Improving the energy efficiency of public utility buildings of the Cieszyn County (Q123971): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Le projet a pour objet des activités d’investissement dans le domaine de la thermomodernisation dans 4 établissements (un total de 7 bâtiments) d’utilité publique, c’est-à-dire: CKPiZ à Bażanowice (3 bâtiments), A. Osuchowski I LO à Cieszyn, II Kopernik LO (2 bâtiments) et Gen. Construction School Complex Sr. Grota Rowecki à Cieszyn, visant à améliorer l’énergie de ces bâtiments et la qualité de l’air dans la région. La portée de l’investissemen...)
(‎Removed claim: contained in NUTS (P1845): Bielski (Q2577111), Removing duplicate contained in NUTS)
Property / contained in NUTS
 
Property / contained in NUTS: Bielski / rank
Normal rank
 

Revision as of 19:30, 3 December 2021

Project Q123971 in Poland
Language Label Description Also known as
English
Improving the energy efficiency of public utility buildings of the Cieszyn County
Project Q123971 in Poland

    Statements

    0 references
    0 references
    6,345,533.99 zloty
    0 references
    1,522,928.16 Euro
    13 January 2020
    0 references
    7,465,334.11 zloty
    0 references
    1,791,680.19 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 April 2017
    0 references
    30 November 2019
    0 references
    POWIAT CIESZYŃSKI
    0 references

    49°45'20.5"N, 18°39'22.3"E
    0 references

    49°44'1.3"N, 18°44'24.7"E
    0 references
    Przedmiotem projektu są działania inwestycyjne z zakresu termomodernizacji w 4 placówkach (łącznie 7 budynków) użyteczności publicznej tj: CKPiZ w Bażanowicach (3 budynki), I LO im. A. Osuchowskiego w Cieszynie, II LO im. M. Kopernika (2 budynki) oraz Zespołu Szkół Budowlanych im. Gen. S. Grota Roweckiego w Cieszynie, mające na celu poprawę energetyczną tych budynków oraz jakości powietrza w regionie. Zakres inwestycji obejmuje: docieplenie ścian, stropodachów, wymianę stolarki okiennej i drzwiowej na wyroby o lepszej izolacyjności, wymianę oświetlenia na energooszczędne oraz przebudowę systemów wentylacji z odzyskiem, wymianę źródła ciepła (węglowego), modernizację wewnętrznej instalacji c.o. wraz z zastosowaniem gruntowych pomp ciepła. W wyniku realizacji projektu zakłada się zmniejszenie rocznego zużycia energii końcowej o 6 128 GJ/rok tj. o 53,14%, spadek emisji gazów cieplarnianych o 660 ton ekwiwalentu CO2/rok oraz redukcję emisji CO2 dla bud. CKPiZ o 99,16%. (Polish)
    0 references
    The subject of the project are investment activities in the field of thermomodernisation in 4 outposts (total 7 buildings) of public utility, i.e.: CKPiZ in Bażanowice (3 buildings), A. Osuchowski High School in Cieszyn, II Kopernik High School (2 buildings) and Gen. S. Rowecki Grotto in Cieszyn, aimed at improving the energy of these buildings and air quality in the region. The scope of the investment includes: warming of walls, stropodache, replacement of window and door carpentry for better insulating products, replacement of lighting for energy-efficient and conversion of ventilation systems with recovery, replacement of heat source (coal), modernisation of the internal heating system with the use of ground heat pumps. As a result of the project, it is expected to reduce the annual final energy consumption by 6 128 GJ/year, i.e. by 53.14 %, a decrease in greenhouse gas emissions by 660 tonnes of CO2 equivalent/year and a reduction in CO2 emissions for construction. CKPiZ 99,16 %. (English)
    21 October 2020
    0 references
    Le projet a pour objet des activités d’investissement dans le domaine de la thermomodernisation dans 4 établissements (un total de 7 bâtiments) d’utilité publique, c’est-à-dire: CKPiZ à Bażanowice (3 bâtiments), A. Osuchowski I LO à Cieszyn, II Kopernik LO (2 bâtiments) et Gen. Construction School Complex Sr. Grota Rowecki à Cieszyn, visant à améliorer l’énergie de ces bâtiments et la qualité de l’air dans la région. La portée de l’investissement comprend: isolation des murs, des planchers, remplacement de la menuiserie des fenêtres et des portes pour les produits avec une meilleure isolation, remplacement de l’éclairage pour l’efficacité énergétique et reconstruction des systèmes de ventilation avec récupération, échange de source de chaleur (carbone), modernisation du système de chauffage central interne ainsi que l’utilisation de pompes à chaleur au sol. À la suite du projet, la consommation finale annuelle d’énergie devrait diminuer de 6 128 GJ/an, soit 53,14 %, les émissions de gaz à effet de serre de 660 tonnes de CO2/an et les émissions de CO2 pour la construction. CKPiZ de 99,16 %. (French)
    2 December 2021
    0 references

    Identifiers

    RPSL.04.03.02-24-047H/17
    0 references