Construction of the S5 expressway. Nowy Marzy – Bydgoszcz (Q85936): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Construction of the S5 expressway. Nowy Marzy – Bydgoszcz

Revision as of 14:55, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the S5 expressway. Nowy Marzy – Bydgoszcz
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    1,083,417,200.5 zloty
    0 references
    260,020,128.12 Euro
    13 January 2020
    0 references
    1,274,608,471.18 zloty
    0 references
    305,906,033.08 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2021
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references

    53°11'31.9"N, 17°49'31.8"E
    0 references

    53°28'51.2"N, 18°25'36.8"E
    0 references
    Przedsięwzięcie polega na budowie drogi ekspresowej S5 na odc. Nowe Marzy - Bydgoszcz o łącznej dł. 73,84 km, zlokalizowanej w północno–środkowej części Polski i przebiegającej przez obszar województwa kujawsko - pomorskiego. Przedmiotowy odcinek zlokalizowany jest w sieci kompleksowej TEN-T. W wyniku realizacji projektu w 2019 r. zostanie osiągnięty wskaźnik produktu – wybudowanie 73,84 km nowych dróg. Projekt składa się z 4 odcinków (kontraktów): 1: Projekt i budowa drogi ekspresowej S5 na odc. od w. „Nowe Marzy” (bez węzła) do w. „Dworzysko” (z węzłem) o dł. ok. 23,3 km; od km 1+798,08 do km 25+108,48, 2: Projekt i budowa drogi ekspresowej S5 na odc. od w. „Dworzysko” (bez węzła) do w. „Aleksandrowo” (z węzłem) o dł. ok. 22,4 km; od km -0+021,00 do km 22+339,41, 3 - Projekt i budowa drogi ekspresowej S5 na odc. od w. „Aleksandrowo” (z węzłem) do w. „Tryszczyn” (z węzłem) o dł. ok. 14,7 km; od km -0+015,43 do km 14+678,76, 4 - Projekt i budowa drogi ekspresowej S5 na odc. od w. „Tryszczyn” (bez węzła) do w. „Białe Błota” (bez węzła) o dł. ok. 13,5 km; od km 14+678,76 do km 28+151,79. Na całym odcinku drogi S5 przewidziano przekrój 2-jezdniowy z 2 pasami ruchu, z wyjątkiem fragmentu z jezdniami zbierająco-rozprowadzającymi, pasem dzielącym oraz pasem awaryjnym, dostosowany do prognozowanego poziomu ruchu. Założona rezerwa terenowa umożliwia dalszą rozbudowę przekroju drogi do 3 pasów ruchu w każdym kierunku. (Polish)
    0 references
    The project consists of the construction of the S5 expressway on pc. Nowy Marzy – Bydgoszcz with total length. 73.84 km, located in the north-central part of Poland and passing through the Kujawsko-Pomorskie Voivodeship. This section is located in the TEN-T comprehensive network. As a result of the project in 2019, the output indicator – construction of 73.84 km of new roads will be achieved. The project consists of 4 sections (contracts): 1: Design and construction of the S5 expressway from St. “Nowe Marzy” (without a junction) to “Dworzysko” (with a junction) approx. 23,3 km; from km 1 + 798.08 to km 25 + 108,48, 2: The design and construction of the S5 expressway from St. “Dworzysko” (without a junction) to “Aleksandrowo” (with a junction) approx. 22,4 km; from km -0+ 021.00 to km 22 + 339.41, 3 – Design and construction of the S5 expressway on the section from “Aleksandrowo” (with a junction) to “Tryszczyn” (with a junction) length approx. 14,7 km; from km -0+ 015.43 to km 14 + 678.76, 4 – Design and construction of the S5 express road at the intersection from “Tryszczyn” (without a junction) to the “White Błota” (without a junction) approx. 13,5 km; from km 14 + 678.76 to km 28 + 151,79. A 2-lane cross-section with 2 lanes is provided throughout the S5 road, with the exception of a section with collection and distribution routes, a dividing belt and an emergency lane, adapted to the projected traffic level. The established field reserve allows further extension of the cross-section of the road to 3 lanes in each direction. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.04.01.00-00-0011/17
    0 references