Extension and reconstruction of the sewage treatment plant in Malczyce. (Q95839): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Extension and reconstruction of the sewage treatment plant in Malczyce.

Revision as of 23:05, 15 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension and reconstruction of the sewage treatment plant in Malczyce.
Project in Poland financed by DG Regio

    Statements

    0 references
    7,652,923.85 zloty
    0 references
    1,836,701.72 Euro
    13 January 2020
    0 references
    9,003,439.82 zloty
    0 references
    2,160,825.56 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    12 August 2016
    0 references
    31 October 2018
    0 references
    GMINA MALCZYCE
    0 references
    Przedmiotem projektu jest przebudowa i rozbudowa oczyszczalni ścieków w Malczycach oraz modernizacja stacji uzdatniania wody w Malczycach, Dębicach, Mazurowicach i Wilczkowie.Zadania te zrealizujemy poprzez:1.przebudowę istniejących obiektów oczyszczalni ścieków; 2.budowę obiektów i urządzeń infrastruktury technologicznej 3.rozbiórkę: bioreaktora, słupów oświetleniowych, odc. drogi wewn., poletek osadu, zadaszonego miejsca grom. odpadów stałych, części ogrodzenia, odcinków: sieci kanalizacji grawitacyjnej i ciśnieniowej, sieci kanalizacji deszczowej, sieci wody czystej, kabli zasilających i sterowniczych, rurociągów osadu, części studzienek kanalizacyjnych; 4.wymianę stacji transformatorowej; 5. modernizację stacji uzdatniania wody w Malczycach, Dębicach, Mazurowicach i Wilczkowie poprzez montaż przepływomierza na wodzie surowej, remont orurowania filtrów F1+F2, montaż dmuchawy, modernizacje: instalacji sprężonego powietrza, systemu dezynfekcji wody, wymianę osuszacza powietrza, modernizację technologii uzdatniania wody, regeneracja studni, modern. elektryki i automatyki. Zadania zrealizują podmioty wybrane zgodnie z UPZP i/lub wytycznymi krajowymi i RPOWD.6.Przeprowadzenie akcji inform.-prom. projektu poprzez umieszczenie informacji o finansowaniu z UE na budynkach, sprzęcie(tablice, naklejki), zamieszczenie informacji o projekcie na stronie www UG, przekazanie informacji do lokalnej i regionalnej prasy. Wybrana technologia zapewni osiągnięcie efektów określonych w Rozp. MŚz18.11.14r.(Dz.U.2014 poz.1800). Reaktor będzie pracować w technologii niskoobciążonego tlenowo stabilizowanego osadu czynnego z możliwością równoczesnego usuwania związków biogennych (azotu i fosforu) metodą biologiczną w układzie przepływu ciągłego. (Polish)
    0 references
    The subject of the project is the reconstruction and expansion of the sewage treatment plant in Malczyce and the modernisation of water treatment stations in Malczyce, Dębica, Mazurowice and Wilczkowo.These tasks will be carried out by:1.reconstruction of existing sewage treatment plants; 2.construction of technological infrastructure facilities and equipment 3. demolition: bioreactor, lighting columns, interior roads, sediment field, covered area of solid waste, fence parts, sections: gravitational and pressure sewerage networks, rain drainage networks, clean water networks, power and control cables, sludge pipelines, sewage wells parts; 4. replacement of transformer station; 5. Modernisation of water treatment stations in Malczyce, Dębica, Mazurowice and Wilczków through installation of a flowmeter on raw water, renovation of F1+F2 filter piping, installation of blower, modernisation: compressed air installation, water disinfection system, air dryer replacement, modernisation of water treatment technology, well regeneration, modern. electrical and automation. The tasks will be carried out by entities selected in accordance with PPO and/or national guidelines and RPOWD.6.Provision of the project information by placing information on EU funding on buildings, equipment(tables, stickers), posting project information on the website of the EMU, providing information to local and regional press. The chosen technology will ensure that the results specified in Rozp are achieved. MŚz18.11.14r.(Journal of Laws 2014, item 1800). The reactor will operate in low-loaded oxygen stabilised sludge with the possibility of simultaneously removing biogenic compounds (nitrogen and phosphorus) using a biological method in the continuous flow system. (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.04.02.01-02-0019/16
    0 references