Lot 25 Road III-109 “I-1 — Melnik” from km 0+ 528 to km 12+ 815 with a total length of 12.287 km, Blagoevgrad district (Q3835745): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
41°45'1.04"N, 23°29'14.42"E
| |||||||||||
Property / coordinate location: 41°45'1.04"N, 23°29'14.42"E / rank | |||||||||||
Normal rank |
Revision as of 10:14, 3 December 2021
Project Q3835745 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Lot 25 Road III-109 “I-1 — Melnik” from km 0+ 528 to km 12+ 815 with a total length of 12.287 km, Blagoevgrad district |
Project Q3835745 in Bulgaria |
Statements
7,817,222.2 Bulgarian lev
0 references
9,196,732.0 Bulgarian lev
0 references
0.85 percent
0 references
12 July 2017
0 references
13 July 2021
0 references
Q3831602 (Deleted Item)
0 references
Основният резултат, който ще бъде постигнат с реализацията на проекта е 12.287 км рехабилитиран пътен участък от път IIІ–109. С подобряването на транспортно-експлоатационните качества на съществуващия пътен участък, ще се осигурят безопасност на движението и комфорт на пътуващите туристи към гр. Мелник и Роженския манастир и на жителите на гр. Мелник, с. Спатово, с. Хотово и с. Лозеница до общинския център гр. Сандански. Ще се постигне подобряване на състоянието на околната среда чрез намаляване на вредните емисии на парникови газове и удължаване експлоатационния живот на пътя. Ще се подобри качеството на живот и работна среда на населението, ще се привлекат инвестиции, ще се осигури по-добър достъп до образование и медицински грижи, допълнително ще се стимулира развитието на туризъм, както и подобряване достъпността до TEN-T мрежата на товари и пътници в рамките на региона, с което се постига и целта на настоящата схема за предоставяне на безвъзмездна помощ. Основните дейности, които са заложени за успешната реализацията на проекта са: - Сформиране на екип за управление на проекта, който да координира всички дейности и участници в реализацията на проекта ; - Избор на изпълнител за извършване на строително монтажни работи, подписване на договор с него и извършване на рехабилитация на обекта; - Избор на изпълнител на строителен надзор (Консултант) на проекта, подписване на договор с него и извършване на консултантски услуги; - Осъществяване на авторски надзор на обекта; - Избор на изпълнител за осъществяване на мерките по информация и публичност, сключване договор с него и осъществяване на информация и публичност; - Избор на одитор на проекта, подписване на договор с него и извършване одит на проекта; - Въвеждане на обекта в експлоатация, верификация на разходите и отчитане на постигнатите резултати. (Bulgarian)
0 references
The main result that will be achieved with the realisation of the project is 12.287 km of rehabilitated road section of road III-109. With the improvement of the transport and operational qualities of the existing road section, traffic safety and comfort will be ensured for travelers to Melnik and Rozhen Monastery and residents of Melnik, Spatovo, Hotovo and Lozenitsa villages next to the municipal center of Sandanski. Improving the state of the environment by reducing harmful greenhouse gas emissions and extending road lifetimes will be achieved. Improving the quality of life and working environment of the population, attracting investment, ensuring better access to education and medical care, further stimulating the development of tourism, as well as improving the accessibility of the TEN-T network for freight and passengers within the region, thus also achieving the objective of the current grant scheme. The main activities set for the successful implementation of the project are: — Formation of a project management team to coordinate all activities and participants in the implementation of the project; — Selection of a contractor for carrying out construction works, signing a contract with him and carrying out rehabilitation of the site; — Selection of a contractor for construction supervision (Consultant) of the project, signing a contract with it and providing consulting services; — Carrying out author’s supervision of the site; — Selection of a contractor for the implementation of the information and publicity measures, the conclusion of a contract with him and the implementation of information and publicity; — Selecting the project auditor, signing a contract with the project and auditing the project; — Commissioning of the site, verification of costs and reporting of the results achieved. (English)
2 December 2021
0 references
Le principal résultat qui sera obtenu avec la réalisation du projet est de 12,287 km de tronçon routier réhabilité de la route III-109. Avec l’amélioration du transport et des qualités opérationnelles du tronçon routier existant, la sécurité et le confort de la circulation seront assurés pour les voyageurs à Melnik et Rozhen Monastère et les résidents de Melnik, Spatovo, Hotovo et Lozenitsa villages à côté du centre municipal de Sandanski. Améliorer l’état de l’environnement en réduisant les émissions de gaz à effet de serre nocives et en prolongeant la durée de vie des routes. Améliorer la qualité de vie et l’environnement de travail de la population, attirer les investissements, assurer un meilleur accès à l’éducation et aux soins médicaux, stimuler davantage le développement du tourisme et améliorer l’accessibilité du réseau RTE-T pour le fret et les passagers dans la région, ce qui permet également d’atteindre l’objectif du régime actuel de subventions. Les principales activités prévues pour la mise en œuvre réussie du projet sont les suivantes: La formation d’une équipe de gestion de projet chargée de coordonner toutes les activités et tous les participants à la mise en œuvre du projet; La sélection d’un entrepreneur pour la réalisation des travaux de construction, la signature d’un contrat avec lui et la réhabilitation du chantier; — Sélection d’un contractant pour la supervision de la construction (conseiller) du projet, signature d’un contrat avec celui-ci et prestation de services de conseil; — Assurer la supervision du site par l’auteur; La sélection d’un contractant pour la mise en œuvre des actions d’information et de publicité, la conclusion d’un contrat avec lui et la mise en œuvre de l’information et de la publicité; — Sélection de l’auditeur du projet, signature d’un contrat avec le projet et audit du projet; — Mise en service du site, vérification des coûts et communication des résultats obtenus. (French)
3 December 2021
0 references
Благоевград
0 references
Identifiers
BG16RFOP001-7.001-0025
0 references