Interior and outskirts of Decs Municipality (Q3949194): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: fix budget)
(‎Removed claims)
Property / co-financing rate
100.0 percent
Amount100.0 percent
Unitpercent
 
Property / co-financing rate: 100.0 percent / rank
Normal rank
 
Property / budget
381,762,142.0 forint
Amount381,762,142.0 forint
Unitforint
 
Property / budget: 381,762,142.0 forint / rank
Normal rank
 
Property / budget
1,079,241.58 Euro
Amount1,079,241.58 Euro
UnitEuro
 
Property / budget: 1,079,241.58 Euro / rank
Preferred rank
 
Property / budget: 1,079,241.58 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / budget: 1,079,241.58 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / EU contribution
381,762,142.0 forint
Amount381,762,142.0 forint
Unitforint
 
Property / EU contribution: 381,762,142.0 forint / rank
Normal rank
 
Property / EU contribution
1,079,241.58 Euro
Amount1,079,241.58 Euro
UnitEuro
 
Property / EU contribution: 1,079,241.58 Euro / rank
Preferred rank
 
Property / EU contribution: 1,079,241.58 Euro / qualifier
exchange rate to Euro: 0.002827 Euro
Amount0.002827 Euro
UnitEuro
 
Property / EU contribution: 1,079,241.58 Euro / qualifier
point in time: 13 February 2022
Timestamp+2022-02-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 03:28, 15 February 2022

Project Q3949194 in Hungary
Language Label Description Also known as
English
Interior and outskirts of Decs Municipality
Project Q3949194 in Hungary

    Statements

    0 references
    0 references
    6 June 2017
    0 references
    28 February 2021
    0 references
    DECS NAGYKÖZSÉG ÖNKORMÁNYZATA
    0 references
    0 references

