MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED PORT SYSTEM OF NAPOL’ A1 COMPLETION OF THE PORT SEWER SYSTEM (Q2023265): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): THE CONSTRUCTION AND UPGRADING OF THE INFRASTRUCTURE OF THE SEWAGE SYSTEM IS AN INTEGRAL PART OF THE ENVIRONMENTAL REHABILITATION OF THE PORT OF NAPLES AND Ê AN ELEMENT OF CRUCIAL IMPORTANCE FOR THE ADAPTATION TO EXISTING NATIONAL AND COMMUNITY LEGISLATION ON DISCHARGES OF WATER INTO THE SEA. A SEPARATE WASTE WATER COLLECTION NETWORK AND A BLACK WATER COLLECTION NETWORK. THE NEW NETWORK OF BLACK PORT WATERS WILL BE LOCATED ALONG THE MAIN PORT R...)
(‎Changed an Item)
Property / programme
 
Property / programme: Campania - ERDF / rank
 
Normal rank

Revision as of 04:21, 24 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED PORT SYSTEM OF NAPOL’ A1 COMPLETION OF THE PORT SEWER SYSTEM
Project in Italy financed by DG Regio

    Statements

    0 references
    16,500,000.0 Euro
    0 references
    22,000,000.0 Euro
    0 references
    75.0 percent
    0 references
    30 September 2014
    0 references
    30 March 2020
    0 references
    AUTORITA' DI SISTEMA PORTUALE DEL MAR TIRRENO CENTRALE
    0 references
    0 references
    0 references

    40°50'9.35"N, 14°14'55.61"E
    0 references
    LA REALIZZAZIONE ED IL POTENZIAMENTO DELLE INFRASTRUTTURE DELLA RETE FOGNARIA Ê PARTE INTEGRANTE DELLA RIQUALIFICAZIONE AMBIENTALE DEL PORTO DI NAPOLI ED Ê UN ELEMENTO DI FONDAMENTALE IMPORTANZA PER L'ADEGUAMENTO ALLE VIGENTI NORMATIVE NAZIONALI E COMUNITARIE IN TEMA DI IMMISSIONI DI ACQUE IN MARE. LA NUOVA RETE FOGNARIA SARà DI TIPO SEPARATO, OVVERO COSTITUITA DA UNA RETE DI RACCOLTA DELLE ACQUE BIANCHE E DA UNA RETE PER LA RACCOLTA DELLE ACQUE NERE. LA NUOVA RETE DI ACQUE NERE PORTUALE SARà UBICATA LUNGO LE PRINCIPALI STRADE PORTUALI E SARà REALIZZATA IN DEPRESSIONE AL FINE DI LIMITARE LA PROFONDITà DEGLI SCAVI E GARANTIRE IL FUNZIONAMENTO IDRAULICO ANCHE IN ASSENZA DI SIGNIFICATIVI DISLIVELLI GEODETICI. LA RETE FOGNANTE ESISTENTE VERRà RICONVERTITA INTEGRALMENTE PER IL COLLETTAMENTO DELLE SOLE ACQUE METEORICHE PER LE QUALI Ê PREVISTO UN TRATTAMENTO DI DISOLEAZIONE ED UNA SUCCESSIVA FILTRAZIONE PRIMA DEL LORO SVERSAMENTO A MARE. (Italian)
    0 references
    THE CONSTRUCTION AND UPGRADING OF THE INFRASTRUCTURE OF THE SEWAGE SYSTEM IS AN INTEGRAL PART OF THE ENVIRONMENTAL REHABILITATION OF THE PORT OF NAPLES AND Ê AN ELEMENT OF CRUCIAL IMPORTANCE FOR THE ADAPTATION TO EXISTING NATIONAL AND COMMUNITY LEGISLATION ON DISCHARGES OF WATER INTO THE SEA. A SEPARATE WASTE WATER COLLECTION NETWORK AND A BLACK WATER COLLECTION NETWORK. THE NEW NETWORK OF BLACK PORT WATERS WILL BE LOCATED ALONG THE MAIN PORT ROADS AND WILL BE CARRIED OUT IN A VACUUM, IN ORDER TO LIMIT THE EXCAVATION PROCESS AND ENSURE THE HYDRAULIC FUNCTIONING EVEN IN THE ABSENCE OF SIGNIFICANT GEODETIC LEVELS. THE EXISTING SEWERAGE NETWORK IS CONVERTED ENTIRELY FOR THE COLLECTION OF RAINWATER ONLY IN RESPECT OF WHICH IT IS INTENDED THAT THE TREATMENT OF DE-OILING AND A SUBSEQUENT FILTRATION BEFORE IT IS DISCHARGED INTO THE SEA. (English)
    0 references

    Identifiers

    I67D12000000006
    0 references