COMPLETION OF INFRASTRUCTURE WORKS AIMED AT THE CONSERVATION, EXPLOITATION AND ENJOYMENT OF THE GREEN CAVE (Q2051614): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item)
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank

Revision as of 21:46, 8 June 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
COMPLETION OF INFRASTRUCTURE WORKS AIMED AT THE CONSERVATION, EXPLOITATION AND ENJOYMENT OF THE GREEN CAVE
Project in Italy financed by DG Regio

    Statements

    0 references
    425,000.0 Euro
    0 references
    850,000.0 Euro
    0 references
    50.0 percent
    0 references
    2 September 2017
    0 references
    31 December 2019
    0 references
    COMUNE DI ALGHERO
    0 references
    0 references
    0 references

    40°33'36.07"N, 8°18'54.54"E
    0 references
    1.COMPLETAMENTO E RIPRISTINO CENTRO DI PRIMA ACCOGLIENZA 2.PISTA PEDONALE DI ACCESSO ADIACENTE ALLA STRADA PROVINCIALE 3.CONSOLIDAMENTO DELLA FALESIA SOVRASTANTE IL PERCORSO DI ACCESSO 4.CONSOLIDAMENTI ALL¿INTERNO DELLA GROTTA 5.RIPRISTINO DELLA ESISTENTE SCALINATA DI ACCESSO ESTERNA 6.REALIZZAZIONE NUOVI CAMMINAMENTI NEL PERCORSO INTERNO ALLA GROTTA 7.REALIZZAZIONE SISTEMA DI ILLUMINAZIONE PERCORSO DI ACCESSO 8.REALIZZAZIONE SISTEMA DI ILLUMINAZIONE INTERNO DELLA GROTTA 9.CARTELLONISTICA DI BASE IN SPAZI ATTREZZATI 10.SISTEMA DI MONITORAGGIO DEI PARAMETRI CHIMICI E FISICI 11.MONITORAGGIO DELLA STABILITà DELLA FALESIA E DELLA GROTTA 12.SCAVI ARCHEOLOGICI (Italian)
    0 references
    1.COMPLETING AND RE-ESTABLISHMENT OF FIRST RECEPTION CENTRE 2.PIDATE, ADJACENT TO THE PROVINCIAL ROAD 3.CONSOLIDATE, OF THE AREA OVER THE ACCESS PATH 4.CONSOLIDENUTION WITHIN THE CAVE 5.RIPRIMISINE OF THE EXISTING EXTERNAL ACCESS PATH 6.RESALYATION, NEW WALKWAYS IN THE INNER TRACK OF THE CAVE 7.PERFORMANCE OF THE LIGHTING SYSTEM OF ACCESS 8.RESALISATION SYSTEM FOR THE INTERNAL LIGHTING OF THE CAVE 9.CARTETLLONISTICA BASED IN 10.MONITORING OF THE CHEMICAL AND PHYSICAL PARAMETERS OF THE 11.MONITORING SYSTEM FOR THE DETERMINATION OF THE CHEMICAL AND PHYSICAL PARAMETERS OF THE 12.MONITORING ESTABLISHMENT.MONITORING) (English)
    0 references

    Identifiers