Reconstruction of St. Gdyńska (DW 196) from the junction with ul. Baltic to the border of the city. (Q135187): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Ricostruzione di ul. Gdynia (DW 196) dall'incrocio con ul. Dal Baltico al confine con la città. | |||||||||||||||
Property / summary | |||||||||||||||
Oggetto del progetto è la ricostruzione della strada del voivodato n. 196 a Poznań (ul. Gdynia) a distanza da ul. Il Mar Baltico al confine settentrionale della città.La ricostruzione totale del percorso del dr. è di 1,450 km (0+ 428.21 a 1 + 929,58 km), la lunghezza di accesso a ITPOK da 0+ 000 a 0+ 443,60 km, lunghezza del dr. distribuzione n. 1 da 0+ 000 a 0+ 840,38 km, per dr. 30 km, Dr. Spr. n. 3 da 0+ 000 a 0 + 341,21 km, dr. a separatori da 0+ 000 a 0+ 140,86 km L'estensione consiste nel modificare il tratto del dr. dopo l'attuazione del progetto dall'attuale carreggiata singola a due corsie a due corsie di 2 corsie su ciascuna carreggiata. Inoltre, il progetto prevede di costruire 5 strutture di ponte: tunnel T-1 per pedoni e ciclisti sotto l'ul. Tunnel di Gdynia, T-2a e T-2b sotto l'ul. Gdynia sulla strada di distribuzione n. 1 e linea ferroviaria n. 356, tunnel T-3 sotto l'ul. Gdynia durante la strada di distribuzione n. 2, T-4 tunnel per pedoni e ciclisti. Più in generale, il capitolo III.1 dell'SW. La lunghezza totale dei nuovi impianti è di 0,221 km. Il progetto è destinato a: incrocio con m. Chimico, costruzione di strade di accesso. e distribuzione del traffico nella zona del nodo "ul. Gdynia — crocevia. con linea ferroviaria n. 356 "costruzione di strada di accesso a ITPOK, costruzione di baie per autobus, marciapiedi, strade ciclabili e passerelle, dispositivi senza strade (ad esempio barriere protettive, passaggi pedonali senza collisioni, cartelli, baie per autobus, semafori), canale piovoso, dr. illuminazione, canale tecnologico, ricostruzione o protezione di tutte le collisioni con attrezzature straniere, costruzione e ricostruzione di uscite individuali e pubbliche, ricostruzione di attraversamenti ferroviari. Il progetto è attuato in un'unica fase. Nell'ambito dei costi ammissibili, nel progetto si possono distinguere: studio, parte dell'importo per la compensazione per terreni acquistati, lavori di costruzione e materiali e promozione. I costi non ammissibili sono: documentazione proj, parte dell'importo per l'indennizzo per terreni presi in consegna, pagamento da acqua piovana, coordinatore ingegnere e supervisione dell'autore. (Italian) | |||||||||||||||
Property / summary: Oggetto del progetto è la ricostruzione della strada del voivodato n. 196 a Poznań (ul. Gdynia) a distanza da ul. Il Mar Baltico al confine settentrionale della città.La ricostruzione totale del percorso del dr. è di 1,450 km (0+ 428.21 a 1 + 929,58 km), la lunghezza di accesso a ITPOK da 0+ 000 a 0+ 443,60 km, lunghezza del dr. distribuzione n. 1 da 0+ 000 a 0+ 840,38 km, per dr. 30 km, Dr. Spr. n. 3 da 0+ 000 a 0 + 341,21 km, dr. a separatori da 0+ 000 a 0+ 140,86 km L'estensione consiste nel modificare il tratto del dr. dopo l'attuazione del progetto dall'attuale carreggiata singola a due corsie a due corsie di 2 corsie su ciascuna carreggiata. Inoltre, il progetto prevede di costruire 5 strutture di ponte: tunnel T-1 per pedoni e ciclisti sotto l'ul. Tunnel di Gdynia, T-2a e T-2b sotto