Energy renovation of the 9 buildings of the Regional Hospital for neurology and Hospitality in Lubiegu (Q95470): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: budget (P474): 688,623.768 euro) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 688,623.768 Euro / rank | |||||||||||||||
Property / budget: 688,623.768 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 688,623.768 Euro / qualifier | |||||||||||||||
|
Revision as of 01:42, 25 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of the 9 buildings of the Regional Hospital for neurology and Hospitality in Lubiegu |
Project in Poland financed by DG Regio |
Statements
2,438,875.84 zloty
0 references
2,869,265.7 zloty
0 references
85.0 percent
0 references
25 April 2016
0 references
31 December 2017
0 references
WOJEWÓDZKI SZPITAL DLA NERWOWO I PSYCHICZNIE CHORYCH W LUBIĄŻU
0 references
Przedmiotem projektu jest modernizacja energetyczna 9 budynków Wojewódzkiego Szpitala dla Nerwowo i Psychicznie Chorych w Lubiążu obejmująca: a)docieplenie przegród zewnętrznych i zapewnienie obecnie wymaganego oporu cieplnego;b)wymianę okien na bardziej szczelne;c) wprowadzenie wentylacji kontrolowanej z zastosowaniem nawiewników;d)montaż perlatorów i zaworów termostatycznych oraz liczników jako elementów systemu zarządzania energią. Ponadto przewiduje się zorganizowanie w ramach umowy z wykonawcą robót budowlanych szkoleń z obsługi urządzeń/systemów zarządzania energią dla osób stale korzystających z budynków (aby możliwe było osiągnięcie i utrzymanie zakładanych oszczędności energii).Przeprowadzenie działań ujętych w projekcie w sposób wyczerpujący zapewni osiągnięcie celów projektu. Inwestycja ma charakter kompleksowy, tj. zawiera wszystkie obowiązkowe komponenty: termomodernizacyjny z uzyskaną minimalną wymaganą oszczędnością energii w każdym budynku, zarządzania energią (montaż termostatów, perlatorów oraz liczników w każdym budynku) i komponent edukacyjny (szkoleniowy) – odniesienie się do kryterium kompleksowości modernizacji energetycznej budynku. Łącznie realizacja projektu pozwoli na zmniejszenie zapotrzebowania na ciepło o 10 910 GJ/rok, co daje średnią oszczędność energii dla wszystkich budynków na poziomie 28,74%, a także pozwoli na zredukowanie niskiej emisji gazów cieplarnianych i pyłów do atmosfery o ponad 5 ton na rok pyłów zawieszonych (PM 10g/GJ: 5 018 600) oraz redukcję CO2 o 1036 ton/rok. W każdym budynku oszczędność zapotrzebowania ciepła wyniesie powyżej 25%.Beneficjentem, Inwestorem i Operatorem projektu jest Wnioskodawca. Projektem będzie zarządzał powołany przez Dyrektora Szpitala Zespół Projektowy. Realizacja projektu przebiegać będzie zgodnie z polityką konkurencji i zamówień publicznych. (Polish)
0 references
The project consists of an energy upgrade of the 9 buildings of the Regional Hospital for neurotic Charity in Lubiąg, including: (a) the insulation of the building envelope and provision of the required thermal drag; (b) replacement of windows to be leak tight, (c) the introduction of ventilation controlled ventilation, (d) the installation of percolators and thermostatic valves and meters as components of the energy management system. In addition, it is envisaged to organise, within the framework of a contract with the contractor, a training on the use of energy management equipment/systems for persons who use the buildings permanently (in order to achieve and maintain the assumed energy savings).The activities included in the project will ensure that the project’s objectives are achieved. The investment is comprehensive, i.e. includes all mandatory components: thermal modernisation with the minimum required energy savings in each building, energy management (installation of thermostats, percolators and meters in each building) and an education component (training component) — reference to the complexity of the energy modernisation of the building. In total, the project will reduce heat demand by 10 910 GJ/year, resulting in an average of 28.74 % energy savings for all buildings, and will reduce the low greenhouse gas and dust emissions of particulate matter into the atmosphere by more than 5 tonnes suspended particulates (PM 10 g/GJ: 5 018 600) and a CO2 reduction of 1036 tonnes/year. Each building will save more than 25 % of the heat demand. the Beneficiary, the Investor and the Project Operation are the Applicant. The project will be managed by the director of the Project Team. The project will be carried out in accordance with competition policy and public procurement. (English)
0 references
Identifiers
RPDS.03.03.01-02-0002/16
0 references