to the rest of the world. Dobczycki, then leads to route No 15, 16, 17 where it connects with a point view point covered by the separate project route 18. Next, the route is carried out in the direction of sites. Dobczyce and Sieci. It is part of Myślenice, along with the town of Myślenice. To be filled in by Rms and by the places. Bortooth comes to the city and left the left. Raza concealed the loop around the container and returned to the District of Zaporoba route No 11 B, 12, 13, 14, ZO2. In addition, the project includes the construction of a bitumen pathway to the Cros which will start at the Sport and Recreation Centre, and in the vicinity of the sterile cavity, the loop will be returned to the area of the Z01 car park. There are two courses of water on which the construction of a footbridge is planned. In addition, on route No 14, the construction of the steel footbridge is planned for the San and the construction of the other information in part Q of the application on the route No 15. (English) / rank | |||
Revision as of 14:33, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Pedestrian and cycling routes with associated infrastructure |
Project in Poland financed by DG Regio |
Statements
5,399,999.96 zloty
0 references
7,999,999.95 zloty
0 references
67.5 percent
0 references
1 September 2017
0 references
31 January 2021
0 references
GMINA MYŚLENICE
0 references
Projekt obejmuje budowę 9 obiektów turystycznych i rekreacyjnych ścieżek pieszorowerowych wokół Zbiornika Dobczyckiego, na terenie Gminy Myślenice. Długość wyznaczonych ścieżek wynosi 16,88 km. 90 ścieżek wytyczonych jest po istniejących traktach i drogach polnych. Szerokość ścieżek wynosi średnio 2,53,0 m. Ścieżki usytuowane są w bezpośrednim sąsiedztwie rz. Raby i Zb. Dobczyckiego i są kontynuacją istniejącej ścieżki rowerowobiegowej w dz. rekreacyjnej miasta Zarabie. Wszystkie ścieżki realizowane w ramach projektu łączą się w jedną pętlę ze ścieżkami planowanymi do realizacji w sąsiednich gminach położonych bezpośrednio przy zbiorniku. Odcinki położone na prawym brzegu rz. Raby biegnące w kierunku zbiornika są kontynuacją istniejącej ścieżki rowerowo biegowej, która rozpoczyna przy parku miejskim i obiektach Centrum Sportu i Rekreacji, z parkingiem na 300 samochodów osobowych, znajdującego się 300 metrów od zjazdu z Zakopianki. Dalej ścieżka biegnie prawym brzegiem rzeki i dochodzi do Zb. Dobczyckiego, następnie jego wałami prowadzi do miejscowości Droginia trasy nr 15, 16, 17 gdzie łączy się z punktem widokowym objętym osobnym projektem trasa nr 18. Dalej ścieżka prowadzi po drodze powiatowej w kierunku miejsc. Dobczyce i Siepraw. Z Sieprawia wchodzi z powrotem na teren gminy Myślenice wzdłuż rz. Raby i przez miejsc. Borzęta dochodzi do miasta, po czym lewym brzegiem rz. Raba zatacza pętlę wokół zbiornika i wraca do dzielnicy Zarabie trasy nr 11 B, 12, 13, 14, ZO2. Dodatkowo projekt obejmuje budowę asfaltowej ścieżki dla rolkarzy, która rozpoczynać się będzie przy Centrum Sportu i Rekreacji, a w okolicach Dolnego Jazu zatoczy pętlę i wróci na teren parkingu Z01. Na drodze projektowanej ścieżki występują dwa cieki wodne, na których planowana jest budowa kładek. Ponadto na trasie nr 14 zaplanowano budowę kładki stalowej na potoku San, a na trasie nr 15 budowę kładki stalowej nad ciekiem wodnym pozostałe informacje w części Q wniosku. (Polish)
0 references
Identifiers
RPMP.06.03.03-12-0282/17
0 references