l'ul. Gdynia sulla strada di distribuzione n. 1 e linea ferroviaria n. 356, tunnel T-3 sotto l'ul. Gdynia durante la strada di distribuzione n. 2, T-4 tunnel per pedoni e ciclisti. Più in generale, il capitolo III.1 dell'SW. La lunghezza totale dei nuovi impianti è di 0,221 km. Il progetto è destinato a: incrocio con m. Chimico, costruzione di strade di accesso. e distribuzione del traffico nella zona del nodo "ul. Gdynia — crocevia. con linea ferroviaria n. 356 "costruzione di strada di accesso a ITPOK, costruzione di baie per autobus, marciapiedi, strade ciclabili e passerelle, dispositivi senza strade (ad esempio barriere protettive, passaggi pedonali senza collisioni, cartelli, baie per autobus, semafori), canale piovoso, dr. illuminazione, canale tecnologico, ricostruzione o protezione di tutte le collisioni con attrezzature straniere, costruzione e ricostruzione di uscite individuali e pubbliche, ricostruzione di attraversamenti ferroviari. Il progetto è attuato in un'unica fase. Nell'ambito dei costi ammissibili, nel progetto si possono distinguere: studio, parte dell'importo per la compensazione per terreni acquistati, lavori di costruzione e materiali e promozione. I costi non ammissibili sono: documentazione proj, parte dell'importo per l'indennizzo per terreni presi in consegna, pagamento da acqua piovana, coordinatore ingegnere e supervisione dell'autore. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Oggetto del progetto è la ricostruzione della strada del voivodato n. 196 a Poznań (ul. Gdynia) a distanza da ul. Il Mar Baltico al confine settentrionale della città.La ricostruzione totale del percorso del dr. è di 1,450 km (0+ 428.21 a 1 + 929,58 km), la lunghezza di accesso a ITPOK da 0+ 000 a 0+ 443,60 km, lunghezza del dr. distribuzione n. 1 da 0+ 000 a 0+ 840,38 km, per dr. 30 km, Dr. Spr. n. 3 da 0+ 000 a 0 + 341,21 km, dr. a separatori da 0+ 000 a 0+ 140,86 km L'estensione consiste nel modificare il tratto del dr. dopo l'attuazione del progetto dall'attuale carreggiata singola a due corsie a due corsie di 2 corsie su ciascuna carreggiata. Inoltre, il progetto prevede di costruire 5 strutture di ponte: tunnel T-1 per pedoni e ciclisti sotto l'ul. Tunnel di Gdynia, T-2a e T-2b sotto l'ul. Gdynia sulla strada di distribuzione n. 1 e linea ferroviaria n. 356, tunnel T-3 sotto l'ul. Gdynia durante la strada di distribuzione n. 2, T-4 tunnel per pedoni e ciclisti. Più in generale, il capitolo III.1 dell'SW. La lunghezza totale dei nuovi impianti è di 0,221 km. Il progetto è destinato a: incrocio con m. Chimico, costruzione di strade di accesso. e distribuzione del traffico nella zona del nodo "ul. Gdynia — crocevia. con linea ferroviaria n. 356 "costruzione di strada di accesso a ITPOK, costruzione di baie per autobus, marciapiedi, strade ciclabili e passerelle, dispositivi senza strade (ad esempio barriere protettive, passaggi pedonali senza collisioni, cartelli, baie per autobus, semafori), canale piovoso, dr. illuminazione, canale tecnologico, ricostruzione o protezione di tutte le collisioni con attrezzature straniere, costruzione e ricostruzione di uscite individuali e pubbliche, ricostruzione di attraversamenti ferroviari. Il progetto è attuato in un'unica fase. Nell'ambito dei costi ammissibili, nel progetto si possono distinguere: studio, parte dell'importo per la compensazione per terreni acquistati, lavori di costruzione e materiali e promozione. I costi non ammissibili sono: documentazione proj, parte dell'importo per l'indennizzo per terreni presi in consegna, pagamento da acqua piovana, coordinatore ingegnere e supervisione dell'autore. (Italian) / qualifier | |||||||||||||||
