The building which is the subject of the project is located in the centre of Mohács, at Eötvös Street 2. Its function is a museum and library, which is used on average 224 days a year. The building was built 46 years ago. Its external walls were 45 % made of small solid bricks, 48.5 % prefabricated elements and 6.5 % of reinforced concrete pillars. The building has a flat roof, no cellar. On the D side with large windows that were replaced 6 years ago with two layers of glass plastic windows. The heat transmission factor of the replaced windows complies with the requirements of Annex 1 to Decree No 7/2006, they are in good condition, so we do not plan to replace them. The high summer heat load justifies the installation of an external shading system on the D side, the effect of which was taken into account in the preliminary heat engineering calculations after the renovation. Your costs will be included in the project. Other doors and windows are mainly metal-structured or wooden doors and windows with high heat transmission factors. Their replacement is justified. External containment structures are in the state of construction, we plan to achieve full thermal insulation. The heating of the facility is provided by a Viessmann VITOPLEX 100 low-temperature boiler installed for 6 years, which is highly efficient and we do not plan to replace it. The rooms are equipped with steel sheet radiators with thermostatic radiator valves. The boiler is operated by a weather-dependent control and programmable control unit allowing the automatic operation of reduced heating according to the time program. The heating system can be easily controlled under such conditions, it can be operated economically, and its replacement is neither justified nor planned. The building has 2 water blocks and a changing room. The hot water is provided by one electric boiler. As water consumption in the building is small, we do not want to change the way the boiler — hot water supply is supplied. We intend to install solar panels on the roof of the building within the framework of this project. The implementation of the project will be carried out in accordance with point 3.1 of the call for proposals. The self-eligible activities to be implemented under the project will be: According to the call for proposals 3.1.1: a) Energy efficiency-oriented development of municipal buildings by upgrading their external boundaries. In the case of the present project, at this point the building will be fully thermally insulated, replacing doors and windows and installing shielding structures. According to point 3.1.1(d) of the Call: The development of a small power plant (HMKE) photovoltaic system with a maximum household size will be developed to meet its own electricity demand. Mandatory non-eligible activities to be carried out in the course of the project: According to point 3.1.2.1(a) of the call for proposals, information and communication and physical accessibility, c) publicity, d) development of training material and training will be provided. (English)
Property / summary: The building which is the subject of the project is located in the centre of Mohács, at Eötvös Street 2. Its function is a museum and library, which is used on average 224 days a year. The building was built 46 years ago. Its external walls were 45 % made of small solid bricks, 48.5 % prefabricated elements and 6.5 % of reinforced concrete pillars. The building has a flat roof, no cellar. On the D side with large windows that were replaced 6 years ago with two layers of glass plastic windows. The heat transmission factor of the replaced windows complies with the requirements of Annex 1 to Decree No 7/2006, they are in good condition, so we do not plan to replace them. The high summer heat load justifies the installation of an external shading system on the D side, the effect of which was taken into account in the preliminary heat engineering calculations after the renovation. Your costs will be included in the project. Other doors and windows are mainly metal-structured or wooden doors and windows with high heat transmission factors. Their replacement is justified. External containment structures are in the state of construction, we plan to achieve full thermal insulation. The heating of the facility is provided by a Viessmann VITOPLEX 100 low-temperature boiler installed for 6 years, which is highly efficient and we do not plan to replace it. The rooms are equipped with steel sheet radiators with thermostatic radiator valves. The boiler is operated by a weather-dependent control and programmable control unit allowing the automatic operation of reduced heating according to the time program. The heating system can be easily controlled under such conditions, it can be operated economically, and its replacement is neither justified nor planned. The building has 2 water blocks and a changing room. The hot water is provided by one electric boiler. As water consumption in the building is small, we do not want to change the way the boiler — hot water supply is supplied. We intend to install solar panels on the roof of the building within the framework of this project. The implementation of the project will be carried out in accordance with point 3.1 of the call for proposals. The self-eligible activities to be implemented under the project will be: According to the call for proposals 3.1.1: a) Energy efficiency-oriented development of municipal buildings by upgrading their external boundaries. In the case of the present project, at this point the building will be fully thermally insulated, replacing doors and windows and installing shielding structures. According to point 3.1.1(d) of the Call: The development of a small power plant (HMKE) photovoltaic system with a maximum household size will be developed to meet its own electricity demand. Mandatory non-eligible activities to be carried out in the course of the project: According to point 3.1.2.1(a) of the call for proposals, information and communication and physical accessibility, c) publicity, d) development of training material and training will be provided. (English) / rank
 
