Liquidation of the boiler house in Tychy. (Q85018): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project consists of the construction of a district heating network from pre-insulated pipes with thermal insulation with a suitable sealing plate and pumping station stabilising the control pressure.The starting point will be the heating chamber at ul.The Polish army has a preisolated network and the end of the network — the point of inclusion in an existing pre-insulated network at ul.Podleska., remove_old_english_translation)
(‎Created claim: summary (P836): The project consists of the construction of a heating network made of pre-insulated pipes with thick thermal insulation, together with a suitable cut-off fitting and pumping station to stabilise the available pressure. The starting point will be the heating chamber at the street. The Polish Army, where a pre-insulated network is established, and finally – the point of inclusion in the existing pre-insulated network at ul. It’s called Podleska.,...)
Property / summary
 
The project consists of the construction of a heating network made of pre-insulated pipes with thick thermal insulation, together with a suitable cut-off fitting and pumping station to stabilise the available pressure. The starting point will be the heating chamber at the street. The Polish Army, where a pre-insulated network is established, and finally – the point of inclusion in the existing pre-insulated network at ul. It’s called Podleska. (English)
Property / summary: The project consists of the construction of a heating network made of pre-insulated pipes with thick thermal insulation, together with a suitable cut-off fitting and pumping station to stabilise the available pressure. The starting point will be the heating chamber at the street. The Polish Army, where a pre-insulated network is established, and finally – the point of inclusion in the existing pre-insulated network at ul. It’s called Podleska. (English) / rank
 
Normal rank
Property / summary: The project consists of the construction of a heating network made of pre-insulated pipes with thick thermal insulation, together with a suitable cut-off fitting and pumping station to stabilise the available pressure. The starting point will be the heating chamber at the street. The Polish Army, where a pre-insulated network is established, and finally – the point of inclusion in the existing pre-insulated network at ul. It’s called Podleska. (English) / qualifier
 
point in time: 14 October 2020
Timestamp+2020-10-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:52, 14 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Liquidation of the boiler house in Tychy.
Project in Poland financed by DG Regio

    Statements

    0 references
    9,096,827.5 zloty
    0 references
    2,183,238.6 Euro
    13 January 2020
    0 references
    10,702,150.0 zloty
    0 references
    2,568,516.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 December 2016
    0 references
    28 February 2022
    0 references
    PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SP. Z O.O.
    0 references
    0 references
    0 references
    Projekt polega na budowie sieci ciepłowniczej z rur preizolowanych z pogrubioną izolacją termiczną wraz z odpowiednią armaturą odcinającą i przepompownią stabilizującą ciśnienie dyspozycyjne. Punktem początkowym będzie komora ciepłownicza przy ul. Wojska Polskiego gdzie doprowadzona jest sieć preizolowana, końcem natomiast - punkt włączenia w istniejącą sieć preizolowaną przy ul. Podleskiej. (Polish)
    0 references
    The project consists of the construction of a heating network made of pre-insulated pipes with thick thermal insulation, together with a suitable cut-off fitting and pumping station to stabilise the available pressure. The starting point will be the heating chamber at the street. The Polish Army, where a pre-insulated network is established, and finally – the point of inclusion in the existing pre-insulated network at ul. It’s called Podleska. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.01.07.02-00-0009/16
    0 references