point in time: 15 January 2022
|
Revision as of 15:31, 15 January 2022
Project Q135187 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of St. Gdyńska (DW 196) from the junction with ul. Baltic to the border of the city. |
Project Q135187 in Poland |
Statements
39,695,289.62 zloty
0 references
57,646,368.9 zloty
0 references
68.86 percent
0 references
1 January 2014
0 references
30 November 2018
0 references
GMINA MIASTO POZNAŃ
0 references
Przedmiotem projektu jest przebudowa drogi woj. nr 196 w Poznaniu (ul. Gdyńska) na odc. do ul. Bałtyckiej do północnej granicy miasta.Łączna dł. przebud. ciągu dr. wynosi 1,450km (0+428,21 do 1+929,58 km),dł. dr.dojazdowej do ITPOK od 0+000 do 0+443,60 km, dł. dr. rozprowadzającej nr 1 od 0+000 do 0+840,38 km,dł dr. rozpr. nr 2 od 0+000 do 0+384,30 km, dł. dr. rozpr. nr 3 od 0+000 do 0+341,21 km,dr. do separatorów od 0+000 do 0+140,86 km Rozbudowa polega na zmianie przekroju dr. po realizacji projektu z obecnego jednojezdniowego dwupasowego na dwujezdniowy po 2 pasy na każdej jezdni. Dodatkowo w ramach projektu planuje się budowę 5 obiektów mostowych: tunel T-1 dla pieszych i rowerzystów pod ul. Gdyńską, tunele T-2a i T-2b pod ul. Gdyńską w ciągu drogi rozprowadzającej nr 1 oraz linii kolejowej nr 356, tunel T-3 pod ul. Gdyńska w ciągu drogi rozprowadzającej nr 2, tunel T-4 dla pieszych i rowerzystów. Szerzej rozdz III.1 SW.Łączna długość nowych obiektów inż. wynosi 0,221 km.W ramach projektu planuje się: rozb. skrzyżowania z ul. Chemiczną, bud. dróg dojazd. oraz rozprowadzających ruch w rejonie węzła "ul. Gdyńska-skrzyż. z linią kolejową nr 356"budowę drogi dojazdowej do ITPOK, budowę zatok autobusowych, chodników, dróg rowerowych i ciągów pieszorower., urządzeń bezp. ruchu drogowego (np. bariery ochronne, bezkolizyjne przejścia dla pieszych, oznakowanie, zatoki autobusowe, sygnalizacja świetlna), kan. deszczowej, oświetlenia dr., kanału technologicznego, przebudowę lub zabezpieczenie wszystkich kolizji z urządzeniami obcymi, budowę i przebudowę zjazdów indywidualnych i publicznych, przebudowę przejazdów kolejowych. Projekt realizowany jest jednoetapowo. W ramach kosztów kwalifik. w projekcie można wyróżnić: studium wyk, część kwoty za odszkodowania za pozyskane grunty, roboty bud. i materiały oraz promocję. Koszty niekwalifik. to: dokumentacja proj, część kwoty za odszkodowania za przejęte grunty, vat od kan. deszczowej, inżynier koordynator oraz nadzór autorski. (Polish)
0 references
The subject of the project is the reconstruction of Voivodeship No. 196 in Poznań (ul. Gdyńska) at odc. to ul. The total extension of the dr. length is 1.450 km (0 + 428.21 to 1 + 929.58 km), dr. access to ITPOK from 0 + 000 to 0 + 443.60 km, length of Dr. distributing No 1 from 0 + 000 to 0 + 840,38 km, dr. dr. In addition, the project plans to build 5 bridge structures: tunnel T-1 for pedestrians and cyclists under ul. Gdyńska, tunnels T-2a and T-2b under ul. Gdyńska along the route no. 1 and railway line No 356, tunnel T-3 under ul. Gdynia along the route no. 2, tunnel