Extension of the provincial road 969 by construction of a roundabout with the construction of a local access road to the Economic Activity Zone in Stary str. (Q113020): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the investment is the extension of the provincial road 969 by the construction of a roundabout with the construction of a municipal road. Planned section of the municipal road of approximately the length of 417,0 is intended to be a combination of a provincial road 969 with the Zone for Economic Activity in Stary Sączu. The project will run from 1 June 2018 until 30 June 2020. the investment phase will only be implemented in 201...)
(‎Created claim: summary (P836): The subject of the investment is the extension of the provincial road 969 consisting of the construction of a roundabout together with the construction of a communal road. Projected section of the communal road with a length of approx. 417.0 is intended to be a link between Voivodeship Road 969 and Economic Activity Zone in Stary Sącz. The project will be implemented from 1 June 2018 to 30 June 2020.The investment phase will be implemented only...)
Property / summary
 
The subject of the investment is the extension of the provincial road 969 consisting of the construction of a roundabout together with the construction of a communal road. Projected section of the communal road with a length of approx. 417.0 is intended to be a link between Voivodeship Road 969 and Economic Activity Zone in Stary Sącz. The project will be implemented from 1 June 2018 to 30 June 2020.The investment phase will be implemented only in 2019 because the Municipality will earlier carry out activities under the ZRID procedure. The implementation of the investment will include 5 tasks:Task 1: Building documentationTask 2: Construction of the roundabout 1: Construction of the roundabout within the provincial road 2: Construction of a rainwater drainage system 3: Construction of the cycle path 4: Construction of pavement 5: Extension of collective roadways of Dr. collective dr. KR2 6: Construction of a ditch surface drainage system, culverts 7: Construction of roundabout lighting and pedestrian crossings Task 3: Construction of the municipal road 1: Construction of an access road to the zone of economic activity 2: Construction of the rainwater drainage system 3: Construction of the cycle path 4: Construction of pavement 5: Construction of municipal road lighting Task 4: Investor supervision Task 5: Indirect costs project management The details of the work and technology used are defined in the Functional and Design Programme.The budgeted amounts of expenditure on individual tasks were estimated on the basis of the technological requirements presented and the scope of the required work included in the above documents. The proposed structure of the road pavement, cycle path and pavement should be verified at the construction phase and after the ground floor tests have been developed. A detailed calculation of the construction costs is included in the appendix to the proposal, the calculation of the costs of the roundabout road. (English)
Property / summary: The subject of the investment is the extension of the provincial road 969 consisting of the construction of a roundabout together with the construction of a communal road. Projected section of the communal road with a length of approx. 417.0 is intended to be a link between Voivodeship Road 969 and Economic Activity Zone in Stary Sącz. The project will be implemented from 1 June 2018 to 30 June 2020.The investment phase will be implemented only in 2019 because the Municipality will earlier carry out activities under the ZRID procedure. The implementation of the investment will include 5 tasks:Task 1: Building documentationTask 2: Construction of the roundabout 1: Construction of the roundabout within the provincial road 2: Construction of a rainwater drainage system 3: Construction of the cycle path 4: Construction of pavement 5: Extension of collective roadways of Dr. collective dr. KR2 6: Construction of a ditch surface drainage system, culverts 7: Construction of roundabout lighting and pedestrian crossings Task 3: Construction of the municipal road 1: Construction of an access road to the zone of economic activity 2: Construction of the rainwater drainage system 3: Construction of the cycle path 4: Construction of pavement 5: Construction of municipal road lighting Task 4: Investor supervision Task 5: Indirect costs project management The details of the work and technology used are defined in the Functional and Design Programme.The budgeted amounts of expenditure on individual tasks were estimated on the basis of the technological requirements presented and the scope of the required work included in the above documents. The proposed structure of the road pavement, cycle path and pavement should be verified at the construction phase and after the ground floor tests have been developed. A detailed calculation of the construction costs is included in the appendix to the proposal, the calculation of the costs of the roundabout road. (English) / rank
 
Normal rank
Property / summary: The subject of the investment is the extension of the provincial road 969 consisting of the construction of a roundabout together with the construction of a communal road. Projected section of the communal road with a length of approx. 417.0 is intended to be a link between Voivodeship Road 969 and Economic Activity Zone in Stary Sącz. The project will be implemented from 1 June 2018 to 30 June 2020.The investment phase will be implemented only in 2019 because the Municipality will earlier carry out activities under the ZRID procedure. The implementation of the investment will include 5 tasks:Task 1: Building documentationTask 2: Construction of the roundabout 1: Construction of the roundabout within the provincial road 2: Construction of a rainwater drainage system 3: Construction of the cycle path 4: Construction of pavement 5: Extension of collective roadways of Dr. collective dr. KR2 6: Construction of a ditch surface drainage system, culverts 7: Construction of roundabout lighting and pedestrian crossings Task 3: Construction of the municipal road 1: Construction of an access road to the zone of economic activity 2: Construction of the rainwater drainage system 3: Construction of the cycle path 4: Construction of pavement 5: Construction of municipal road lighting Task 4: Investor supervision Task 5: Indirect costs project management The details of the work and technology used are defined in the Functional and Design Programme.The budgeted amounts of expenditure on individual tasks were estimated on the basis of the technological requirements presented and the scope of the required work included in the above documents. The proposed structure of the road pavement, cycle path and pavement should be verified at the construction phase and after the ground floor tests have been developed. A detailed calculation of the construction costs is included in the appendix to the proposal, the calculation of the costs of the roundabout road. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:59, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension of the provincial road 969 by construction of a roundabout with the construction of a local access road to the Economic Activity Zone in Stary str.
Project in Poland financed by DG Regio

