The drinking water supply system of Bálványos Municipality is connected to the South East-Balaton Regional System (DKBRV) in operation of DRV Zrt. The exit point of DKBRV is established in Kőröshegy, based on geographical conditions. At Kőröshegy’s D water reservoir (2x100 m³ pool) it is necessary to build up pressure increase. The water transferred is transferred to the high point reservoir between Kőröshegy and Bálványos on a DN100 (göv) transmission line and then gravitally to the drinking water network of the village of Bálványos on the D90 (KPE) pipeline. At the transfer point, it is connected with a pressure-reducing ring stem to the existing drinking water network, the DN100 distribution line in Kossuth L. Street. The planned reconstruction does not exceed 20 % of the total eligible costs. (English) | |||||||||||||||
Property / summary: The drinking water supply system of Bálványos Municipality is connected to the South East-Balaton Regional System (DKBRV) in operation of DRV Zrt. The exit point of DKBRV is established in Kőröshegy, based on geographical conditions. At Kőröshegy’s D water reservoir (2x100 m³ pool) it is necessary to build up pressure increase. The water transferred is transferred to the high point reservoir between Kőröshegy and Bálványos on a DN100 (göv) transmission line and then gravitally to the drinking water network of the village of Bálványos on the D90 (KPE) pipeline. At the transfer point, it is connected with a pressure-reducing ring stem to the existing drinking water network, the DN100 distribution line in Kossuth L. Street. The planned reconstruction does not exceed 20 % of the total eligible costs. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The drinking water supply system of Bálványos Municipality is connected to the South East-Balaton Regional System (DKBRV) in operation of DRV Zrt. The exit point of DKBRV is established in Kőröshegy, based on geographical conditions. At Kőröshegy’s D water reservoir (2x100 m³ pool) it is necessary to build up pressure increase. The water transferred is transferred to the high point reservoir between Kőröshegy and Bálványos on a DN100 (göv) transmission line and then gravitally to the drinking water network of the village of Bálványos on the D90 (KPE) pipeline. At the transfer point, it is connected with a pressure-reducing ring stem to the existing drinking water network, the DN100 distribution line in Kossuth L. Street. The planned reconstruction does not exceed 20 % of the total eligible costs. (English) / qualifier | |||||||||||||||
point in time: 9 February 2022
|
Revision as of 10:08, 9 February 2022
Project Q3943301 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Bálványos Drinking Water Quality Improvement Program |
Project Q3943301 in Hungary |
Statements
204,696,000 forint
0 references
745,715.082 Euro
0.0027336256 Euro
15 December 2021
0 references
272,793,421.912 forint
0 references
75.037001 percent
0 references
22 February 2016
0 references
25 October 2019
0 references
NFP Nemzeti Fejlesztési Programiroda Nonprofit Korlátolt Felelősségű Társaság
0 references
Bálványos Település ivóvízellátó rendszere rákötésre kerül a DRV Zrt. üzemeltetésében lévő Délkelet-balatoni Regionális Rendszerére (DKBRV). A DKBRV lecsatlakozási pontja a földrajzi adottságok alapján Kőröshegy településen létesül. Kőröshegy D-i víztárolójánál (2x100 m3-es medence) nyomásfokozás kiépítése szükséges. Az átadott vizet egy DN100 (göv) távvezetéken Kőröshegy és Bálványos közötti magas ponti tározóba, majd onnét D90 (kpe) távezetéken gravitációsan Bálványos település ivóvízhálózatába vezetik. Az átadási ponton nyomáscsökkentő gyűrűszárral csatlakozik a meglévő ivóvízhálózat, a Kossuth L. utcai DN100 elosztó vezetékre. A tervezett rekonstrukció mértéke nem haladja meg az elszámolható összköltség 20%-át. (Hungarian)
0 references
The drinking water supply system of Bálványos Municipality is connected to the South East-Balaton Regional System (DKBRV) in operation of DRV Zrt. The exit point of DKBRV is established in Kőröshegy, based on geographical conditions. At Kőröshegy’s D water reservoir (2x100 m³ pool) it is necessary to build up pressure increase. The water transferred is transferred to the high point reservoir between Kőröshegy and Bálványos on a DN100 (göv) transmission line and then gravitally to the drinking water network of the village of Bálványos on the D90 (KPE) pipeline. At the transfer point, it is connected with a pressure-reducing ring stem to the existing drinking water network, the DN100 distribution line in Kossuth L. Street. The planned reconstruction does not exceed 20 % of the total eligible costs. (English)
9 February 2022
0 references
Bálványos, Somogy
0 references
Identifiers
KEHOP-2.1.2-15-2016-00007
0 references