T-4 for pedestrians and cyclists. Wider section III.1 SW.The total length of new facilities inż. is 0.221 km. open intersection with ul. Chemical, road building access. and traffic distribution in the area of the node "ul. Gdyńska-cross. with railway line no. 356" construction of the access road to ITPOK, construction of bus bays, sidewalks, bicycle roads and walkways., road-free devices (e.g. protection barriers, cross-road crossings, markings, bus bays, traffic signalling), rainwater canal, dr. lighting, technological channel, reconstruction or security of all collisions with public equipment, construction of individual and foreign equipment The project is implemented in one step. Within the eligibility costs, the project can distinguish: study wy, part of the amount for compensation for land acquired, construction works and materials and promotion. Ineligible costs are: project documentation, part of the compensation for the land seized, vat from the rain canal, engineer coordinator and author supervision. (English)
21 October 2020
0 references
L’objet du projet est la reconstruction de la route voïvodie no 196 à Poznań (ul. Gdynia) à une distance de ul. La mer Baltique jusqu’à la frontière nord de la ville.La reconstruction totale de la route du Dr. est de 1,450 km (0+ 428,21 à 1 + 929,58 km), la longueur d’accès à l’ITPOK de 0+ 000 à 0+ 443,60 km, la longueur de la dr. distribuant no 1 de 0+ 000 à 0+ 840,38 km, pour le dr. 30 km, le Dr Spr. no 3 de 0+ 000 à 0 + 341,21 km, dr. aux séparateurs de 0+ 000 à 0+ 140,86 km L’extension consiste à changer le tronçon de dr. après la mise en œuvre du projet, de l’actuelle chaussée à deux voies à deux voies de 2 voies sur chaque route. De plus, le projet prévoit de construire cinq ouvrages de pont: tunnel T-1 pour piétons et cyclistes sous ul. Tunnels Gdynia, T-2a et T-2b sous ul. Gdynia sur la route de distribution no 1 et la ligne de chemin de fer no 356, tunnel T-3 sous ul. Gdynia pendant la route de distribution no 2, tunnel T-4 pour piétons et cyclistes. Plus généralement, le chapitre III.1 du SW. La longueur totale des nouvelles installations est de 0,221 km. Le projet devrait: intersection avec St. Chimique, construction de routes d’accès. et la distribution du trafic dans la zone du nœud "ul. Gdynia — carrefour. avec la ligne de chemin de fer no 356 "construction d’une route d’accès à l’ITPOK, construction de baies d’autobus, de trottoirs, de routes cyclables et de passerelles, dispositifs sans route (par exemple barrières de protection, passages pour piétons sans collision, panneaux de signalisation, baies d’autobus, feux de circulation), canal de pluie, éclairage de la dr., canal technologique, reconstruction ou protection de toutes les collisions avec des équipements étrangers, construction et reconstruction de sorties individuelles et publiques, reconstruction de passages à niveau. Le projet est mis en œuvre en une seule étape. Dans le cadre des coûts éligibles, les éléments suivants peuvent être distingués dans le projet: étude, partie du montant de l’indemnisation pour les terrains acquis, les travaux de construction et les matériaux et la promotion. Les coûts inéligibles sont les suivants: documentation proj, une partie du montant de l’indemnisation pour la prise en charge des terres, paiement par l’eau de pluie, coordonnateur de l’ingénieur et la supervision de l’auteur. (French)
