Thermomodernisation of the public utility building in Tolko (Q4427803): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en, and other parts: Adding translation) |
(Changed an Item: Import item from Poland) |
||
Property / intervention field | |||
Property / intervention field: Energy efficiency renovation of public infrastructure, demonstration projects and supporting measures / rank | |||
Normal rank |
Revision as of 15:17, 24 October 2022
Project Q4427803 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermomodernisation of the public utility building in Tolko |
Project Q4427803 in Poland |
Statements
726,975.39 zloty
0 references
161,606.63 Euro
0 references
855,265.16 zloty
0 references
190,125.45 Euro
0 references
85.0 percent
0 references
26 September 2019
0 references
30 December 2021
0 references
GMINA BARTOSZYCE
0 references
Inwestycja polega na termomodernizacji budynku publicznego w msc.Tolko zlokalizowanego pod adresem Tolko 1, 11-200 Bartoszyce, dz. nr 1/12 obręb nr 66 - Tolko gm. Bartoszyce, przedmiot inwestycji stanowi wykonanie robót budowlanych i przebudowa budynku przedszkolnego w msc. Tolko, częściowo, tymczasowo zajmowanego na potrzeby siedziby Gminnego Ośrodka Kultury. Roboty kwalifikowalne : - ocieplenie ścian zewnętrznych 326,54m2, - ocieplenie stropodachów 378,62m2, - ocieplenie stropów nad piwnicami 232,95m2, - ocieplenie podłogi na gruncie (niepodpiwniczona część budynku) 147,80m2, - wymiana stolarki okiennej 36szt., - wymiana zewnętrznej stolarki drzwiowej 3szt., - montaż kotła na pelet i wymiana instalacji c.o., - montaż pompy ciepła wraz z zasobnikiem i wymianą instalacji c.w.u - wymiana oświetlenia 99 szt. opraw. Roboty niekwalifikowalne: - wymiana stolarki okiennej i drzwiowej w części piwnicznej, - wymiana parapetów, - wymiana posadzek i podłóg, - wymiana drzwi wewnętrznych p.poż, - prace rozbiórkowe instalacji c.o. i kotłowni, - prace rozbiórkowe stolarki okiennej i drzwiowej. Szczegółowy zakres opisano w studium wykonalności na str. 17. Projekt nie został zakończony i będzie realizowany jednoetapowo. Wnioskodawca planuje przeprowadzić przetarg na wyłonienie wykonawcy robót budowlanych, który wykona wszystkie prace budowlane we wskazanym terminie. Inwestorem projektu będzie Gmina Bartoszyce. Wnioskodawca jest przygotowany do realizacji projektu, posiada niezbędną dokumentację techniczną, audyt energetyczny, kosztorysy, pozwolenia. Odbiorcami projektu będą wszyscy mieszkańcy Gminy Bartoszyce, w tym dzieci do lat 3, dzieci z oddziałów przedszkolnych i kadra dydaktyczna. Po zakończeniu realizacji projektu operatorem jej produktów będzie Szkoła Podstawowa im. J. Brzechwy w Wojciechach. Projekt jest zgodny z Działaniem 4.3 Kompleksowa modernizacja energetyczna budynków, Poddziałaniem 4.3.1 Efektywność energetyczna w budynkach publicznych RPO WiM. (Polish)
0 references
The investment consists of thermal modernisation of a public building in msc.Tolko located at Tolko 1, 11-200 Bartoszyce, dz. No. 1/12 district No. 66 — Tolko ed. Bartoszyce, the subject of the investment is the execution of construction works and reconstruction of a kindergarten building in msc. Tolko, partially temporarily occupied for the needs of the Municipal Cultural Centre. Eligible works: — warming of external walls 326.54 m², — warming of stropods 378.62 m², — insulation of ceilings over cellars 232.95 m², — floor warming on the ground (unbasined part of the building) 147.80 m², — replacement of window joinery 36 pcs., — replacement of external door joinery 3 pcs., — installation of pellet boiler and replacement of c.o.o. installation of heat pump with storage tank and replacement of installation c.w.u — replacement of lighting 99 pcs. Ineligible works: — replacement of window and door joinery in the basement part, — replacement of window sills, — replacement of floors and floors, — replacement of internal fire doors, — demolition works of c.o. and boiler rooms, — demolition works of window and door joinery. The detailed scope is described in the feasibility study on p. 17. The project has not been completed and will be implemented in one step. The applicant plans to conduct a tender for the selection of a contractor who will carry out all the construction works within the specified deadline. The investor of the project will be the municipality of Bartoszyce. The applicant is prepared to implement the project, has the necessary technical documentation, energy audit, cost estimates, permits. The recipients of the project will be all residents of the Bartoszyce Commune, including children up to 3 years old, children from preschool units and teaching staff. After completion of the project, the operator of its products will be the J. Brzechwa Primary School in Wojciechy. The project is in line with Measure 4.3 Comprehensive energy modernisation of buildings, Sub-measure 4.3.1 Energy efficiency in public buildings ROP WiM. (English)
0 references
WOJ.: WARMIŃSKO-MAZURSKIE, POW.: bartoszycki
0 references
Identifiers
RPWM.04.03.01-28-0050/20
0 references