Refurbishment of pijni Anna together with construction of an infrastructure accompanied by Żegiestane-Zdrój (Q112873): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): In order to restore Żegestre’s health spa, it is necessary to renovate several sites including, inter alia, Pijni Anna is closed due to the poor technical condition of the building. The beer is located on a part of the spa resort on parcel 5805. The plant was constructed in 1945, consisting of a portion of the pijni containing the mineral water covered by a wooden multi-estate centre, and a good leisure part serving for the space and the consu...) |
(Created claim: summary (P836): In order to restore the splendor of Żegiestów spa, it is necessary to renovate several facilities, including among others. Anna’s drunkard who’s closed because of the poor technical condition of the building. The drinking house is located in the half of the spa on plot 5805. The building was built in 1945, consisting of a part of a drinking room with mineral water intake covered by a multi-fall wooden roof and an additional recreational part for...) |
||||||||||||||
Property / summary | |||||||||||||||
In order to restore the splendor of Żegiestów spa, it is necessary to renovate several facilities, including among others. Anna’s drunkard who’s closed because of the poor technical condition of the building. The drinking house is located in the half of the spa on plot 5805. The building was built in 1945, consisting of a part of a drinking room with mineral water intake covered by a multi-fall wooden roof and an additional recreational part for walking and consuming mineral water. Hence, the drinking room is an L-shaped building. 32mx12 m and 12mx16m. Parameters: surface area: 666 m², usable: 532 m² cubicle: 1.550 m2The project will cover:1. Overhaul of the roof: replacement of the roof covering from eternite to tile sheet, damaged sheet metal treatments from sheet metal, damaged drain pipes and roof gutters, damaged roof patching, destroyed roof structure elements, rafters, purlins, columns, murlats, linings, roof linings in the amount of about 35.2. Renovation of the stone facade: replacement and replacement of destroyed stone facade elements, plinths and resistance walls, window and door carpentry with the same holes, destroyed steel balustrades, replenishments and plasters on the facade, supplement and replacement of damaged terrace floors.3. Internal refurbishment: completion and execution of new plasters and wall painting, replacement and replenishment of walls made of stone and stone source housing, destroyed water installations, C.O and electrical installations, replacement of damaged stairway balustrades.The scope of work in the project is in accordance with the requirements which the spa drunks put to use. to the Decree of the Minister of Health from 28.07.2005 Source http:www2.mz.gov.plwwwfilesmastrukturadocszalprojrozp23112005.pdf, according to which the halls should be adapted for operation of the year-round and equipped. There’s a promotion planned. (English) | |||||||||||||||
Property / summary: In order to restore the splendor of Żegiestów spa, it is necessary to renovate several facilities, including among others. Anna’s drunkard who’s closed because of the poor technical condition of the building. The drinking house is located in the half of the spa on plot 5805. The building was built in 1945, consisting of a part of a drinking room with mineral water intake covered by a multi-fall wooden roof and an additional recreational part for walking and consuming mineral water. Hence, the drinking room is an L-shaped building. 32mx12 m and 12mx16m. Parameters: surface area: 666 m², usable: 532 m² cubicle: 1.550 m2The project will cover:1. Overhaul of the roof: replacement of the roof covering from eternite to tile sheet, damaged sheet metal treatments from sheet metal, damaged drain pipes and roof gutters, damaged roof patching, destroyed roof structure elements, rafters, purlins, columns, murlats, linings, roof linings in the amount of about 35.2. Renovation of the stone facade: replacement and replacement of destroyed stone facade elements, plinths and resistance walls, window and door carpentry with the same holes, destroyed steel balustrades, replenishments and plasters on the facade, supplement and replacement of damaged terrace floors.3. Internal refurbishment: completion and execution of new plasters and wall painting, replacement and replenishment of walls made of stone and stone source housing, destroyed water installations, C.O and electrical installations, replacement of damaged stairway balustrades.The scope of work in the project is in accordance with the requirements which the spa drunks put to use. to the Decree of the Minister of Health from 28.07.2005 Source http:www2.mz.gov.plwwwfilesmastrukturadocszalprojrozp23112005.pdf, according to which the halls should be adapted for operation of the year-round and equipped. There’s a promotion planned. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: In order to restore the splendor of Żegiestów spa, it is necessary to renovate several facilities, including among others. Anna’s drunkard who’s closed because of the poor technical condition of the building. The drinking house is located in the half of the spa on plot 5805. The building was built in 1945, consisting of a part of a drinking room with mineral water intake covered by a multi-fall wooden roof and an additional recreational part for walking and consuming mineral water. Hence, the drinking room is an L-shaped building. 32mx12 m and 12mx16m. Parameters: surface area: 666 m², usable: 532 m² cubicle: 1.550 m2The project will cover:1. Overhaul of the roof: replacement of the roof covering from eternite to tile sheet, damaged sheet metal treatments from sheet metal, damaged drain pipes and roof gutters, damaged roof patching, destroyed roof structure elements, rafters, purlins, columns, murlats, linings, roof linings in the amount of about 35.2. Renovation of the stone facade: replacement and replacement of destroyed stone facade elements, plinths and resistance walls, window and door carpentry with the same holes, destroyed steel balustrades, replenishments and plasters on the facade, supplement and replacement of damaged terrace floors.3. Internal refurbishment: completion and execution of new plasters and wall painting, replacement and replenishment of walls made of stone and stone source housing, destroyed water installations, C.O and electrical installations, replacement of damaged stairway balustrades.The scope of work in the project is in accordance with the requirements which the spa drunks put to use. to the Decree of the Minister of Health from 28.07.2005 Source http:www2.mz.gov.plwwwfilesmastrukturadocszalprojrozp23112005.pdf, according to which the halls should be adapted for operation of the year-round and equipped. There’s a promotion planned. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 14:28, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Refurbishment of pijni Anna together with construction of an infrastructure accompanied by Żegiestane-Zdrój |
Project in Poland financed by DG Regio |
Statements
768,688.34 zloty
0 references
1,708,196.33 zloty
0 references
45.0 percent
0 references
1 November 2016
0 references
30 June 2020
0 references
„CECHINI ŻEGIESTÓW-ZDRÓJ GŁÓWNY” SP. Z O.O.
