COMPLETION OF INFRASTRUCTURE WORKS AIMED AT THE CONSERVATION, EXPLOITATION AND ENJOYMENT OF THE GREEN CAVE (Q2051614): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
VOLTOOIING VAN INFRASTRUCTURELE WERKEN GERICHT OP HET BEHOUD, DE VERBETERING EN HET GEBRUIK VAN DE GROENE GROT | |||||||||||||||
Property / summary | |||||||||||||||
1.COMPLETATIE EN RESTAURATIE VAN HET EERSTE ONTVANGSTCENTRUM 2.FEDEST TOEGANGSPAD GRENZEND AAN DE PROVINCIALE WEG 3.CONSOLIDATION VAN DE KLIF BOVEN HET TOEGANGSPAD 4.CONSOLIDAMENTS IN DE GROT 5.RESTORATION VAN DE BESTAANDE EXTERNE TOEGANGSTRAP 6.REALISATION NIEUWE LOOPPADEN IN HET PAD BINNEN DE GROT 7.REALISATION VAN VERLICHTINGSSYSTEEM TOEGANGSPAD 8.REALISATION VAN HET INTERNE VERLICHTINGSSYSTEEM VAN DE GROT 9.CARTELLONISTIC BASIS IN UITGERUSTE RUIMTEN 10.SISTEM MONITORING VAN CHEMISCHE EN FYSISCHE PARAMETERS 11.MONITORAGE VAN DE STABILITEIT VAN DE KLIF EN GROT 12.SCAVI ARCHEOLOGISCHE BASIS (Dutch) | |||||||||||||||
Property / summary: 1.COMPLETATIE EN RESTAURATIE VAN HET EERSTE ONTVANGSTCENTRUM 2.FEDEST TOEGANGSPAD GRENZEND AAN DE PROVINCIALE WEG 3.CONSOLIDATION VAN DE KLIF BOVEN HET TOEGANGSPAD 4.CONSOLIDAMENTS IN DE GROT 5.RESTORATION VAN DE BESTAANDE EXTERNE TOEGANGSTRAP 6.REALISATION NIEUWE LOOPPADEN IN HET PAD BINNEN DE GROT 7.REALISATION VAN VERLICHTINGSSYSTEEM TOEGANGSPAD 8.REALISATION VAN HET INTERNE VERLICHTINGSSYSTEEM VAN DE GROT 9.CARTELLONISTIC BASIS IN UITGERUSTE RUIMTEN 10.SISTEM MONITORING VAN CHEMISCHE EN FYSISCHE PARAMETERS 11.MONITORAGE VAN DE STABILITEIT VAN DE KLIF EN GROT 12.SCAVI ARCHEOLOGISCHE BASIS (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: 1.COMPLETATIE EN RESTAURATIE VAN HET EERSTE ONTVANGSTCENTRUM 2.FEDEST TOEGANGSPAD GRENZEND AAN DE PROVINCIALE WEG 3.CONSOLIDATION VAN DE KLIF BOVEN HET TOEGANGSPAD 4.CONSOLIDAMENTS IN DE GROT 5.RESTORATION VAN DE BESTAANDE EXTERNE TOEGANGSTRAP 6.REALISATION NIEUWE LOOPPADEN IN HET PAD BINNEN DE GROT 7.REALISATION VAN VERLICHTINGSSYSTEEM TOEGANGSPAD 8.REALISATION VAN HET INTERNE VERLICHTINGSSYSTEEM VAN DE GROT 9.CARTELLONISTIC BASIS IN UITGERUSTE RUIMTEN 10.SISTEM MONITORING VAN CHEMISCHE EN FYSISCHE PARAMETERS 11.MONITORAGE VAN DE STABILITEIT VAN DE KLIF EN GROT 12.SCAVI ARCHEOLOGISCHE BASIS (Dutch) / qualifier | |||||||||||||||
point in time: 23 December 2021
|
Revision as of 17:07, 23 December 2021
Project Q2051614 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | COMPLETION OF INFRASTRUCTURE WORKS AIMED AT THE CONSERVATION, EXPLOITATION AND ENJOYMENT OF THE GREEN CAVE |
Project Q2051614 in Italy |
Statements
425,000.0 Euro
0 references
850,000.0 Euro
0 references
50.0 percent
0 references
2 September 2017
0 references
31 December 2019
0 references
COMUNE DI ALGHERO