Normal rank
Property / summary: The building which is the subject of the project is located in the centre of Mohács, at Eötvös Street 2. Its function is a museum and library, which is used on average 224 days a year. The building was built 46 years ago. Its external walls were 45 % made of small solid bricks, 48.5 % prefabricated elements and 6.5 % of reinforced concrete pillars. The building has a flat roof, no cellar. On the D side with large windows that were replaced 6 years ago with two layers of glass plastic windows. The heat transmission factor of the replaced windows complies with the requirements of Annex 1 to Decree No 7/2006, they are in good condition, so we do not plan to replace them. The high summer heat load justifies the installation of an external shading system on the D side, the effect of which was taken into account in the preliminary heat engineering calculations after the renovation. Your costs will be included in the project. Other doors and windows are mainly metal-structured or wooden doors and windows with high heat transmission factors. Their replacement is justified. External containment structures are in the state of construction, we plan to achieve full thermal insulation. The heating of the facility is provided by a Viessmann VITOPLEX 100 low-temperature boiler installed for 6 years, which is highly efficient and we do not plan to replace it. The rooms are equipped with steel sheet radiators with thermostatic radiator valves. The boiler is operated by a weather-dependent control and programmable control unit allowing the automatic operation of reduced heating according to the time program. The heating system can be easily controlled under such conditions, it can be operated economically, and its replacement is neither justified nor planned. The building has 2 water blocks and a changing room. The hot water is provided by one electric boiler. As water consumption in the building is small, we do not want to change the way the boiler — hot water supply is supplied. We intend to install solar panels on the roof of the building within the framework of this project. The implementation of the project will be carried out in accordance with point 3.1 of the call for proposals. The self-eligible activities to be implemented under the project will be: According to the call for proposals 3.1.1: a) Energy efficiency-oriented development of municipal buildings by upgrading their external boundaries. In the case of the present project, at this point the building will be fully thermally insulated, replacing doors and windows and installing shielding structures. According to point 3.1.1(d) of the Call: The development of a small power plant (HMKE) photovoltaic system with a maximum household size will be developed to meet its own electricity demand. Mandatory non-eligible activities to be carried out in the course of the project: According to point 3.1.2.1(a) of the call for proposals, information and communication and physical accessibility, c) publicity, d) development of training material and training will be provided. (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:55, 9 February 2022

Project Q3950699 in Hungary
Language Label Description Also known as
English
Energy modernisation of the Dorottya Museum and Library of Kanizsa
Project Q3950699 in Hungary