    Statements

    0 references
    4,966,556.38 zloty
    0 references
    1,191,973.53 Euro
    13 January 2020
    0 references
    6,622,075.18 zloty
    0 references
    1,589,298.04 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    1 June 2018
    0 references
    31 December 2020
    0 references
    GMINA STARY SĄCZ
    0 references
    Przedmiotem inwestycji jest rozbudowa drogi wojewódzkiej 969 polegająca na budowie ronda wraz z budową drogi gminnej. Projektowany odcinek drogi gminnej o długości ok. 417,0 ma do celowo stanowić połączenie drogi wojewódzkiej 969 ze Strefą Aktywności Gospodarczej w Starym Sączu. Projekt będzie realizowany od 1 czerwca 2018 do 30 czerwca 2020.Faza inwestycyjna będzie realizowana dopiero w roku 2019 ponieważ wcześniej Gmina będzie przeprowadzała działania w ramach procedury ZRID. Realizacja inwestycji będzie obejmowała 5 zadań:Zadanie 1: Dokumentacja budowlanaZadanie 2: Budowa ronda 1: Budowa ronda w ciągu drogi wojewódzkiej 2: Budowa systemu odwodnienia rondakanalizacja deszczowa 3: Budowa ścieżki rowerowej 4: Budowa chodnika 5: Rozbudowa dróg zbiorczych jezdnia dr. zbiorcza KR2 6: Budowa sytemu odwodnienia powierzchniowego rowy, przepusty 7: Budowa oświetlenia ronda oraz przejść dla pieszych Zadanie 3: Budowa drogi gminnej 1: Budowa drogi dojazdowej do strefy aktywności gospodarczej 2: Budowa systemu odwodnienia kanalizacja deszczowa 3: Budowa ścieżki rowerowej 4: Budowa chodnika 5: Budowa oświetlenia drogi gminnejZadanie 4: Nadzór inwestorskiZadanie 5: Koszty pośrednie zarządzenie projektem Szczegóły prac i zastosowanej technologii został określony w Programie funkcjonalnoużytkowym oraz Projekcie koncepcyjnym.Ujęte w budżecie kwoty wydatków na realizację poszczególnych zadań zostały oszacowane w oparciu o przedstawione wymogi technologiczne i zakres wymaganych prac ujęte ww. dokumentach. Proponowane konstrukcję nawierzchni jezdni, ścieżki rowerowej, chodników należy zweryfikować na etapie opracowywania projektu budowlanego oraz po opracowaniu badań podłoża gruntowego. Szczegółowa kalkulacja kosztów budowalanych umieszczona jest w załączniku do wniosku pn. kalkulacja kosztów rondo droga. (Polish)
    0 references
    The subject of the investment is the extension of the provincial road 969 consisting of the construction of a roundabout together with the construction of a communal road. Projected section of the communal road with a length of approx. 417.0 is intended to be a link between Voivodeship Road 969 and Economic Activity Zone in Stary Sącz. The project will be implemented from 1 June 2018 to 30 June 2020.The investment phase will be implemented only in 2019 because the Municipality will earlier carry out activities under the ZRID procedure. The implementation of the investment will include 5 tasks:Task 1: Building documentationTask 2: Construction of the roundabout 1: Construction of the roundabout within the provincial road 2: Construction of a rainwater drainage system 3: Construction of the cycle path 4: Construction of pavement 5: Extension of collective roadways of Dr. collective dr. KR2 6: Construction of a ditch surface drainage system, culverts 7: Construction of roundabout lighting and pedestrian crossings Task 3: Construction of the municipal road 1: Construction of an access road to the zone of economic activity 2: Construction of the rainwater drainage system 3: Construction of the cycle path 4: Construction of pavement 5: Construction of municipal road lighting Task 4: Investor supervision Task 5: Indirect costs project management The details of the work and technology used are defined in the Functional and Design Programme.The budgeted amounts of expenditure on individual tasks were estimated on the basis of the technological requirements presented and the scope of the required work included in the above documents. The proposed structure of the road pavement, cycle path and pavement should be verified at the construction phase and after the ground floor tests have been developed. A detailed calculation of the construction costs is included in the appendix to the proposal, the calculation of the costs of the roundabout road. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.07.01.03-12-1096/17
    0 references