Replacement of heating factor within local heat sources with thermal modernisation of buildings in the Płońsk commune_2 (Q109139): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Replacement of heating factor within local heat sources with thermal modernisation of buildings in the Płońsk commune_2 |
Revision as of 09:29, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Replacement of heating factor within local heat sources with thermal modernisation of buildings in the Płońsk commune_2 |
Project in Poland financed by DG Regio |
Statements
1,380,294.04 zloty
0 references
1,725,367.55 zloty
0 references
80.0 percent
0 references
29 December 2016
0 references
31 December 2021
0 references
GMINA PŁOŃSK
0 references
Projekt realizowany będzie w gminie wiejskiej Płońsk, w pow. płońskim. Dla Gminnego Budynku Użyteczności Publicznej w Płońsku nastąpi wymiana istniejącego źródła ciepła (kocioł gazowy z roku 2009 o mocy grzewczej 42kW i niskiej sprawności wytwarzania ciepła 0,86) na odnawialne źródło energii (OZE) - powietrzną pompę ciepła o mocy grzewczej 29,3kW i o wysokiej sprawności wytwarzania ciepła 4,1. Pracę pompy ciepła będzie wspomagał projektowany kocioł gazowy o mocy grzewczej 42kW i sprawności wytwarzania ciepła 0,93.Przez większą część sezonu grzewczego podstawowym i ekonomicznym źródłem ciepła dla dwóch budynków będzie powietrzna pompa ciepła. W szczytowym okresie zapotrzebowania na ciepło bądź w sytuacji awarii podstawowego źródła ciepła, rolę wspomagającą będzie pełnił projektowany kocioł gazowy.Całkowita sprawność wytwarzania źródła ciepła wynosi 3,6. Instalacja centralnego ogrzewania ma za zadanie doprowadzenie do poszczególnych pomieszczeń ciepła w gminnym budynku użyteczności publicznej, pokrywającego straty ciepła przez przegrody budowlane oraz zasilenie w ciepło sąsiadującego budynku garażowego z częściową zmianą sposobu użytkowania na pomieszczenia higieniczno-sanitarne z szatnia podstawową.Ponieważ zarówno w jednym jak i w drugim budynku nastąpi wymiana urządzeń grzewczych (wymiana kotła gazowego oraz wymiana kotła węglowego (koza), w związku z tym zaprojektowano przeprowadzenie prac termo modernizacyjnych. W wyniku wymiany czynnika grzewczego w gminnym budynku użyteczności publicznej z kotła gazowego na czynnik grzewczy zasilany z OZE (powietrzna pompa ciepła) uzyskano zmniejszenie emisji CO2 o 82,00 % oraz pyłów o 97,00 %.W wyniku wymiany czynnika grzewczego w budynku garażowym z częściową zmianą sposobu użytkowania na pomieszczenia higieniczno-sanitarne z szatnia podstawową z kotła węglowego (koza) na czynnik grzewczy zasilany z OZE (powietrzna pompa ciepła) uzyskano zmniejszenie emisji CO2 o 88,00% oraz pyłów o 100 %. (Polish)
0 references
The project will be implemented in the rural commune of Płońsk, in the Płońsk district. For the Municipal Public Use Building in Płońsk there will be a replacement of the existing heat source (gas boiler from 2009 with a heating capacity of 42 kW and low efficiency of heat generation 0.86) for renewable energy source (RES) – an air heat pump with a heating capacity of 29.3 kW and high efficiency of heat generation 4.1. The heat pump will be supported by a designed gas boiler with a heating capacity of 42 kW and a heat efficiency of 0.93.For most of the heating season, the primary and economical heat source for two buildings will be an air heat pump. During the peak period of heat demand or in the event of a failure of the basic heat source, the designed gas boiler will play a supporting role.The total efficiency of the production of the heat source is 3.6. The central heating system is designed to bring heat to individual rooms in the municipal utility building, covering heat losses by the building divisions and supplying the adjacent garage building with a partial change of use into the hygiene and sanitary rooms from the basic locker room.Because both in one and the other building there will be replacement of heating equipment (exchange of the gas boiler and replacement of coal boiler (goat), therefore modernising the thermal works. As a result of the replacement of the heating agent in the municipal utility building from the gas boiler to the heating agent powered from RES (air heat pump), the CO2 emissions were reduced by 82.00 % and dusts by 97.00 %.As a result of the replacement of the heating agent in the garage building with a partial change in use to the hygiene and sanitary rooms, the basic cloakroom from the coal boiler (goat) achieved a reduction of 100 % CO-fuel powered by the heating medium (RES). (English)
20 October 2020
0 references
Identifiers
RPMA.04.03.01-14-B396/18
0 references