    Statements

    0 references
    0 references
    64,225,211 forint
    0 references
    177,596.20 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    218,996.97 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    80,112,276.566 forint
    0 references
    80.168687 percent
    0 references
    1 September 2018
    0 references
    29 November 2021
    0 references
    MOHÁCS VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    45°59'36.17"N, 18°40'55.60"E
    0 references
    A projekt tárgyát képező épület Mohács belvárosában, az Eötvös utca 2. szám alatt található. Funkciója múzeum és könyvtár, melyet évente átlagosan 224 napon használnak. Az épület 46 éve épült. Külső falai 45 %-ban kisméretű tömör téglából, 48,5%-ban előregyártott elemekből, 6,5 %-ban vasbeton pillérekből készültek. Az épület lapostetős, pince nincs. A D-i oldalon nagyméretű ablakokkal, melyeket 6 évvel ezelőtt kicseréltek 2 rétegű üvegezésű műanyag ablakokra. A kicserélt ablakok hőátbocsátási tényezője megfelel a 7/2006 TNM rendelet 1. mellékletében szereplő követelményeknek, jó állapotban vannak, ezért ezek cseréjét nem tervezzük. A nagy nyári hőterhelés indokolttá teszi, hogy a D-i oldalon külső árnyékoló rendszer létesüljön, mely hatását a felújítás utáni előzetes hőtechnikai számításoknál figyelembe vettünk. Költségeit a projektben szerepeltetjük. A többi nyílászáró nagyobb részben fémszerkezetű, ill. fa nyílászáró, magas hőátbocsátási tényezőkkel. Cseréjük indokolt. A külső határoló szerkezetek építéskori állapotban vannak, teljes körű hőszigetelését tervezzük megvalósítani. A létesítmény fűtését egy 6 éve beépített Viessmann VITOPLEX 100 alacsonyhőmérsékletű kazán biztosítja, mely igen jó hatásfokú, cseréjét nem tervezzük. A helyiségekben termosztatikus radiátorszelepekkel ellátott acéllemez radiátorok vannak felszerelve. A kazánt időjárásfüggő szabályozó és programozható szabályozó egység működteti, lehetővé téve az időprogram szerinti csökkentett fűtés automatikus működtetését. A fűtési rendszer ilyen feltételekkel könnyen szabályozható, gazdaságosan működtethető, cseréje nem indokolt, nem is tervezzük. Az épületben 2 db vizes blokk és egy pelenkázó helyiség található. A meleg vizet 1 db villanybojler biztosítja. Mivel az épületben a vízfogyasztás elenyésző, a bojler cseréjét – meleg víz ellátás mikéntjét nem akarjuk megváltoztatni. Az épület tetejére napelemeket kívánunk telepíteni jelen projekt keretein belül. A projekt megvalósítása a pályázati Felhívás 3.1 pontjában leírtakkal összhangban kerül megvalósításra. A projekt keretében megvalósítandó önállóan támogatható tevékenységek a következőek lesznek: A pályázati felhívás 3.1.1. szerint: a) Önkormányzati tulajdonú épületek energiahatékonyság-központú fejlesztése, külső határoló szerkezeteik korszerűsítése által. Jelen projekt esetében ennél a pontnál az épület teljes körű külső hőszigetelése, nyílászáró cseréje és árnyékoló szerkezetek elhelyezése valósul meg. A Felhívás 3.1.1. d) pontja szerint: Maximum háztartási méretű kis erőmű (HMKE) fotovillamos rendszer kialakítása saját villamosenergia-igény kielégítése céljából napelemes rendszer kerül kialakításra. A projekt során megvalósításra kerülő kötelezően megvalósítandó, önállóan nem támogatható tevékenységek: A pályázati Felhívás 3.1.2.1 a) pontja szerint infokommunikációs és fizikai akadálymentesítés, c) nyilvánosság biztosítása, d) képzési anyag kidolgozása és képzés tartása valósul meg. (Hungarian)
    0 references
    The building which is the subject of the project is located in the centre of Mohács, at Eötvös Street 2. Its function is a museum and library, which is used on average 224 days a year. The building was built 46 years ago. Its external walls were 45 % made of small solid bricks, 48.5 % prefabricated elements and 6.5 % of reinforced concrete pillars. The building has a flat roof, no cellar. On the D side with large windows that were replaced 6 years ago with two layers of glass plastic windows. The heat transmission factor of the replaced windows complies with the requirements of Annex 1 to Decree No 7/2006, they are in good condition, so we do not plan to replace them. The high summer heat load justifies the installation of an external shading system on the D side, the effect of which was taken into account in the preliminary heat engineering calculations after the renovation. Your costs will be included in the project. Other doors and windows are mainly metal-structured or wooden doors and windows with high heat transmission factors. Their replacement is justified. External containment structures are in the state of construction, we plan to achieve full thermal insulation. The heating of the facility is provided by a Viessmann VITOPLEX 100 low-temperature boiler installed for 6 years, which is highly efficient and we do not plan to replace it. The rooms are equipped with steel sheet radiators with thermostatic radiator valves. The boiler is operated by a weather-dependent control and programmable control unit allowing the automatic operation of reduced heating according to the time program. The heating system can be easily controlled under such conditions, it can be operated economically, and its replacement is neither justified nor planned. The building has 2 water blocks and a changing room. The hot water is provided by one electric boiler. As water consumption in the building is small, we do not want to change the way the boiler — hot water supply is supplied. We intend to install solar panels on the roof of the building within the framework of this project. The implementation of the project will be carried out in accordance with point 3.1 of the call for proposals. The self-eligible activities to be implemented under the project will be: According to the call for proposals 3.1.1: a) Energy efficiency-oriented development of municipal buildings by upgrading their external boundaries. In the case of the present project, at this point the building will be fully thermally insulated, replacing doors and windows and installing shielding structures. According to point 3.1.1(d) of the Call: The development of a small power plant (HMKE) photovoltaic system with a maximum household size will be developed to meet its own electricity demand. Mandatory non-eligible activities to be carried out in the course of the project: According to point 3.1.2.1(a) of the call for proposals, information and communication and physical accessibility, c) publicity, d) development of training material and training will be provided. (English)
    9 February 2022
    0 references
    Mohács, Baranya
    0 references

    Identifiers

    TOP-3.2.1-16-BA1-2017-00011
    0 references