    46°15'56.09"N, 18°48'47.99"E
    0 references
    A projekt keretében Decs Nagyközség belterületi csapadékvíz rendezése valósul meg a legsürgősebb beavatkozást igénylő területeken. Jelenleg a község belterületére hulló csapadékvizek levezetése a település jelentős részén nem megoldott. A tervezett fejlesztéssel érintett területeken részben egyáltalán nincsenek is vízelvezető árkok, illetve amik vannak, nem tudják ellátni alapvető funkciójukat, mivel a meglévő átereszek eltömődtek. Nagy esőzések után rendszeresen járhatatlanná válnak az utak, járdák, a lakóingatlanok védelmében is több alkalommal kellett intézkedéseket tenni. A vízelvezető árkok között nincs meg a kapcsolat, és így azok nem vezetik le a vizet település alatt húzódó Tabáni árokba, illetve a Dobornya-csatornába. További hiányosság, hogy a Tabáni árok és a Dobornya-csatorna között sincs megfelelő összeköttetés, hiányzik az átemelő és az árok rész. A tervezett vízelvezető rendszer egyaránt tartalmaz nyílt földárkos, és nyílt burkolt árkos, továbbá zárt csatornaszakaszokat is, igazodva a területi sajátosságokhoz és a szakmai kívánalmakhoz. A fejlesztés a következő területet érinti: Szőlőhegyi utca, Gárdonyi utca, Széchenyi utca, Alkotmány utca, Széll Judit utca, Deák utca, Dobornya csatorna, Tabáni árok. Mindösszesen 5 750 fm vízelvezető árok kiépítése történik meg (3 534 fm nyílt földárok, 736 fm nyílt, burkolt árok és 1480 fm zárt csatorna), továbbá sor kerül a szükséges mederrendezési munkák elvégzésére és a tározó felújítására is. A projekt előkészítettségét tekintve elmondható, hogy engedélyezési dokumentáció szintű tanulmánytervvel rendelkezik, az engedélyezési folyamat, valamint a kiviteli tervdokumentáció összeállítása a projektfejlesztési szakaszban történik meg. A beruházás megfelelő, szakszerű és gazdaságos megvalósításának biztosítása érdekében a szükséges jogosultságokkal rendelkező műszaki ellenőr kerül megbízásra, hogy az önkormányzat képviseletében eljárva, a kivitelezési munkálatokat folyamatosan figyelemmel kísérje, ellenőrizze annak szakmai megfelelőségét, tervek szerinti előrehaladását. A közbeszerzési eljárások szakértői tevékenysége részeként a Tolna Megyei Önkormányzati Hivatal, mint konzorciumi partner, dolgozza ki az ajánlattételi felhívást és dokumentációt, továbbá javaslatot tesz az értékelési szempontrendszerre, elkészíti a hirdetményeket, lebonyolítja a közbeszerzési cselekményeket, elvégzi a közbeszerzési eljárások dokumentálását, és lefolytatja a 272/2014. (XI. 5.) Korm. rendelet szerinti ellenőrzéseket. A projektmenedzsmenti feladatok ellátása keretében Tolna Megyei Önkormányzati Hivatal biztosítja a projekttervben megfogalmazott céloknak megfelelő teljesítések, eredmények elérését, továbbá elősegíti a rendelkezésre álló erőforrások optimális kihasználását és a vállalt határidők pontos betartását. A projekt megvalósítása során a Tolna Megyei Önkormányzati Hivatal a kötelező tájékoztatási és nyilvánosság biztosítási kötelezettsége keretében a „Széchenyi 2020 Kedvezményezettek Tájékoztatási Kötelezettségei útmutató és arculati kézikönyv „KTK 2020“” szerinti módon információt nyújt a projektről és a támogatásról. Kiegészítő tevékenységként betervezésre került a szemléletformáló, tájékoztató akciók lebonyolítása is, ennek tervezett szakmai tartalma a Projekt Előkészítő Tanulmányban került kifejtésre. (Hungarian)
    0 references
    Within the framework of the project, the settlement of urban rainwater in the village of Decs will be carried out in the most urgent areas. Currently, the drainage of rainwater falling into the inner part of the village has not been solved in a significant part of the settlement. In some of the areas affected by the planned development there are no drainage ditches at all, and what they have cannot perform their essential function, as the existing passages have been clogged. After heavy rainfall, measures to protect roads, sidewalks and residential real estates became impassable on a regular basis. There is no connection between the drainage ditches and thus they do not lead down to the Tabani ditch under the settlement or the Dobornya Canal. Another shortcoming is that there is no proper connection between the Taban ditch and the Dobornya Canal, with the passing and ditch parts missing. The planned drainage system includes both open muskets and open trenches, as well as closed sewer sections, adapted to the local characteristics and professional requirements. The development concerns the following areas: Grapehegyi street, Gárdonyi street, Széchenyi street, Constitution street, Széll Judit street, Deák street, Dobornya canal, Tabani ditch. A total of 5 750 fm drainage ditches are being built (3 534 fm open trench, 736 fm open, paved ditch and 1480 fm closed canal) and the necessary drainage works and refurbishment of the reservoir will be carried out. As regards the preparation of the project, it can be said that it has a study plan at the level of authorisation documentation, the permit granting process and the preparation of the construction plan documentation are carried out during the project development phase. In order to ensure the proper, professional and economical implementation of the project, the technical inspector with the necessary powers shall