In the framework of this project, the company is expanding its surface treatment capacity at its existing site in Borna in order to provide its customers with higher added value services through increased production volume and processing of larger workpieces. The following equipment will be procured under the project: — hydraulic CNC-controlled edge bending — batch-operated chemical pre-treatment equipment (the manual upper-track convejoron of the workpieces placed at the dispatch point arrives at the dispatch position of the equipment from which an auxiliary chain handling device delivers the workpieces according to the order of technology. The equipment consists of a tub line, superstructure and mechanical units), — water drying furnace (the workpieces arrive on the convejoron. The water-drying tunnel is heated by an indirect gas heating unit. Heat is distributed evenly in the duct), — dust burner furnace (the workpieces arrive on the manual convejoron. The furnace is heated by an indirect gas heating unit. Heat is distributed evenly in the duct), — manual material handling system (the workpieces are transported in a manual convejor orbit by the operator staff between the processing sites), — auxiliary chain handling equipment (The purpose of the equipment is to move work pieces horizontally in the automatic chemical pre-treatment cabin. The auxiliary chain handler moves it back and forth according to the technological location and time by grasping the part of the working beam specially designed for this purpose. In this way, less nozzles are required in the pre-treatment cabin and the corresponding mechanical and chemical cleaning process is carried out uniformly throughout the workpieces). The clear reason for the purchase of the front bending machine is the capacity constraints currently present in this area. The surface treatment serves to expand the existing ditto-painting capacity, which can be considered obsolete from the point of view of customer expectations, and, on the other hand, allows the new process to sell products that also have a minimum of 480 hours of salt spray test. The latter aspect is a key factor in the expansion of the company’s export market and is therefore of decisive importance. By purchasing a total net value of HUF 98.8 million, the company will not only increase its surface treatment capacity, but will be able to produce exportable products that meet significantly higher quality requirements, i.e. providing higher value added services to its customers, thereby significantly advancing in the production value chain. (English) | |||||||||||||||
Property / summary: In the framework of this project, the company is expanding its surface treatment capacity at its existing site in Borna in order to provide its customers with higher added value services through increased production volume and processing of larger workpieces. The following equipment will be procured under the project: — hydraulic CNC-controlled edge bending — batch-operated chemical pre-treatment equipment (the manual upper-track convejoron of the workpieces placed at the dispatch point arrives at the dispatch position of the equipment from which an auxiliary chain handling device delivers the workpieces according to the order of technology. The equipment consists of a tub line, superstructure and mechanical units), — water drying furnace (the workpieces arrive on the convejoron. The water-drying tunnel is heated by an indirect gas heating unit. Heat is distributed evenly in the duct), — dust burner furnace (the workpieces arrive on the manual convejoron. The furnace is heated by an indirect gas heating unit. Heat is distributed evenly in the duct), — manual material handling system (the workpieces are transported in a manual convejor orbit by the operator staff between the processing sites), — auxiliary chain handling equipment (The purpose of the equipment is to move work pieces horizontally in the automatic chemical pre-treatment cabin. The auxiliary chain handler moves it back and forth according to the technological location and time by grasping the part of the working beam specially designed for this purpose. In this way, less nozzles are required in the pre-treatment cabin and the corresponding mechanical and chemical cleaning process is carried out uniformly throughout the workpieces). The clear reason for the purchase of the front bending machine is the capacity constraints currently present in this area. The surface treatment serves to expand the existing ditto-painting capacity, which can be considered obsolete from the point of view of customer expectations, and, on the other hand, allows the new process to sell products that also have a minimum of 480 hours of salt spray test. The latter aspect is a key factor in the expansion of the company’s export market and is therefore of decisive importance. By purchasing a total net value of HUF 98.8 million, the company will not only increase its surface treatment capacity, but will be able to produce exportable products that meet significantly higher quality requirements, i.e. providing higher value added services to its customers, thereby significantly advancing in the production value chain. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: In the framework of this project, the company is expanding its surface treatment capacity at its existing site in Borna in order to provide its customers with higher added value services through increased production volume and processing of larger workpieces. The following equipment will be procured under the project: — hydraulic CNC-controlled edge bending — batch-operated chemical pre-treatment equipment (the manual upper-track convejoron of the workpieces placed at the dispatch point arrives at the dispatch position of the equipment from which an auxiliary chain handling device delivers the workpieces according to the order of technology. The equipment consists of a tub line, superstructure and mechanical units), — water drying furnace (the workpieces arrive on the convejoron. The water-drying tunnel is heated by an indirect gas heating unit. Heat is distributed evenly in the duct), — dust burner furnace (the workpieces arrive on the manual convejoron. The furnace is heated by an indirect gas heating unit. Heat is distributed evenly in the duct), — manual material handling system (the workpieces are transported in a manual convejor orbit by the operator staff between the processing sites), — auxiliary chain handling equipment (The purpose of the equipment is to move work pieces horizontally in the automatic chemical pre-treatment cabin. The auxiliary chain handler moves it back and forth according to the technological location and time by grasping the part of the working beam specially designed for this purpose. In this way, less nozzles are required in the pre-treatment cabin and the corresponding mechanical and chemical cleaning process is carried out uniformly throughout the workpieces). The clear reason for the purchase of the front bending machine is the capacity constraints currently present in this area. The surface treatment serves to expand the existing ditto-painting capacity, which can be considered obsolete from the point of view of customer expectations, and, on the other hand, allows the new process to sell products that also have a minimum of 480 hours of salt spray test. The latter aspect is a key factor in the expansion of the company’s export market and is therefore of decisive importance. By purchasing a total net value of HUF 98.8 million, the company will not only increase its surface treatment capacity, but will be able to produce exportable products that meet significantly higher quality requirements, i.e. providing higher value added services to its customers, thereby significantly advancing in the production value chain. (English) / qualifier | |||||||||||||||
