Increase in the energy efficiency of the enterprise GUBAD (Q112190): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Q2525364 / rank
 
Normal rank

Revision as of 17:19, 10 June 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Increase in the energy efficiency of the enterprise GUBAD
Project in Poland financed by DG Regio

    Statements

    0 references
    1,495,544.82 zloty
    0 references
    358,930.7568 Euro
    13 January 2020
    0 references
    3,302,557.4 zloty
    0 references
    792,613.776 Euro
    13 January 2020
    0 references
    55.91 percent
    0 references
    17 July 2019
    0 references
    17 July 2021
    0 references
    GUBAD-WZORNICTWO, PRODUKCJA, HANDEL SPÓŁKA Z OGRANICZONA OPDOWIEDZIALNOSCIĄ
    0 references
    0 references
    Projekt dotyczy poprawy efektywności energetycznej w przedsiębiorstwie GUBAD Wzornictwo, Produkcja, Handel Sp. z o.o. w zakresie: Modernizacji instalacji c.o., która obejmie wymianę pieca gazowego na piec opalany peletami o mocy ok 60 kW, zamontowanie automatyki na grzejnikach i nagrzewnicach. Nastawami termozaworów oraz pracą kotła będzie kierował system zarządzania energią. Modernizacji instalacji c.w.u: montaż perlatorów przy bateriach umywalkowych i zlewozmywakowych, Modernizacji procesu technologicznego cięcia blach zastąpienie pracy wycinarki laserowej o łącznej mocy całkowitej 66 kW i mocy cięcia 2,5 kW, na nową wycinarkę o mocy całkowitej 30kW i mocy cięcia 8,0 kW. Projekt obejmuje również niezbędne wydatki nieinwestycyjne: audyt energetyczny, audyt efektywności energetycznej, dokumentację projektową, promocję, audyty powykonawcze.Potrzeba realizacji projektu wynika z zidentyfikowanych problemów: nadmiernych straty ciepła i wysokich kosztów eksploatacyjnych na ogrzewanie, nadmiernego zużycia energii elektrycznej, zużywanej w procesie technologicznym, dużego zużycia nośników energii w przedsiębiorstwie oraz powiązana z nimi duża emisja zanieczyszczeń do powietrza.Wnioskodawca chce realizować projekt z uwagi na korzyści i zniwelowanie zidentyfikowanych problemów: ograniczenie kosztów eksploatacyjnych na ogrzewanie i energię elektryczną, ograniczenie zużycia nośników energii w przedsiębiorstwie, poprawa jakości powietrza związana z ograniczeniem emisji zanieczyszczeń z nośników energii: CO2, CO, SOx, zastosowanie OZE w przedsiębiorstwie, oszczędność zużycia wody.W ramach projektu nastąpi zwiększenie efektywności energetycznej w projekcie na poziomie 50,49 oraz zainstalowanie źródeł OZE. Realizacja projektu skutkuje obniżeniem emisji gazów cieplarnianych o 84,25 Mgrok oraz innych zanieczyszczeń CO, SOx. (Polish)
    0 references
    The project concerns the improvement of energy efficiency in the enterprise GUBAD, Design, Trade Sp. z o.o. with regard to: Modernisation of the c.o., which will include the replacement of a gas furnace onto kiln fired furnaces with a power of about 60 kW, the installation of automation on radiators and heaters. The energy management system will be administered by the thermostatic control box and the boiler work. Modernisation of hot service water installations: installation of percolators on wash basins and sinks, modernisation of the technological process sheet replacing the work of a laser cutting plate with a combined total power of 66 kW and a cut power of 2.5 kW, into a new brush with a total power of 30 kW and a cut power of 8.0 kW. The project also includes the necessary non-investment expenditure: energy audit, energy efficiency audit, project documentation, promotion, as-built audits. excessive heat loss and high operating costs for heating, excessive consumption of electricity, consumed in a technological process, high energy consumption of energy sources in the enterprise and the associated high emissions of polluting substances to the duplicates.Applicant wants to implement the project in view of the benefits and to alleviate the problems identified: reduction of operating costs for heating and electricity, reduction of the consumption of energy carriers in the enterprise, improvement of air quality linked to the reduction of emissions from energy carriers: CO2, CO, SOx, use of RES in the enterprise, water efficiency saving project will increase the energy efficiency of the project at level 50,49 and the installation of RES sources. The project results in a reduction of greenhouse gas emissions by 84,25 Mgr and other CO, SOx emissions. (English)
    0 references

    Identifiers

    RPMP.04.02.00-12-0530/18
    0 references