Rehabilitation of degraded areas in the town of Heves (Q3952274): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: fix budget)
(‎Removed claims)
Property / co-financing rate
100.0 percent
Amount100.0 percent
Unitpercent
 
Property / co-financing rate: 100.0 percent / rank
Normal rank
 
Property / budget
195,000,000.0 forint
Amount195,000,000.0 forint
Unitforint
 
Property / budget: 195,000,000.0 forint / rank
Normal rank
 
Property / budget
551,265.0 Euro
Amount551,265.0 Euro
UnitEuro
 
Property / budget: 551,265.0 Euro / rank
Preferred rank
 
Property / budget: 551,265.0 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / budget: 551,265.0 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
195,000,000.0 forint
Amount195,000,000.0 forint
Unitforint
 
Property / EU contribution: 195,000,000.0 forint / rank
Normal rank
 
Property / EU contribution
551,265.0 Euro
Amount551,265.0 Euro
UnitEuro
 
Property / EU contribution: 551,265.0 Euro / rank
Preferred rank
 
Property / EU contribution: 551,265.0 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / EU contribution: 551,265.0 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 04:33, 15 February 2022

Project Q3952274 in Hungary
Language Label Description Also known as
English
Rehabilitation of degraded areas in the town of Heves
Project Q3952274 in Hungary