point in time: 8 February 2022
|
Revision as of 16:29, 8 February 2022
Project Q3919302 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Expansion of the surface treatment capacity of Hantech Zrt. |
Project Q3919302 in Hungary |
Statements
98,858,349 forint
0 references
772,119.182 Euro
0.0027336256 Euro
14 December 2021
0 references
282,452,425.714 forint
0 references
34.999999 percent
0 references
7 July 2016
0 references
30 December 2016
0 references
HANTECH Gépgyártó és Forgalmazó Zártkörüen Müködő Részvénytársaság
0 references
Jelen projekt keretében a társaság meglévő csornai telephelyén felületkezelő kapacitását bővíti, annak érdekében, hogy a megnövekedett termelési volumen és a nagyobb méretű munkadarabok megmunkálása révén magasabb hozzáadott értékű szolgáltatásokat nyújtson ügyfelei számára. A projekt keretében az alábbi eszközök beszerzésére kerül sor: - hidraulikus CNC-vezérelt élhajlító - szakaszos üzemű vegyi előkezelő berendezés (a feladóhelyen felhelyezett munkadarabokat kézi felsőpályás konvejoron érkezik a berendezés feladási pozíciójába ahonnan segédláncos anyagmozgató berendezés szállítja a munkadarabokat a technológiai sorrendnek megfelelően. A berendezés kádsorból, a felépítményből, valamint a gépészeti egységekből áll), - vízleszárító kemence (a berendezésbe a munkadarabok a konvejoron érkeznek. A vízleszárító alagút fűtése indirekt gázos léghevítő egységgel történik. A hőt légcsatorna oszlatja el egyenletesen a berendezésben), - por beégető kemence (a berendezésbe a munkadarabok a kézi konvejoron érkeznek. A kemence fűtése indirekt gázos léghevítő egységgel történik. A hőt légcsatorna oszlatja el egyenletesen a berendezésben), - kézi anyagmozgató rendszer (a munkadarabokat kézi konvejor pályán szállítja a kezelő személyzet a technológiai helyek között), - segédláncos anyagmozgató berendezés (A berendezés feladata munkadarabok vízszintes alternáló mozgatása az automata vegyi előkezelő kabinban. A segédláncos anyagmozgató a munkagerenda direkt erre a célra ialakított részét megfogva azt előre-hátra mozgatja a technológiaii helynek, és időnek megfelelően. Ezáltal az előkezelő kabinba kevesebb fúvóka szükséges, és a megfelelő mechanikai, és kémiai tisztítási folyamat a munkadarabok egész felületén egységesen megy végbe). Az élhajlító gép beszerzésének egyértelmű indoka a jelenleg ezen a területen található kapacitásszűke. A felületkezelés a meglévő, a vevői elvárások szempontjából elavultnak tekinthető mártó-festő kapacitás bővítését szolgálja, másrészt pedig lehetővé teszi, hogy az új eljárás révén a minimálisan elvárt 480 órás sópermet tesztet is álló termékek kerüljenek értékesítésre. Ez utóbbi szempont a társaság exportpiaci bővülésének egyik kulcstényezője, így meghatározó jelentőségű. Az összesen nettó 98,8 millió forint értékű beszerzés révén a társaság amellett, hogy megnöveli felületkezelő kapacitásait, exportképes, jelentősen magasabb minőségi elvárásoknak is megfelelő termékek előállítására válik képessé, azaz magasabb hozzáadott értékű szolgáltatásokat nyújt ügyfelei számára, ezáltal jelentősen előrelép a termelési értékláncban. (Hungarian)
0 references
In the framework of this project, the company is expanding its surface treatment capacity at its existing site in Borna in order to provide its customers with higher added value services through increased production volume and processing of larger workpieces. The following equipment will be procured under the project: — hydraulic CNC-controlled edge bending — batch-operated chemical pre-treatment equipment (the manual upper-track convejoron of the workpieces placed at the dispatch point arrives at the dispatch position of the equipment from which an auxiliary chain handling device delivers the workpieces according to the order of technology. The equipment consists of a tub line, superstructure and mechanical units), — water drying furnace (the workpieces arrive on the convejoron. The water-drying tunnel is heated by an indirect gas heating unit. Heat is distributed evenly in the duct), — dust burner furnace (the workpieces arrive on the manual convejoron. The furnace is heated by an indirect gas heating unit. Heat is distributed evenly in the duct), — manual material handling system (the workpieces are transported in a manual convejor orbit by the operator staff between the processing sites), — auxiliary chain handling equipment (The purpose of the equipment is to move work pieces horizontally in the automatic chemical pre-treatment cabin. The auxiliary chain handler moves it back and forth according to the technological location and time by grasping the part of the working beam specially designed for this purpose. In this way, less nozzles are required in the pre-treatment cabin and the corresponding mechanical and chemical cleaning process is carried out uniformly throughout the workpieces). The clear reason for the purchase of the front bending machine is the capacity constraints currently present in this area. The surface treatment serves to expand the existing ditto-painting capacity, which can be considered obsolete from the point of view of customer expectations, and, on the other hand, allows the new process to sell products that also have a minimum of 480 hours of salt spray test. The latter aspect is a key factor in the expansion of the company’s export market and is therefore of decisive importance. By purchasing a total net value of HUF 98.8 million, the company will not only increase its surface treatment capacity, but will be able to produce exportable products that meet significantly higher quality requirements, i.e. providing higher value added services to its customers, thereby significantly advancing in the production value chain. (English)
8 February 2022
0 references
Csorna, Győr-Moson-Sopron
0 references
Identifiers
GINOP-1.2.2-15-2015-01395
0 references