be instructed to continuously monitor the works and to verify its professional compliance and progress as planned, acting on behalf of the municipality. As part of its expert activities in public procurement procedures, Tolna County Local Government Office, as a consortium partner, develops the call for tenders and documentation, proposes the evaluation criteria, prepares notices, conducts public procurement actions, performs documentation of public procurement procedures and carries out the procedure in accordance with Article 272/2014. (XI. 5.) checks in accordance with Government Decree No 155/2014. As part of the performance of project management tasks, Tolna County Local Government Office ensures the achievement of the deliverables and results in accordance with the objectives set out in the project plan, and promotes the optimal use of the available resources and the correct compliance with the agreed deadlines. During the implementation of the project, the Tolna County Municipality Office shall provide information on the project and the support in accordance with the "Széchenyi 2020 Beneficiaries’ Information Obligations Guide and Identification Manual "KTK 2020" as part of the mandatory information and public insurance obligation. As an additional activity, the organisation of awareness-raising and information actions was also planned, and its planned professional content was explained in the Project Preparatory Study. (English)
    9 February 2022
    0 references
    Dans le cadre du projet, la colonisation des eaux pluviales urbaines dans le village de Decs sera réalisée dans les zones les plus urgentes. À l’heure actuelle, le drainage des eaux de pluie tombant dans la partie interne du village n’a pas été résolu dans une partie importante de la colonie. Dans certaines zones touchées par l’aménagement prévu, il n’y a aucun fossé de drainage et ce qu’ils n’ont pas pu remplir leur fonction essentielle, car les passages existants ont été bouchés. Après de fortes pluies, les mesures de protection des routes, des trottoirs et des biens immobiliers résidentiels sont devenues infranchissables régulièrement. Il n’y a pas de connexion entre les fossés de drainage et ils ne mènent donc pas vers le fossé Tabani sous la colonie ou le canal de Dobornya. Une autre lacune est qu’il n’y a pas de lien approprié entre le fossé de Taban et le canal de Dobornya, les parties passantes et les fossés manquants. Le système de drainage prévu comprend à la fois des mousquets ouverts et des tranchées ouvertes, ainsi que des tronçons d’égout fermés, adaptés aux caractéristiques locales et aux exigences professionnelles. Le développement concerne les domaines suivants: Rue Grapehegyi, rue Gárdonyi, rue Széchenyi, rue Constitution, rue Széll Judit, rue Deák, canal de Dobornya, fossé Tabani. Un total de 5 750 mm de fossés de drainage sont en cours de construction (3 534 fm de tranchée ouverte, 736 fm ouvert, fossé pavé et 1480 fm de canal fermé) et les travaux nécessaires de drainage et de remise en état du réservoir seront réalisés. En ce qui concerne la préparation du projet, on peut dire qu’il dispose d’un plan d’étude au niveau de la documentation d’autorisation, du processus d’octroi des autorisations et de la préparation de la documentation relative au plan de construction au cours de la phase de développement du projet. Afin d’assurer la mise en œuvre correcte, professionnelle et économique du projet, l’inspecteur technique, doté des pouvoirs nécessaires, est chargé de surveiller en permanence les travaux et de vérifier leur conformité professionnelle et l’état d’avancement prévu, agissant pour le compte de la municipalité. Dans le cadre de ses activités d’experts dans le domaine des procédures de passation de marchés publics, le bureau des collectivités locales du comté de Tolna, en tant que partenaire du consortium, élabore l’appel d’offres et la documentation, propose les critères d’évaluation, prépare des avis, mène des actions en matière de marchés publics, effectue la documentation des procédures de passation de marchés publics et exécute la procédure conformément à l’article 272/2014. (XI. 5.) contrôles conformément au décret gouvernemental no 155/2014. Dans le cadre de l’exécution des tâches de gestion de projet, le bureau de l’administration locale du comté de Tolna veille à la réalisation des produits livrables et des résultats conformément aux objectifs énoncés dans le plan de projet et favorise l’utilisation optimale des ressources disponibles et le respect correct des délais convenus. Au cours de la mise en œuvre du projet, le bureau de la municipalité du comté de Tolna fournira des informations sur le projet et le soutien conformément au "Guide des obligations d’information des bénéficiaires 2020 de Széchenyi 2020 et au manuel d’identification "KTK 2020" dans le cadre de l’obligation d’information obligatoire et de l’obligation d’assurance publique. En outre, l’organisation d’actions de sensibilisation et d’information a également été planifiée et son contenu professionnel planifié a été expliqué dans l’étude préparatoire du projet. (French)
    10 February 2022
    0 references
    Decs, Tolna
    0 references

    Identifiers

    TOP-2.1.3-15-TL1-2016-00027
    0 references