Renovation and renovation of the service building (Q105052): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main objective of the project is to increase the energy efficiency of the service building of Hubert Unparcels, and to protect and improve the state of the environment through deep thermo-modernisation with the use of renewable energy sources. The tasks planned for the project are: — Exchange of lighting; — Redeployment of the heat source for hot water. — Performance of the mechanical ventilation system with heat recovery; — warming of the...)
(‎Created claim: summary (P836): The main objective of the project is to increase the energy efficiency of the service building of the Service Company Hubert Niedziałek and to protect and improve the environment by means of a deep thermo-modernisation with the use of renewable energy sources. The tasks planned in the project are: — Replacement of lighting; — Reconstruction of heat source for central heating; — Manufacturing of a mechanical ventilation system with heat recovery;...)
Property / summary
 
The main objective of the project is to increase the energy efficiency of the service building of the Service Company Hubert Niedziałek and to protect and improve the environment by means of a deep thermo-modernisation with the use of renewable energy sources. The tasks planned in the project are: — Replacement of lighting; — Reconstruction of heat source for central heating; — Manufacturing of a mechanical ventilation system with heat recovery; — Terrace warming; — Warming of the outer walls; — Warming of the ceiling; — Window replacement; — Warming of the roof slant; — Replacement of doors; — Floor warming in the basement; — Energy management system; — Modernisation of central heating installations (including heat pump and fittings); — Installation of 10 kW photovoltaic installation. The results of the project expressed by indicators are: The amount of thermal energy saved 552, 20 GJ/year; The amount of electricity saved 23,4 MWh/year; Production of heat from newly built/new RES installations 4,783 MWht/year; Production of electricity from newly built/new generation capacity installations using RES 10 MWhe/year; An estimated annual decrease in greenhouse gas emissions of 58.09 tonnes of CO2 equivalent/year; Reduction of final energy consumption as a result of projects 636.1 GJ/year; Production of electricity from newly built installations using RES 10 MWhe/year; Production of heat from newly built installations using RES 4,783 MWht/year. The target group of the project is the service company Hubert Niedziałek, as well as indirectly thanks to the improvement of the air quality of the surrounding residents. (English)
Property / summary: The main objective of the project is to increase the energy efficiency of the service building of the Service Company Hubert Niedziałek and to protect and improve the environment by means of a deep thermo-modernisation with the use of renewable energy sources. The tasks planned in the project are: — Replacement of lighting; — Reconstruction of heat source for central heating; — Manufacturing of a mechanical ventilation system with heat recovery; — Terrace warming; — Warming of the outer walls; — Warming of the ceiling; — Window replacement; — Warming of the roof slant; — Replacement of doors; — Floor warming in the basement; — Energy management system; — Modernisation of central heating installations (including heat pump and fittings); — Installation of 10 kW photovoltaic installation. The results of the project expressed by indicators are: The amount of thermal energy saved 552, 20 GJ/year; The amount of electricity saved 23,4 MWh/year; Production of heat from newly built/new RES installations 4,783 MWht/year; Production of electricity from newly built/new generation capacity installations using RES 10 MWhe/year; An estimated annual decrease in greenhouse gas emissions of 58.09 tonnes of CO2 equivalent/year; Reduction of final energy consumption as a result of projects 636.1 GJ/year; Production of electricity from newly built installations using RES 10 MWhe/year; Production of heat from newly built installations using RES 4,783 MWht/year. The target group of the project is the service company Hubert Niedziałek, as well as indirectly thanks to the improvement of the air quality of the surrounding residents. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is to increase the energy efficiency of the service building of the Service Company Hubert Niedziałek and to protect and improve the environment by means of a deep thermo-modernisation with the use of renewable energy sources. The tasks planned in the project are: — Replacement of lighting; — Reconstruction of heat source for central heating; — Manufacturing of a mechanical ventilation system with heat recovery; — Terrace warming; — Warming of the outer walls; — Warming of the ceiling; — Window replacement; — Warming of the roof slant; — Replacement of doors; — Floor warming in the basement; — Energy management system; — Modernisation of central heating installations (including heat pump and fittings); — Installation of 10 kW photovoltaic installation. The results of the project expressed by indicators are: The amount of thermal energy saved 552, 20 GJ/year; The amount of electricity saved 23,4 MWh/year; Production of heat from newly built/new RES installations 4,783 MWht/year; Production of electricity from newly built/new generation capacity installations using RES 10 MWhe/year; An estimated annual decrease in greenhouse gas emissions of 58.09 tonnes of CO2 equivalent/year; Reduction of final energy consumption as a result of projects 636.1 GJ/year; Production of electricity from newly built installations using RES 10 MWhe/year; Production of heat from newly built installations using RES 4,783 MWht/year. The target group of the project is the service company Hubert Niedziałek, as well as indirectly thanks to the improvement of the air quality of the surrounding residents. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:49, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation and renovation of the service building
Project in Poland financed by DG Regio