2 December 2021
0 references
Gegenstand des Projekts ist der Wiederaufbau der Woiwodschaftsstraße Nr. 196 in Posen (ul. Gdynia) in einer Entfernung von ul. Die Ostsee bis zur nördlichen Grenze der Stadt.Die Gesamtrekonstruktion der Dr.-Route beträgt 1,450 km (0+ 428.21 bis 1 + 929,58 km),die Länge des Zugangs zu ITPOK von 0+ 000 bis 0+ 443,60 km, Länge dr. Verteilung Nr. 1 von 0+ 000 auf 0+ 840,38 km,für Dr. 30 km, Dr. Spr. Nr. 3 von 0+ 000 bis 0 + 341,21 km, Dr. zu Separatoren von 0+ 000 auf 0+ 140,86 km Die Erweiterung besteht in der Änderung des Abschnitts von dr. nach der Durchführung des Projekts von der aktuellen zweispurigen Einzelbahn auf zwei Fahrspuren mit 2 Fahrspuren auf jeder Fahrbahn. Darüber hinaus plant das Projekt, 5 Brückenbauten zu bauen: Tunnel T-1 für Fußgänger und Radfahrer unter ul. Gdynia, T-2a und T-2b Tunnel unter ul. Gdynia auf der Verteilerstraße Nr. 1 und Eisenbahnlinie Nr. 356, Tunnel T-3 unter ul. Gdynia während der Verteilungsstraße Nr. 2, T-4 Tunnel für Fußgänger und Radfahrer. Allgemeiner, Kapitel III.1 SW. Die Gesamtlänge der neuen Anlagen beträgt 0,221 km.Das Projekt soll Schnittpunkt mit st. Chemie, Bau von Zufahrtsstraßen. und Verteilung des Verkehrs im Bereich des Knotens "ul. Gdynia – Kreuzung. mit Bahnlinie Nr. 356 "Bau der Zufahrtsstraße nach ITPOK, Bau von Busbuchten, Straßen, Fahrradstraßen und Fußgängerbrücken, straßenlose Geräte (z. B. Schutzbarrieren, kollisionsfreie Fußgängerübergänge, Wegweiser, Busbuchten, Ampeln), Regenkanal, Dr. Beleuchtung, technologischer Kanal, Wiederaufbau oder Schutz aller Kollisionen mit ausländischer Ausrüstung, Bau und Rekonstruktion von Einzel- und öffentlichen Ausfahrten, Wiederaufbau von Eisenbahnübergängen. Das Projekt wird in einem Schritt umgesetzt. Im Rahmen der förderfähigen Kosten lassen sich im Projekt Folgendes unterscheiden: Studie, Teil des Ausgleichsbetrags für erworbene Grundstücke, Bauarbeiten und Materialien und Förderung. Nicht förderfähige Kosten sind: Proj Dokumentation, Teil des Betrags für die Entschädigung für übernommenes Land, Zahlung aus Regenwasser, Ingenieurkoordinator und Aufsicht des Autors. (German)
13 December 2021
0 references
Het doel van het project is de wederopbouw van de woiwodschapsweg nr. 196 in Poznań (ul. Gdynia) op een afstand tot ul. De Oostzee naar de noordelijke grens van de stad.De totale wederopbouw van de dr. route bedraagt 1,450 km (0+ 428,21 tot 1 + 929,58 km), de lengte van de toegang tot ITPOK van 0+ 000 tot 0+ 443,60 km, lengte van dr. verdelen nr. 1 van 0+ 000 tot 0+ 840,38 km,voor dr. 30 km, Dr. Spr. nr. 3 van 0+ 000 tot 0 + 341,21 km, Dr. naar scheidingstekens van 0+ 000 tot 0+ 140,86 km De uitbreiding bestaat uit het veranderen van het gedeelte van dr. na de uitvoering van het project van de huidige tweebaans enkele rijbaan naar twee rijstroken van 2 rijstroken op elke weg. Daarnaast is het project van plan om 5 brugstructuren te bouwen: tunnel T-1 voor voetgangers en fietsers onder ul. Gdynia, T-2a en T-2b tunnels onder ul. Gdynia op de distributieweg nr. 1 en spoorlijn nr. 356, tunnel T-3 onder ul. Gdynia tijdens de distributieweg nr. 2, T-4 tunnel voor voetgangers en fietsers. Meer in het algemeen, hoofdstuk III.1 van het SW. De totale lengte van de nieuwe installaties is 0,221 km. Het project is gepland om: kruising