Q112927 (Q112927): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Spa House consists of 2 parts: the building’s deep. (special) with deep rooms for patients and from a lower natural-medical building, where treatment rooms and swimming pool are located. The project consists of the renovation and reconstruction of the natural and therapeutic plant, which is stage II of the investment. As part of the project, the extension of the treatment part towards the east was designed, where in addition to “wet” treatments...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 14:33, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
2,054,267.86 zloty
0 references
4,565,039.71 zloty
0 references
45.0 percent
0 references
1 February 2017
0 references
31 December 2019
0 references
„CECHINI ŻEGIESTÓW-ZDRÓJ GŁÓWNY” SP. Z O.O.
0 references
Dom Zdrojowy składa się z 2 części: budynku gł. (zabytkowego) mieszczącego gł. pokoje dla kuracjuszy i z niższego budynku przyrodo–leczniczego, w którym mieszczą się pokoje zabiegowe i basen. Projekt polega na remoncie i przebudowie zakładu przyrodo-leczniczego, który stanowi etap II inwestycji. W ramach projektu zaprojektowano rozbudowę części zabiegowej w stronę wsch. gdzie oprócz gabinetów zabiegów „mokrych” (np. balneoterapia, kąpiele mineralne) i „suchych”(masaże, elektroterapia) znajdować się będzie basen rehabilitacyjny (budynek ma 2 kondygnacje). Część zabiegowa zostanie wyposażona w nowoczesne urządzenia lecznictwa uzdrowiskowego zgodnie z profilem uzdrowiska (reumatologia, gastrologia, urologia). Po wykonaniu prac planuje się zabiegi m.in. z: balneoterapii, peloidoterapii, hydroterapii, kinezyterapii, termoterapii, fizykoterapii i masaże klasyczne.Obydwie części obiektu połączone będą łącznikiem na poziomie parteru i spocznika między parterem a pierwszą kondygnacją budynku gł. Pawilon posiada dostęp komunikacyjny od strony stoku poprzez kładki na drugie i trzecie piętro i bezpośrednio z poziomu terenu na pierwsze piętro. Planuje się zamontować w budynku proste okna nawiązujące do modernistycznych elewacji budynku gł. Bryła hali basenowej jest również prosta z dużymi prostokątnymi przeszkleniami. W stropodachu zaprojektowane zostały dwa świetliki doświetlające wnętrze hali. Nowo projektowane elementy konstrukcyjne obiektu (ściany, słupy, stropy)–żelbetowe, projektowane ściany nośne-z pustaków Porotherm ocieplone styropianem. Interesującym rozwiązaniem jest tzw. zielony dach-stropodach odwrócony zielony z roślinnością niską. W części zabiegowej na parterze przewiduje się możliwość jednoczesnego przebywania do 30 osób, a na piętrze do 52 osób. Przedstawione założenia zgodne są z projektem budowlanym. Przewidziano prace przy rozbudowie i przebudowie budynku, zakup wyposażenia do poszczególnych pomieszczeń i nadzór przyrodniczy oraz promocję. (Polish)
0 references
Spa House consists of 2 parts: the building’s deep. (special) with deep rooms for patients and from a lower natural-medical building, where treatment rooms and swimming pool are located. The project consists of the renovation and reconstruction of the natural and therapeutic plant, which is stage II of the investment. As part of the project, the extension of the treatment part towards the east was designed, where in addition to “wet” treatments (e.g. balneotherapy, mineral baths) and “dry” (massages, electrotherapy) there will be a rehabilitation pool (the building has 2 floors). The treatment part will be equipped with modern spa treatment facilities according to the spa profile (rheumatology, gastrology, urology). After completion of the works, treatments are planned, among others: balneotherapy, peloid therapy, hydrotherapy, cinema therapy, thermotherapy, physical therapy and classical massages.Both parts of the facility will be connected by a link at the ground floor level and the rest between the ground floor and the first floor of the building. The pavilion has communication access from the slopes through footbridges to the second and third floors and directly from the ground level to the first floor. It is planned to install simple windows referring to the modernist facade of the building. The shape of the pool hall is also simple with large rectangular glazings. Two fireflies have been designed to illuminate the interior of the hall. Newly designed structural elements of the object (walls, columns, ceilings) – gel, designed supporting walls-from the blocks of Porotherm with styrofoam insulated. An interesting solution is the so-called green roof-stropod inverted green with low vegetation. In the treatment area on the ground floor it is possible to stay at the same time up to 30 people and on the floor up to 52 people. These assumptions are consistent with the construction project. Works are planned for the extension and reconstruction of the building, purchase of equipment for individual rooms and natural supervision and promotion. (English)
20 October 2020
0 references
Identifiers
RPMP.06.03.02-12-0526/16
0 references