Liquidation of the boiler house in Tychy. (Q85018): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: summary (P836): The project consists of the construction of a district heating network from pre-insulated pipes with thermal insulation with a suitable sealing plate and pumping station stabilising the control pressure.The starting point will be the heating chamber at ul.The Polish army has a preisolated network and the end of the network — the point of inclusion in an existing pre-insulated network at ul.Podleska., remove_old_english_translation) |
||
Property / summary | |||
Property / summary: The project consists of the construction of a district heating network from pre-insulated pipes with thermal insulation with a suitable sealing plate and pumping station stabilising the control pressure.The starting point will be the heating chamber at ul.The Polish army has a preisolated network and the end of the network — the point of inclusion in an existing pre-insulated network at ul.Podleska. (English) / rank | |||
Revision as of 14:52, 14 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Liquidation of the boiler house in Tychy. |
Project in Poland financed by DG Regio |
Statements
9,096,827.5 zloty
0 references
10,702,150.0 zloty
0 references
85.0 percent
0 references
30 December 2016
0 references
28 February 2022
0 references
PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SP. Z O.O.
0 references
Projekt polega na budowie sieci ciepłowniczej z rur preizolowanych z pogrubioną izolacją termiczną wraz z odpowiednią armaturą odcinającą i przepompownią stabilizującą ciśnienie dyspozycyjne. Punktem początkowym będzie komora ciepłownicza przy ul. Wojska Polskiego gdzie doprowadzona jest sieć preizolowana, końcem natomiast - punkt włączenia w istniejącą sieć preizolowaną przy ul. Podleskiej. (Polish)
0 references
Identifiers
POIS.01.07.02-00-0009/16
0 references