Elimination of low emission of pollutants at Cieszyn Centre — phase I (Q123989): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claims) |
||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 1,944,364.93 zloty / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 466,647.5832 Euro / rank | |||||||||||||||
Property / budget: 466,647.5832 Euro / qualifier | |||||||||||||||
| |||||||||||||||
Property / budget: 466,647.5832 Euro / qualifier | |||||||||||||||
|
Revision as of 22:05, 22 June 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Elimination of low emission of pollutants at Cieszyn Centre — phase I |
Project in Poland financed by DG Regio |
Statements
1,530,418.56 zloty
0 references
85.0 percent
0 references
8 December 2015
0 references
30 September 2019
0 references
MIASTO CIESZYN
0 references
Inwestycja dotyczy izolacji przegród zewnętrznych oraz likwidacji istniejących źródeł ciepła (głównie pieców kaflowych) na rzecz podłączenia do zbiorczej sieci ciepłowniczej w pięciu komunalnych budynkach mieszkalnych, zlokalizowanych w Cieszynie przy: a) ul. Bielskiej 20, b) ul. Błogockiej 30B, c) ul. Błogockiej 30C, d) ul. Chrobrego 3, e) ul. Przykopa 16 Projekt, dotyczący budynków wielorodzinnych o łącznej powierzchni użytkowej 2 582,94 m2, prowadzi do optymalizacji zużycia energii i przyczynia się do redukcji emisji CO2, z poziomu 393,29 Mg/rok do poziomu 124,28 Mg/rok, tj. o 269,01 Mg/rok (68,40%). (Polish)
0 references
The investment concerns the insulation of the building envelope and the decommissioning of existing heat sources (mainly kflon furnaces) for connection to a collective district heating network in five communal residential buildings, located in Cieszyn at: (a) ul. 20, (b) ul. Błocka 30B, (c) ul. Błocka 30C, (d) ul. Chrobre 3, (e) ul. The draft 16 for multi-family buildings with a total useful floor area of 2 582.94 m² leads to an optimisation of energy consumption and contributes to the reduction of CO2 emissions from 393,29 tonnes/year to 124,28 Mg/year, i.e. by 269,01 tonnes/year (68.40 %). (English)
0 references
Identifiers
RPSL.04.03.02-24-04A6/17
0 references