Item:Q192819: Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Cette opération a pour objet le déploiement d’une infrastructure de fourreaux au sein du territoire de la Ville de Saint Laurent du Maroni. Le projet est Divisé en deux axes, dont la réalization n’est pas séquencée temporellement. Dans le cadre du premier axe, le titulaire devra déployer une infrastructure de fourreaux et de fibre optique pour 44 sites du patrimoine municipal, devant être reliés entre eux („interconnexion municipale“). Dans le c...)
(‎Redirected to Q3700546)
Tag: New redirect
 
(7 intermediate revisions by the same user not shown)
redirectredirect
 
Q3700546
label / frlabel / fr
Conception - Réalisation d'une infrastructure locale de fourreaux et de fibres optiques
label / enlabel / en
Design – Development of a local fibre and foil infrastructure
label / delabel / de
Design – Schaffung einer lokalen Infrastruktur für Scheuer- und Glasfaserleitungen
description / endescription / en
Project Q192819 in France
description / frdescription / fr
Projet Q192819 en France
Property / French Kohesio ID
11670
 
Property / French Kohesio ID: 11670 / rank
Normal rank
 
Property / instance of
 
Property / instance of: Kohesio project / rank
Normal rank
 
Property / country
 
Property / country: France / rank
Normal rank
 
Property / EU contribution
2,564,025.7 Euro
Amount2,564,025.7 Euro
UnitEuro
 
Property / EU contribution: 2,564,025.7 Euro / rank
Normal rank
 
Property / budget
6,367,086.41 Euro
Amount6,367,086.41 Euro
UnitEuro
 
Property / budget: 6,367,086.41 Euro / rank
Normal rank
 
Property / postal code
97307
 
Property / postal code: 97307 / rank
Normal rank
 
Property / start time
1 February 2018
Timestamp+2018-02-01T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / start time: 1 February 2018 / rank
Normal rank
 
Property / end time
31 December 2018
Timestamp+2018-12-31T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 31 December 2018 / rank
Normal rank
 
Property / beneficiary name (string)
Société Publique Locale pour l'aménagement numérique de la Guyane
 
Property / beneficiary name (string): Société Publique Locale pour l'aménagement numérique de la Guyane / rank
Normal rank
 
Property / summary
Cette opération a pour objet le déploiement d’une infrastructure de fourreaux au sein du territoire de la Ville de Saint Laurent du Maroni. Le projet est divisé en deux axes, dont la réalisation n’est pas séquencée temporellement. Dans le cadre du premier axe, le titulaire devra déployer une infrastructure de fourreaux et de fibre optique pour 44 sites du patrimoine municipal, devant être reliés entre eux (« interconnexion municipale »). Dans le cadre du deuxième axe, le titulaire devra réaliser une infrastructure de fourreaux et de fibre optique pour deux catégories de sites : - D’une part, des sites d’intérêts économiques constitués d’administrations et de zones d’aménagements sur 29,8 km ; - D’autre part, des carbets numériques, qui seront des points d’accès numériques pour les zones les moins connectées de la Ville, sur 38,5 km. (French)
 
Property / summary: Cette opération a pour objet le déploiement d’une infrastructure de fourreaux au sein du territoire de la Ville de Saint Laurent du Maroni. Le projet est divisé en deux axes, dont la réalisation n’est pas séquencée temporellement. Dans le cadre du premier axe, le titulaire devra déployer une infrastructure de fourreaux et de fibre optique pour 44 sites du patrimoine municipal, devant être reliés entre eux (« interconnexion municipale »). Dans le cadre du deuxième axe, le titulaire devra réaliser une infrastructure de fourreaux et de fibre optique pour deux catégories de sites : - D’une part, des sites d’intérêts économiques constitués d’administrations et de zones d’aménagements sur 29,8 km ; - D’autre part, des carbets numériques, qui seront des points d’accès numériques pour les zones les moins connectées de la Ville, sur 38,5 km. (French) / rank
Normal rank
 
Property / summary
The purpose of this operation is to deploy a crap infrastructure within the territory of the City of Saint Laurent du Maroni. The project is divided into two axes, the realisation of which is not temporally sequenced. As part of the first axis, the licensee will be required to deploy crap and fibre-optic infrastructure for 44 municipal heritage sites, to be linked to each other (“municipal interconnection”). As part of the second axis, the holder will have to build a crap and fibre-optic infrastructure for two categories of sites: — On the one hand, sites of economic interest consisting of administrations and development areas covering 29,8 km; — On the other hand, digital carbets, which will be digital access points for the least connected areas of the city, over 38.5 km. (English)
 
Property / summary: The purpose of this operation is to deploy a crap infrastructure within the territory of the City of Saint Laurent du Maroni. The project is divided into two axes, the realisation of which is not temporally sequenced. As part of the first axis, the licensee will be required to deploy crap and fibre-optic infrastructure for 44 municipal heritage sites, to be linked to each other (“municipal interconnection”). As part of the second axis, the holder will have to build a crap and fibre-optic infrastructure for two categories of sites: — On the one hand, sites of economic interest consisting of administrations and development areas covering 29,8 km; — On the other hand, digital carbets, which will be digital access points for the least connected areas of the city, over 38.5 km. (English) / rank
Normal rank
 
