Construction of a sewerage network in the village of Kościelec (Q85444): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: EU contribution (P835): 718,085.0232 euro) |
||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 718,085.0232 Euro / rank | |||||||||||||||
Property / EU contribution: 718,085.0232 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 718,085.0232 Euro / qualifier | |||||||||||||||
|
Revision as of 06:19, 23 September 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a sewerage network in the village of Kościelec |
Project in Poland financed by DG Regio |
Statements
2,992,020.93 zloty
0 references
3,520,024.63 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
29 November 2019
0 references
GMINA KOŚCIELEC
0 references
Projekt obejmuje budowę sieci kanalizacji sanitarnej wraz z przykanalikami oraz 3 przepompowni ścieków. Powstanie łącznie 8,55 km sieci kanalizacji sanitarnej, do której przyłączonych zostanie około 780 osób. Budowa sieci kanalizacji sanitarnej w miejscowości Kościelec stanowi jedno zadanie, przy czym zostało ono podzielone na dwa etapy realizacji: - I etap realizowany w 2018 r. i obejmujący prace związane z kolektorem „C” i „B”: -kanalizacja sanitarna grawitacyjna – 2251,9 mb; -rurociąg tłoczny – 1174,5 mb; -przykanaliki kanalizacyjne – 385,6 mb; -2 przepompownie ścieków. -II etap realizowany w 2019 r., obejmujący swym zakresem prace związane z kolektorem „A” -kanalizacja sanitarna grawitacyjna – 4393,4 mb; -rurociąg tłoczny – 727,5 mb; -przykanaliki kanalizacyjne – 1212,4 mb. (Polish)
0 references
The project involves the construction of a sewerage network including sewage systems and 3 sewage pumping stations.A total of 8.55 km of the sewerage network will be created to which around 780 persons will be connected.The construction of the sanitary sewage system in the town of Kościelec is one task, divided into two stages of implementation:— Phase I carried out in 2018 covering the work related to the “C” and “B” collectors:— gravity sanitary sewerage — 2251,9 mb;— discharge pipeline — 1174,5 mb;Sewage pipes — 385.6 mm;2 wastewater pumping stations.— Stage II carried out in 2019, covering the work relating to the ‘A’ power sewage sewer system — 4393,4 mb;— discharge pipeline — 727,5 mb;Sewage pipes — 1212,4 mb. (English)
0 references
Identifiers
POIS.02.03.00-00-0199/16
0 references