met st. Chemische, aanleg van toegangswegen. en het verdelen van verkeer in het gebied van het knooppunt "ul. Gdynia — kruispunt. met spoorlijn nr. 356 "bouw van toegangsweg naar ITPOK, bouw van bus baaien, trottoirs, fietswegen en voetgangersbruggen, wegloze voorzieningen (bijv. beschermende barrières, botsingsvrije voetgangersovergangen, bewegwijzeringen, bus baaien, verkeerslichten), regenkanaal, dr. verlichting, technologische kanaal, reconstructie of bescherming van alle botsingen met buitenlandse apparatuur, bouw en wederopbouw van individuele en openbare uitgangen, wederopbouw van spoorwegovergangen. Het project wordt in één stap uitgevoerd. Als onderdeel van de subsidiabele kosten kan in het project het volgende worden onderscheiden: studie, deel van het bedrag van de vergoeding voor verworven grond, bouwwerken en materialen en promotie. Niet-subsidiabele kosten zijn: proj documentatie, deel van het bedrag van de vergoeding voor overgenomen grond, betaling van regenwater, ingenieur coördinator en auteurstoezicht. (Dutch)
17 December 2021
0 references
Oggetto del progetto è la ricostruzione della strada del voivodato n. 196 a Poznań (ul. Gdynia) a distanza da ul. Il Mar Baltico al confine settentrionale della città.La ricostruzione totale del percorso del dr. è di 1,450 km (0+ 428.21 a 1 + 929,58 km), la lunghezza di accesso a ITPOK da 0+ 000 a 0+ 443,60 km, lunghezza del dr. distribuzione n. 1 da 0+ 000 a 0+ 840,38 km, per dr. 30 km, Dr. Spr. n. 3 da 0+ 000 a 0 + 341,21 km, dr. a separatori da 0+ 000 a 0+ 140,86 km L'estensione consiste nel modificare il tratto del dr. dopo l'attuazione del progetto dall'attuale carreggiata singola a due corsie a due corsie di 2 corsie su ciascuna carreggiata. Inoltre, il progetto prevede di costruire 5 strutture di ponte: tunnel T-1 per pedoni e ciclisti sotto l'ul. Tunnel di Gdynia, T-2a e T-2b sotto l'ul. Gdynia sulla strada di distribuzione n. 1 e linea ferroviaria n. 356, tunnel T-3 sotto l'ul. Gdynia durante la strada di distribuzione n. 2, T-4 tunnel per pedoni e ciclisti. Più in generale, il capitolo III.1 dell'SW. La lunghezza totale dei nuovi impianti è di 0,221 km. Il progetto è destinato a: incrocio con m. Chimico, costruzione di strade di accesso. e distribuzione del traffico nella zona del nodo "ul. Gdynia — crocevia. con linea ferroviaria n. 356 "costruzione di strada di accesso a ITPOK, costruzione di baie per autobus, marciapiedi, strade ciclabili e passerelle, dispositivi senza strade (ad esempio barriere protettive, passaggi pedonali senza collisioni, cartelli, baie per autobus, semafori), canale piovoso, dr. illuminazione, canale tecnologico, ricostruzione o protezione di tutte le collisioni con attrezzature straniere, costruzione e ricostruzione di uscite individuali e pubbliche, ricostruzione di attraversamenti ferroviari. Il progetto è attuato in un'unica fase. Nell'ambito dei costi ammissibili, nel progetto si possono distinguere: studio, parte dell'importo per la compensazione per terreni acquistati, lavori di costruzione e materiali e promozione. I costi non ammissibili sono: documentazione proj, parte dell'importo per l'indennizzo per terreni presi in consegna, pagamento da acqua piovana, coordinatore ingegnere e supervisione dell'autore. (Italian)
15 January 2022
0 references
Identifiers
RPWP.05.01.03-30-0001/16
0 references