Chancellery/Pedrógão Sanitation Subsystem (Q2982013): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Kanzleramt/Pedrógão Sanitation Subsystem | |||||||||||||||
Property / summary | |||||||||||||||
Dieser Betrieb sieht den Bau eines WWTP und seiner Infrastruktur vor, die an bestehende und unbehandelte Netze im Teilsystem anschließt, sowie den Bau/Erweiterung von Netzen, um die Abdeckung zu erhöhen, eine angemessene Behandlung der gesammelten Abwässer sicherzustellen und zur Verbesserung der Qualität der Wasserkörper beizutragen. (German) | |||||||||||||||
Property / summary: Dieser Betrieb sieht den Bau eines WWTP und seiner Infrastruktur vor, die an bestehende und unbehandelte Netze im Teilsystem anschließt, sowie den Bau/Erweiterung von Netzen, um die Abdeckung zu erhöhen, eine angemessene Behandlung der gesammelten Abwässer sicherzustellen und zur Verbesserung der Qualität der Wasserkörper beizutragen. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Dieser Betrieb sieht den Bau eines WWTP und seiner Infrastruktur vor, die an bestehende und unbehandelte Netze im Teilsystem anschließt, sowie den Bau/Erweiterung von Netzen, um die Abdeckung zu erhöhen, eine angemessene Behandlung der gesammelten Abwässer sicherzustellen und zur Verbesserung der Qualität der Wasserkörper beizutragen. (German) / qualifier | |||||||||||||||
point in time: 15 December 2021
|
Revision as of 20:05, 15 December 2021
Project Q2982013 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Chancellery/Pedrógão Sanitation Subsystem |
Project Q2982013 in Portugal |
Statements
3,625,539.0 Euro
0 references
4,265,340.0 Euro
0 references
85.0 percent
0 references
1 January 2016
0 references
31 December 2021
0 references
AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
0 references
A presente operação prevê a construção de uma ETAR e respetivas infraestruturas de ligação com as redes já existentes e sem tratamento no subsistema, assim como a construção/ampliação de redes para aumentar a cobertura, garantindo um adequado tratamento dos efluentes recolhidos e contribuindo para a melhoria da qualidade das massas de água. (Portuguese)
0 references
This operation envisages the construction of a sewage treatment plant and its infrastructure to connect with existing and untreated networks in the subsystem, as well as the construction/enlargement of networks to increase coverage, ensuring adequate treatment of the effluents collected and contributing to improving the quality of water bodies. (English)
9 July 2021
0 references
Cette opération prévoit la construction d’une station d’épuration des eaux usées et de son infrastructure reliant les réseaux existants et non traités dans le sous-système, ainsi que la construction/l’expansion des réseaux afin d’accroître la couverture, d’assurer un traitement adéquat des effluents collectés et de contribuer à l’amélioration de la qualité des masses d’eau. (French)
7 December 2021
0 references
Dieser Betrieb sieht den Bau eines WWTP und seiner Infrastruktur vor, die an bestehende und unbehandelte Netze im Teilsystem anschließt, sowie den Bau/Erweiterung von Netzen, um die Abdeckung zu erhöhen, eine angemessene Behandlung der gesammelten Abwässer sicherzustellen und zur Verbesserung der Qualität der Wasserkörper beizutragen. (German)
15 December 2021
0 references
Torres Novas
0 references
Identifiers
POSEUR-03-2012-FC-000034
0 references