0 references
Aby przywrócić świetność uzdrowisku Żegiestów, konieczne jest wyremontowanie kilku obiektów w tym m.in. Pijalni Anna która jest zamknięta z uwagi na zły stan techniczny budynku. Pijalnia zlokalizowana jest na półn. części uzdrowiska na działce 5805. Obiekt wybudowano w 1945, składa się z części pijalni z ujęciem wody mineralnej przykrytym dachem drewnianym wielospadowym oraz dobudowaną częścią rekreacyjna służąca do spacerów i konsumpcji wody mineralnej. Stąd pijalnia jest budynkiem w kształcie litery L o wym. 32mx12m i 12mx16m. Parametry: powierzchnia zabudowy:666 m2, użytkowa: 532 m2 kubatura: 1.550 m2Projekt obejmie:1. Remont dachu: wymiana pokrycia dachowego z eternitu na blachę dachówkową, zniszczonych obróbek blacharskich z blachy powlekanej, zniszczonych rur spustowych i rynien dachowych, zniszczonego łacenia dachu, zniszczonych elementów konstrukcji dachu, krokwie, płatwie, słupy, murlaty, obicia, podbitki dachu w ilości około 35.2. Remont elewacji kamiennej:wymiana i uzupełnienie zniszczonych elementów kamiennych elewacji, cokołów i murów oporowych, stolarki okiennej i drzwiowej w te same otwory, zniszczonych balustrad stalowych, uzupełnienie ubytków i tynków na elewacji, uzupełnienie i wymiana zniszczonych posadzek tarasowych.3. Remont wewn.: uzupełnienia i wykonanie nowych tynków i malowanie ścian, wymiana i uzupełnienie ścian z kamienia i kamiennej obudowy źródła, zniszczonych instalacji wodkan, C.O i instalacji elektrycznej, wymiana zniszczonych balustrad schodowych.Zakres prac w projekcie jest zgodny z wymogami jakie stawia pijalniom uzdrowiskowym zał. do Rozporządzenia Ministra Zdrowia z 28.07.2005 Źródło http:www2.mz.gov.plwwwfilesmastrukturadocszalprojrozp23112005.pdf, zgodnie z którym pijalnie powinny być dostosowane do eksploatacji całorocznej i wyposażone m.in. w instalacje do wydawania i podgrzewania wody, halę spacerową, tablice objaśniające zasady korzystania z urządzeń i charakteryzujące wody. Przewidziano promocję. (Polish)
0 references
In order to restore the splendor of Żegiestów spa, it is necessary to renovate several facilities, including among others. Anna’s drunkard who’s closed because of the poor technical condition of the building. The drinking house is located in the half of the spa on plot 5805. The building was built in 1945, consisting of a part of a drinking room with mineral water intake covered by a multi-fall wooden roof and an additional recreational part for walking and consuming mineral water. Hence, the drinking room is an L-shaped building. 32mx12 m and 12mx16m. Parameters: surface area: 666 m², usable: 532 m² cubicle: 1.550 m2The project will cover:1. Overhaul of the roof: replacement of the roof covering from eternite to tile sheet, damaged sheet metal treatments from sheet metal, damaged drain pipes and roof gutters, damaged roof patching, destroyed roof structure elements, rafters, purlins, columns, murlats, linings, roof linings in the amount of about 35.2. Renovation of the stone facade: replacement and replacement of destroyed stone facade elements, plinths and resistance walls, window and door carpentry with the same holes, destroyed steel balustrades, replenishments and plasters on the facade, supplement and replacement of damaged terrace floors.3. Internal refurbishment: completion and execution of new plasters and wall painting, replacement and replenishment of walls made of stone and stone source housing, destroyed water installations, C.O and electrical installations, replacement of damaged stairway balustrades.The scope of work in the project is in accordance with the requirements which the spa drunks put to use. to the Decree of the Minister of Health from 28.07.2005 Source http:www2.mz.gov.plwwwfilesmastrukturadocszalprojrozp23112005.pdf, according to which the halls should be adapted for operation of the year-round and equipped. There’s a promotion planned. (English)
20 October 2020
0 references
Identifiers
RPMP.06.03.01-12-0434/16
0 references