    Statements

    0 references
    286,394.47 zloty
    0 references
    68,734.67 Euro
    13 January 2020
    0 references
    440,606.89 zloty
    0 references
    105,745.65 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 November 2017
    0 references
    31 December 2018
    0 references
    PRZEDSIĘBIORSTWO USŁUGOWE HUBERT NIEDZIAŁEK
    0 references
    0 references
    Głównym celem projektu jest zwiększenie efektywności energetycznej budynku usługowego Przedsiębiorstwa Usługowego Hubert Niedziałek oraz ochrona i poprawa stanu środowiska naturalnego poprzez głęboką termomodernizację wraz z wykorzystaniem odnawialnych źródeł energii. Zadania zaplanowane w projekcie to: - Wymiana oświetlenia; - Przebudowa źródła ciepła dla c.w.u.; - Wykonanie instalacji wentylacji mechanicznej z odzyskiem ciepła; - Ocieplenie tarasu; - Ocieplenie ścian zewnętrznych; - Ocieplenie stropodachu; - Wymiana okien; - Ocieplenie skosu dachu; - Wymiana drzwi; - Ocieplenie podłogi w suterenie; - System zarządzania energią; - Modernizacja instalacji c.o. (w tym pompa ciepła wraz z osprzętem); - Montaż instalacji fotowoltaicznej o mocy 10 kW. Rezultaty projektu wyrażone wskaźnikami to: Ilość zaoszczędzonej energii cieplnej 552, 20 GJ/rok; Ilość zaoszczędzonej energii elektrycznej 23,4 MWh/rok; Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE 4,783 MWht/rok; Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE 10 MWhe/rok; Szacowany roczny spadek emisji gazów cieplarnianych 58,09 tony równoważnika CO2/rok; Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów 636,1 GJ/rok; Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE 10 MWhe/rok; Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE 4,783 MWht/rok. Grupą docelową projektu jest przedsiębiorstwo Usługowe Hubert Niedziałek, jak również w sposób pośredni dzięki poprawie jakości powietrza okoliczni mieszkańcy. (Polish)
    0 references
    The main objective of the project is to increase the energy efficiency of the service building of the Service Company Hubert Niedziałek and to protect and improve the environment by means of a deep thermo-modernisation with the use of renewable energy sources. The tasks planned in the project are: — Replacement of lighting; — Reconstruction of heat source for central heating; — Manufacturing of a mechanical ventilation system with heat recovery; — Terrace warming; — Warming of the outer walls; — Warming of the ceiling; — Window replacement; — Warming of the roof slant; — Replacement of doors; — Floor warming in the basement; — Energy management system; — Modernisation of central heating installations (including heat pump and fittings); — Installation of 10 kW photovoltaic installation. The results of the project expressed by indicators are: The amount of thermal energy saved 552, 20 GJ/year; The amount of electricity saved 23,4 MWh/year; Production of heat from newly built/new RES installations 4,783 MWht/year; Production of electricity from newly built/new generation capacity installations using RES 10 MWhe/year; An estimated annual decrease in greenhouse gas emissions of 58.09 tonnes of CO2 equivalent/year; Reduction of final energy consumption as a result of projects 636.1 GJ/year; Production of electricity from newly built installations using RES 10 MWhe/year; Production of heat from newly built installations using RES 4,783 MWht/year. The target group of the project is the service company Hubert Niedziałek, as well as indirectly thanks to the improvement of the air quality of the surrounding residents. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.05.01.00-06-0014/17
    0 references