Energy-efficient plants for electricity, heating and cooling (Q3319128): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Installations économes en énergie pour la production d’électricité, de chauffage et de refroidissement | |||||||||||||||
Property / summary | |||||||||||||||
Installation et exploitation d’une cogénération «RMB-BHKW neoTower 30.0» d’une puissance électrique de 30 kW et d’une chaudière à gaz (appareil à condensation de 120 kW)Installation d’une mémoire tampon supplémentaire (French) | |||||||||||||||
Property / summary: Installation et exploitation d’une cogénération «RMB-BHKW neoTower 30.0» d’une puissance électrique de 30 kW et d’une chaudière à gaz (appareil à condensation de 120 kW)Installation d’une mémoire tampon supplémentaire (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Installation et exploitation d’une cogénération «RMB-BHKW neoTower 30.0» d’une puissance électrique de 30 kW et d’une chaudière à gaz (appareil à condensation de 120 kW)Installation d’une mémoire tampon supplémentaire (French) / qualifier | |||||||||||||||
point in time: 6 December 2021
|
Revision as of 17:29, 6 December 2021
Project Q3319128 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy-efficient plants for electricity, heating and cooling |
Project Q3319128 in Germany |
Statements
29,974.63 Euro
0 references
37,468.29 Euro
0 references
80.0 percent
0 references
6 January 2017
0 references
28 February 2018
0 references
Hotel Blauer Engel GmbH
0 references
Installation und Betreibung eines BHKW "RMB-BHKW neoTower 30.0" mit einer elektrischen Leistung von 30 kW sowie eines Gaskessel (Brennwertgerät mit 120 kW)Installation eines zusätzlichen Pufferspeichers (German)
0 references
Installation and operation of a CHP “RMB-CHP neoTower 30.0” with an electrical output of 30 kW and a gas boiler (combustion unit with 120 kW)Installation of an additional buffer tank (English)
25 October 2021
0 references
Installation et exploitation d’une cogénération «RMB-BHKW neoTower 30.0» d’une puissance électrique de 30 kW et d’une chaudière à gaz (appareil à condensation de 120 kW)Installation d’une mémoire tampon supplémentaire (French)
6 December 2021
0 references
Aue-Bad Schlema, Stadt
0 references
Identifiers
672 / 101003238201
0 references