0 references
1.COMPLETAMENTO E RIPRISTINO CENTRO DI PRIMA ACCOGLIENZA 2.PISTA PEDONALE DI ACCESSO ADIACENTE ALLA STRADA PROVINCIALE 3.CONSOLIDAMENTO DELLA FALESIA SOVRASTANTE IL PERCORSO DI ACCESSO 4.CONSOLIDAMENTI ALL¿INTERNO DELLA GROTTA 5.RIPRISTINO DELLA ESISTENTE SCALINATA DI ACCESSO ESTERNA 6.REALIZZAZIONE NUOVI CAMMINAMENTI NEL PERCORSO INTERNO ALLA GROTTA 7.REALIZZAZIONE SISTEMA DI ILLUMINAZIONE PERCORSO DI ACCESSO 8.REALIZZAZIONE SISTEMA DI ILLUMINAZIONE INTERNO DELLA GROTTA 9.CARTELLONISTICA DI BASE IN SPAZI ATTREZZATI 10.SISTEMA DI MONITORAGGIO DEI PARAMETRI CHIMICI E FISICI 11.MONITORAGGIO DELLA STABILITà DELLA FALESIA E DELLA GROTTA 12.SCAVI ARCHEOLOGICI (Italian)
0 references
1.COMPLETING AND RE-ESTABLISHMENT OF FIRST RECEPTION CENTRE 2.PIDATE, ADJACENT TO THE PROVINCIAL ROAD 3.CONSOLIDATE, OF THE AREA OVER THE ACCESS PATH 4.CONSOLIDENUTION WITHIN THE CAVE 5.RIPRIMISINE OF THE EXISTING EXTERNAL ACCESS PATH 6.RESALYATION, NEW WALKWAYS IN THE INNER TRACK OF THE CAVE 7.PERFORMANCE OF THE LIGHTING SYSTEM OF ACCESS 8.RESALISATION SYSTEM FOR THE INTERNAL LIGHTING OF THE CAVE 9.CARTETLLONISTICA BASED IN 10.MONITORING OF THE CHEMICAL AND PHYSICAL PARAMETERS OF THE 11.MONITORING SYSTEM FOR THE DETERMINATION OF THE CHEMICAL AND PHYSICAL PARAMETERS OF THE 12.MONITORING ESTABLISHMENT.MONITORING) (English)
0 references
1.COMPLÉTATION ET RESTAURATION DU PREMIER CENTRE D’ACCUEIL 2.FEDEST CHEMIN D’ACCÈS ADJACENT À LA ROUTE PROVINCIALE 3.CONSOLIDATION DE LA FALAISE AU-DESSUS DU CHEMIN D’ACCÈS 4.CONSOLIDAMENTS À L’INTÉRIEUR DE LA GROTTE 5.RESTORATION DE L’ESCALIER D’ACCÈS EXTERNE EXISTANT 6.REALISATION DE NOUVELLES PASSERELLES DANS LE CHEMIN À L’INTÉRIEUR DE LA GROTTE 7.REALISATION DU SYSTÈME D’ÉCLAIRAGE DU SYSTÈME D’ÉCLAIRAGE 8.REALISATION DU SYSTÈME D’ÉCLAIRAGE INTERNE DE LA GROTTE 9.BASE CARTELLONISTIQUE DANS LES ESPACES ÉQUIPÉS 10.SISTEM SURVEILLANCE DES PARAMÈTRES CHIMIQUES ET PHYSIQUES 11.MONITORAGE DE LA STABILITÉ DE LA FALAISE ET DE LA CAVERNE 12.SCAVI ARCHÉOLOGIQUE (French)
16 December 2021
0 references
1.COMPLETATIE EN RESTAURATIE VAN HET EERSTE ONTVANGSTCENTRUM 2.FEDEST TOEGANGSPAD GRENZEND AAN DE PROVINCIALE WEG 3.CONSOLIDATION VAN DE KLIF BOVEN HET TOEGANGSPAD 4.CONSOLIDAMENTS IN DE GROT 5.RESTORATION VAN DE BESTAANDE EXTERNE TOEGANGSTRAP 6.REALISATION NIEUWE LOOPPADEN IN HET PAD BINNEN DE GROT 7.REALISATION VAN VERLICHTINGSSYSTEEM TOEGANGSPAD 8.REALISATION VAN HET INTERNE VERLICHTINGSSYSTEEM VAN DE GROT 9.CARTELLONISTIC BASIS IN UITGERUSTE RUIMTEN 10.SISTEM MONITORING VAN CHEMISCHE EN FYSISCHE PARAMETERS 11.MONITORAGE VAN DE STABILITEIT VAN DE KLIF EN GROT 12.SCAVI ARCHEOLOGISCHE BASIS (Dutch)
23 December 2021
0 references
Identifiers
G16J17000470008
0 references