Removal of Fibrocement in School Buildings — Basic School of Ceira (Q3357341): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The replacement of roof tiles and replacement of the cafeteria extractors, air conditioners and external tubing of ventilation systems. The roofs of this school’s buildings drain to internal shutters, draining to iron drop pipes that in some situations are embedded and in their entirety obstructed, among other works., translated_summary)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Enlèvement du fibrociment dans les bâtiments scolaires — École de base de Ceira
Property / summary
 
Le remplacement des tuiles de toiture et le remplacement des extracteurs de cafétéria, des climatiseurs et des tubes extérieurs des systèmes de ventilation. Les toits des bâtiments de cette école s’écoulent vers des volets internes, drainant vers des tuyaux de chute de fer qui, dans certaines situations, sont encastrés et dans leur intégralité obstrués, entre autres travaux. (French)
Property / summary: Le remplacement des tuiles de toiture et le remplacement des extracteurs de cafétéria, des climatiseurs et des tubes extérieurs des systèmes de ventilation. Les toits des bâtiments de cette école s’écoulent vers des volets internes, drainant vers des tuyaux de chute de fer qui, dans certaines situations, sont encastrés et dans leur intégralité obstrués, entre autres travaux. (French) / rank
 
Normal rank
Property / summary: Le remplacement des tuiles de toiture et le remplacement des extracteurs de cafétéria, des climatiseurs et des tubes extérieurs des systèmes de ventilation. Les toits des bâtiments de cette école s’écoulent vers des volets internes, drainant vers des tuyaux de chute de fer qui, dans certaines situations, sont encastrés et dans leur intégralité obstrués, entre autres travaux. (French) / qualifier
 
point in time: 7 December 2021
Timestamp+2021-12-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:30, 7 December 2021

Project Q3357341 in Portugal
Language Label Description Also known as
English
Removal of Fibrocement in School Buildings — Basic School of Ceira
Project Q3357341 in Portugal

    Statements

    0 references
    136,165.0 Euro
    0 references
    136,165.0 Euro
    0 references
    100.0 percent
    0 references
    17 December 2020
    0 references
    31 July 2021
    0 references
    MUNICÍPIO DE COIMBRA
    0 references
    A substituição das telhas da cobertura e substituição dos extratores do refeitório, de aparelhos de ar condicionado e de tubagem exterior de sistemas de ventilação. As coberturas dos edifícios desta escola drenam para caleiras interiores que, escoam para tubos de queda em ferro que em algumas situações se encontram embutidos e na sua totalidade obstruídos, entre outros trabalhos. (Portuguese)
    0 references
    The replacement of roof tiles and replacement of the cafeteria extractors, air conditioners and external tubing of ventilation systems. The roofs of this school’s buildings drain to internal shutters, draining to iron drop pipes that in some situations are embedded and in their entirety obstructed, among other works. (English)
    29 November 2021
    0 references
    Le remplacement des tuiles de toiture et le remplacement des extracteurs de cafétéria, des climatiseurs et des tubes extérieurs des systèmes de ventilation. Les toits des bâtiments de cette école s’écoulent vers des volets internes, drainant vers des tuyaux de chute de fer qui, dans certaines situations, sont encastrés et dans leur intégralité obstrués, entre autres travaux. (French)
    7 December 2021
    0 references
    Coimbra, Região de Coimbra, Centro
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000247
    0 references