Revitalisation of the historic park in Jeziorany (Q4429419): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Import item from Poland)
(‎Changed an Item: Import item from Poland)
Property / coordinate location
 
53°46'43.46"N, 20°43'58.91"E
Latitude53.7787443
Longitude20.733027029754
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 53°46'43.46"N, 20°43'58.91"E / rank
 
Normal rank
Property / coordinate location: 53°46'43.46"N, 20°43'58.91"E / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Olsztyński / rank
 
Normal rank

Revision as of 19:38, 25 October 2022

Project Q4429419 in Poland
Language Label Description Also known as
English
Revitalisation of the historic park in Jeziorany
Project Q4429419 in Poland

    Statements

    0 references
    2,639,676.69 zloty
    0 references
    586,800.13 Euro
    0 references
    3,450,557.77 zloty
    0 references
    767,058.99 Euro
    0 references
    76.5 percent
    0 references
    5 October 2020
    0 references
    31 December 2022
    0 references
    GMINA JEZIORANY
    0 references
    0 references

    53°46'43.46"N, 20°43'58.91"E
    0 references
    Głównym celem projektu jest zachowanie materialnego dziedzictwa kulturowego oraz poprawa jakości życia mieszkańców Jezioran w wyniku rewitalizacji zdegradowanej części miasta, w tym starego parku miejskiego. Realizacja projektu pozwoli na rewitalizację zdegradowanej części miasta i przywrócenie mu dawnych funkcjonalności, a także ożywienie społeczno-gospodarcze m.Jeziorany, w tym pobudzenie aktywności środ.lokalnego i stymulowanie współpracy na rzecz jego rozwoju. Zapewni również wzmocnienie konkurencyjnej regionu poprzez wkład w rozwój poten.społeczno-gospod., w szczeg. poprzez realizację inwestycji mających na celu rewitalizację obiektów i niezbędne dostosowanie ich do pełnienia aktywnych funkcji, w tym edukacyjnych, rekreacyjno-wypoczynkowych. Zakres rob. budow., w tym prace związane z placem zabaw, gosp.drzewostanem, nasadzenia, bud.alejek, wyk.schod.terenowych z opornikami granitowymi i drewnianymi wraz z barierką, ochronę i zabezpieczenie skarpy, rozbiórka.istn.obiektów, oświetl.parkowe, zakup środ.trwałych (mała arch.parkowa). Etapy: opracowanie dokum.technicznej, przygot.i złożenie wniosku, w tym opracowanie studium wykonalności, podpisanie umowy, wybór wykonawcy i inspektora nadzoru, realizacja projektu, nadzór na pracami oraz promocja projektu, końcowe rozliczenie oraz utrzymanie projektu w okresie trwałości. Zniszczony park zostanie zrewaloryzowany oraz zagospodarowany z wykorzystaniem m.in. małej architektury. Projekt będzie realizowany na obszarze gm.Jeziorany. Łączny obszar pow.rewitalizowanych wynosi 21 895,00 m2. Realizacja zadania pozwoli rozwiązać problemy obsz.miejskich w ramach oprac.programu rewitalizacji. Tym samym, projekt wpisuje się w Cel tem. 9 – Promowanie włączenia społecznego, walka z ubóstwem i wszelką dyskryminacją, priorytet inwestycyjny 9b – Wspieranie rewitalizacji fizycznej, gospodarczej i społecznej ubogich społeczności na obszarach miejskich i wiejskich SzOOP RPO WiM Dz.8.1 Rewitalizacja obszarów miejskich. (Polish)
    0 references
    The main objective of the project is to preserve the material cultural heritage and improve the quality of life of the inhabitants of Jeziorany as a result of the revitalisation of the degraded part of the city, including the old city park. The implementation of the project will allow to revitalise the degraded part of the city and restore its old functionalities, as well as the socio-economic recovery of Lakes, including stimulating the activity of the local center and stimulating cooperation for its development. It will also ensure the strengthening of the competitive region by contributing to the development of social and business poten., in particular through the implementation of investments aimed at revitalisation of facilities and necessary adaptation to the performance of active functions, including educational, recreational and leisure activities. Scope of construction works, including works related to playground, gosp.drzewostan, planting, building.alejek, Wyk.schod.terenowe with granite and wooden resistors along with barrier, protection and protection of slopes, demolition.istn.objects, park lighting, purchase of durable media (small arch.parkowa). Stages: preparation of the technical document, preparation and submission of the application, including the development of a feasibility study, signing of the contract, selection of the contractor and supervision inspector, project implementation, supervision of works and project promotion, final settlement and maintenance of the project during the lifetime. The destroyed park will be revalorised and developed using, among others, small architecture. The project will be implemented in the area of Lake District. The total area of the revitalised area is 21 895.00 m². The implementation of the task will solve urban problems within the framework of the revitalisation programme. Thus, the project fits into the goal of this. 9 — Promoting social inclusion, combating poverty and all discrimination, Investment Priority 9b — Supporting physical, economic and social regeneration of deprived communities in urban and rural areas SzOOP ROP WiM OJ8.1 Revitalisation of urban areas. (English)
    0 references
    WOJ.: WARMIŃSKO-MAZURSKIE, POW.: olsztyński
    0 references

    Identifiers

    RPWM.08.01.00-28-0005/20
    0 references