    Statements

    0 references
    0 references
    1 February 2018
    0 references
    31 May 2020
    0 references
    HEVES VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    47°35'59.57"N, 20°16'28.31"E
    0 references
    Projektünk átfogó célja: a leszakadó vagy leszakadással veszélyeztetett akcióterületen koncentráltan megnyilvánuló társadalmi – fizikai – gazdasági problémák komplex módon való kezelése a területen élők társadalmi integrációjának elősegítése érdekében. A projekt speciális célja az érintett városrészek lakófunkciójának erősítése, meglévő funkcióinak bővítése, fejlesztése, szociális, közösségi funkciók kialakítása és a terület infrastrukturális fejlesztése. Jelen TOP-4.3.1 projekt és a vele párhuzamosan megvalósuló TOP-5.2.1 projekt együttesen fogja kifejteni azt a hatást, mely a leromlott városrész leszakadásának megállítását és a településrész városi szövetbe való integrálódását eredményezi. A program során Heves város 1., 2. és 3. szegregátumokból álló akcióterületén fogjuk megvalósítani az alábbi tevékenységeket: 3.1.1 ÖNÁLLÓAN TÉMOGATHATÓ TEVÉKENYSÉGEK: Lakófunkciót erősítő tevékenységek keretében az akcióterületen 7 db szociális bérlakás kialakítására kerül sor, 7 épület felújítása történik meg. A projektelem célja a szegregátum területén élők lakhatási körülményeinek javítása. 3.1.2 ÖNÁLLÓAN NEM TÁMOGATHATÓ, VÁLASZTHATÓ TEVÉKENYSÉGEK: B) KÖZBIZTONSÁGI FUNKCIÓ, A KÖZBIZTONSÁG JAVÍTÁSÁT, A FEJLESZTÉS EREDMÉNYEINEK MEGŐRZÉSÉT SZOLGÁLÓ TEVÉKENYSÉGEK: A szegregátum területén a közterületeken biztonságtechnikai, térfigyelő rendszer fejlesztése, telepítése: 5 db térfigyelő kamera elhelyezése az akcióterületen és a meglevő központtal az összeköttetés megteremtése történik meg. C) FOGLALKOZTATÁST ELŐSEGÍTŐ FUNKCIÓ: A projektelem keretében közösségi kert kialakítására, a terület rendezésére, kerítés építésére kerül sor. D) EGYÉB KAPCSOLÓDÓ FEJLESZTÉSEK: E tevékenység keretében történik meg a szegregátum területén található Dankó Pista utca felújítása teljes pályaszerkezettel, 515 m hosszúságban, 4 m szélességben, valamint a Nyár utca felújítása teljes pályaszerkezettel 100 m hosszúságban 3 m szélességben. Szintén az EGYÉB KAPCSOLÓDÓ FEJLESZTÉSEK a kialakított lakóépületekhez kerítés építésére, egy játszótér kialakítására, valamint a szegregátumok területén található illegális hulladéklerakók felszámolására. A projekt teljes mértékben illeszkedi az integrált területi programhoz, valamint a város Helyi Esélyegyenlőségi Programjához is. A város rendelkezik Integrált Településfejlesztési Stratégiával, melynek célkitűzéseivel a projektünk szinkronban van. Jelen projekt 2. mérföldkövének keretében kerül benyújtásra a széleskörű egyeztetések eredményeit felhasználva elkészülő Megvalósíthatósági Tanulmány és mellékletei. (Hungarian)
    0 references
    The overall objective of our project is: to address in a complex way social — physical — economic problems, which are concentrated in the action area at risk of falling down or at risk of separation, in order to promote the social integration of those living in the area. The specific objective of the project is to strengthen the residential function of the affected neighbourhoods, to expand and develop existing functions, to develop social and community functions and to develop the infrastructure of the area. This project TOP-4.3.1 together with the parallel project TOP-5.2.1 will have the effect of stopping the degraded part of the city and integrating it into urban fabric. During the programme, the following activities will be implemented in the action areas 1, 2 and 3 of the City of Heves: 3.1.1 SELF-ADMINISTRATIVE ACTIVITIES: Within the framework of activities strengthening the residential function, 7 social housing units will be built in the action area, 7 buildings will be refurbished. The aim of the project component is to improve housing conditions for people living in segregated areas. 3.1.2 OPTIONAL ACTIONS THAT ARE NOT ELIGIBLE INDIVIDUALLY: ACTIVITIES AIMED AT IMPROVING PUBLIC SECURITY FUNCTIONS, IMPROVING PUBLIC SECURITY AND PRESERVING THE RESULTS OF DEVELOPMENT: Development and installation of security technology and surveillance system in public spaces in the area of segregation: 5 surveillance cameras are placed in the action area and the connection with the existing centre is established. EMPLOYMENT PROMOTION FUNCTION: Within the framework of the project element, a community garden will be created, the area is organised, and the fence is built. D) OTHER RELATED DEVELOPMENTS: In the framework of this activity, the Dankó Pista street located in the segregation area will be refurbished with full track structure, 515 m longitude, 4 m width, and the refurbishment of the Summer Street with full track structure 100 m in length 3 m width. There are also OTHER REQUIREMENTS for the construction of fences, a playground and the removal of illegal landfills in segregated buildings. The project is fully aligned with the Integrated Territorial Programme and the City’s Local Equal Opportunities Programme. The city has an Integrated Urban Development Strategy, the objectives of which are synchronised with our project. In the framework of milestone 2 of this project, the feasibility study and its annexes will be submitted using the results of the wide-ranging discussions. (English)
    9 February 2022
    0 references
    L’objectif global de notre projet est de: s’attaquer de manière complexe aux problèmes économiques sociaux — physiques — qui se concentrent dans la zone d’action exposée au risque de chute ou de séparation, afin de promouvoir l’intégration sociale des habitants de la région. L’objectif spécifique du projet est de renforcer la fonction résidentielle des quartiers touchés, d’élargir et de développer les fonctions existantes, de développer des fonctions sociales et communautaires et de développer l’infrastructure de la région. Ce projet TOP-4.3.1 ainsi que le projet parallèle TOP-5.2.1 auront pour effet d’arrêter la partie dégradée de la ville et de l’intégrer dans le tissu urbain. Au cours du programme, les activités suivantes seront mises en œuvre dans les domaines d’action 1, 2 et 3 de la ville de Heves: 3.1.1 ACTIVITÉS AUTO-ADMINISTRATIVES: Dans le cadre des activités de renforcement de la fonction résidentielle, 7 logements sociaux seront construits dans la zone d’action, 7 bâtiments seront rénovés. L’objectif du projet est d’améliorer les conditions de logement des personnes vivant dans des zones isolées. 3.1.2 ACTIONS FACULTATIVES QUI NE SONT PAS ÉLIGIBLES INDIVIDUELLEMENT: ACTIVITÉS VISANT À AMÉLIORER LES FONCTIONS DE SÉCURITÉ PUBLIQUE, À AMÉLIORER LA SÉCURITÉ PUBLIQUE ET À PRÉSERVER LES RÉSULTATS DU DÉVELOPPEMENT: Développement et installation d’une technologie de sécurité et d’un système de surveillance dans les espaces publics dans le domaine de la ségrégation: 5 caméras de surveillance sont placées dans la zone d’action et la connexion avec le centre existant est établie. FONCTION DE PROMOTION DE L’EMPLOI: Dans le cadre de l’élément du projet, un jardin communautaire sera créé, la zone est organisée et la clôture est construite. D) AUTRES DÉVELOPPEMENTS CONNEXES: Dans le cadre de cette activité, la rue Dankó Pista située dans la zone de ségrégation sera rénovée avec une structure de voie complète, 515 m de longitude, 4 m de largeur, et la rénovation de la rue d’été avec une structure de voie complète de 100 m de longueur 3 m de largeur. Il y a aussi d’autres exigences pour la construction de clôtures, un terrain de jeux et l’enlèvement des décharges illégales dans les bâtiments séparés. Le projet est pleinement aligné sur le programme territorial intégré et le programme local d’égalité des chances de la ville. La ville dispose d’une stratégie de développement urbain intégré, dont les objectifs sont synchronisés avec notre projet. Dans le cadre de l’étape 2 de ce projet, l’étude de faisabilité et ses annexes seront soumises sur la base des résultats des larges discussions. (French)
    10 February 2022
    0 references
    Heves, Heves
    0 references

    Identifiers

    TOP-4.3.1-15-HE1-2016-00004
    0 references