Property / summary: The purpose of this operation is to deploy a crap infrastructure within the territory of the City of Saint Laurent du Maroni. The project is divided into two axes, the realisation of which is not temporally sequenced. As part of the first axis, the licensee will be required to deploy crap and fibre-optic infrastructure for 44 municipal heritage sites, to be linked to each other (“municipal interconnection”). As part of the second axis, the holder will have to build a crap and fibre-optic infrastructure for two categories of sites: — On the one hand, sites of economic interest consisting of administrations and development areas covering 29,8 km; — On the other hand, digital carbets, which will be digital access points for the least connected areas of the city, over 38.5 km. (English) / qualifier
point in time: 13 October 2020
Timestamp+2020-10-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / summary
Cette opération a pour objet le déploiement d’une infrastructure de fourreaux au sein du territoire de la Ville de Saint Laurent du Maroni. Le projet est Divisé en deux axes, dont la réalization n’est pas séquencée temporellement. Dans le cadre du premier axe, le titulaire devra déployer une infrastructure de fourreaux et de fibre optique pour 44 sites du patrimoine municipal, devant être reliés entre eux („interconnexion municipale“). Dans le cadre du deuxième axe, le titulaire devra réaliser une infrastructure de fourreaux et de fibre optique pour deux catégories de sites: — D‚une part, des sites d‘intérêts économiques constitués d‚administrations et de zone d‘aménagements sur 29,8 km; — D‚autre part, des carbets numériques, qui seront des points d‘accès numériques pour les zone les moins connectées de la Ville, sur 38,5 km. (German)
 
Property / summary: Cette opération a pour objet le déploiement d’une infrastructure de fourreaux au sein du territoire de la Ville de Saint Laurent du Maroni. Le projet est Divisé en deux axes, dont la réalization n’est pas séquencée temporellement. Dans le cadre du premier axe, le titulaire devra déployer une infrastructure de fourreaux et de fibre optique pour 44 sites du patrimoine municipal, devant être reliés entre eux („interconnexion municipale“). Dans le cadre du deuxième axe, le titulaire devra réaliser une infrastructure de fourreaux et de fibre optique pour deux catégories de sites: — D‚une part, des sites d‘intérêts économiques constitués d‚administrations et de zone d‘aménagements sur 29,8 km; — D‚autre part, des carbets numériques, qui seront des points d‘accès numériques pour les zone les moins connectées de la Ville, sur 38,5 km. (German) / rank
Normal rank
 
Property / summary: Cette opération a pour objet le déploiement d’une infrastructure de fourreaux au sein du territoire de la Ville de Saint Laurent du Maroni. Le projet est Divisé en deux axes, dont la réalization n’est pas séquencée temporellement. Dans le cadre du premier axe, le titulaire devra déployer une infrastructure de fourreaux et de fibre optique pour 44 sites du patrimoine municipal, devant être reliés entre eux („interconnexion municipale“). Dans le cadre du deuxième axe, le titulaire devra réaliser une infrastructure de fourreaux et de fibre optique pour deux catégories de sites: — D‚une part, des sites d‘intérêts économiques constitués d‚administrations et de zone d‘aménagements sur 29,8 km; — D‚autre part, des carbets numériques, qui seront des points d‘accès numériques pour les zone les moins connectées de la Ville, sur 38,5 km. (German) / qualifier
point in time: 26 November 2021
Timestamp+2021-11-26T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / coordinate location
4°56'20.58"N, 52°20'9.82"W
Latitude4.93904965
Longitude-52.33605895
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
 
Property / coordinate location: 4°56'20.58"N, 52°20'9.82"W / rank
Normal rank
 
Property / financed by
 
Property / financed by: European Union / rank
Normal rank
 
Property / programme
 
Property / programme: Guyane - ERDF/ESF / rank
Normal rank
 
Property / co-financing rate
40.27 percent
Amount40.27 percent
Unitpercent
 
Property / co-financing rate: 40.27 percent / rank
Normal rank
 
Property / beneficiary
 
Property / beneficiary: Q2539444 / rank
Normal rank
 
Property / ID used by InfoRegio
4720
 
Property / ID used by InfoRegio: 4720 / rank
Normal rank
 
Property / info Regio url
 
Property / info Regio url: https://ec.europa.eu/regional_policy/en/projects/europe/lamenagement-numerique-de-louest-guyanais / rank
Normal rank
 
Property / image url
 
Property / image url: https://ec.europa.eu/regional_policy/rest/projects/upload/4720.jpg / rank
Normal rank
 
Property / image url: https://ec.europa.eu/regional_policy/rest/projects/upload/4720.jpg / qualifier
summary: AgreenTech Valley, a hub dedicated to digital technologies for the crop sector. (English)
 
Property / image url: https://ec.europa.eu/regional_policy/rest/projects/upload/4720.jpg / qualifier
copyright: CC0 Creative Commons/Bru-nO
 
Property / fund
 
Property / fund: European Regional Development Fund / rank
Normal rank
 
Property / contained in NUTS
 
Property / contained in NUTS: Guyane / rank
Normal rank
 

Latest revision as of 13:44, 16 May 2022

Redirect to: