“Integrated water project of the agglomeration of Smolyan” (Q3832245): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Created claim: summary (P836): The project “Integrated water project of agglomeration Smolyan” was developed on the basis of a pre-investment study with a view to overcoming the problems related to the existing drinking and waste water infrastructure on the territory of Smolyan and providing environmentally friendly treatment and discharge of domestic waste water. The main activities envisaged within the project are the following:- Reconstruction of a water supply network wit...) |
||||||||||||||
Property / summary | |||||||||||||||
The project “Integrated water project of agglomeration Smolyan” was developed on the basis of a pre-investment study with a view to overcoming the problems related to the existing drinking and waste water infrastructure on the territory of Smolyan and providing environmentally friendly treatment and discharge of domestic waste water. The main activities envisaged within the project are the following:- Reconstruction of a water supply network with expired service life;- Reconstruction of a sewage network with expired service life;- Reconstruction in a trenchless way of the main urban collector;- Construction of a new water supply network and zoning of the network;- Construction of a new sewerage network;- Reconstruction of PWSP “Hubcha” and PWSP “Transvala”;- Construction of tertiary treatment for the removal of phosphorus of WWTP. As a result of the implementation of the project, the collected and treated pollution load before discharge of the waste water into water bodies will be increased, water losses in the water transmission network will be reduced and the water supply of the population of Smolyan will be improved. This will contribute to the achievement of the specific objective 1 ‘Protection and improvement of the status of water resources’ of priority axis 1 ‘Water’ of OPE 2014-2020. (English) | |||||||||||||||
Property / summary: The project “Integrated water project of agglomeration Smolyan” was developed on the basis of a pre-investment study with a view to overcoming the problems related to the existing drinking and waste water infrastructure on the territory of Smolyan and providing environmentally friendly treatment and discharge of domestic waste water. The main activities envisaged within the project are the following:- Reconstruction of a water supply network with expired service life;- Reconstruction of a sewage network with expired service life;- Reconstruction in a trenchless way of the main urban collector;- Construction of a new water supply network and zoning of the network;- Construction of a new sewerage network;- Reconstruction of PWSP “Hubcha” and PWSP “Transvala”;- Construction of tertiary treatment for the removal of phosphorus of WWTP. As a result of the implementation of the project, the collected and treated pollution load before discharge of the waste water into water bodies will be increased, water losses in the water transmission network will be reduced and the water supply of the population of Smolyan will be improved. This will contribute to the achievement of the specific objective 1 ‘Protection and improvement of the status of water resources’ of priority axis 1 ‘Water’ of OPE 2014-2020. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project “Integrated water project of agglomeration Smolyan” was developed on the basis of a pre-investment study with a view to overcoming the problems related to the existing drinking and waste water infrastructure on the territory of Smolyan and providing environmentally friendly treatment and discharge of domestic waste water. The main activities envisaged within the project are the following:- Reconstruction of a water supply network with expired service life;- Reconstruction of a sewage network with expired service life;- Reconstruction in a trenchless way of the main urban collector;- Construction of a new water supply network and zoning of the network;- Construction of a new sewerage network;- Reconstruction of PWSP “Hubcha” and PWSP “Transvala”;- Construction of tertiary treatment for the removal of phosphorus of WWTP. As a result of the implementation of the project, the collected and treated pollution load before discharge of the waste water into water bodies will be increased, water losses in the water transmission network will be reduced and the water supply of the population of Smolyan will be improved. This will contribute to the achievement of the specific objective 1 ‘Protection and improvement of the status of water resources’ of priority axis 1 ‘Water’ of OPE 2014-2020. (English) / qualifier | |||||||||||||||
point in time: 2 December 2021
|
Revision as of 10:20, 2 December 2021
Project Q3832245 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | “Integrated water project of the agglomeration of Smolyan” |
Project Q3832245 in Bulgaria |
Statements
58,000,690.39 Bulgarian lev
0 references
76,489,302.08 Bulgarian lev
0 references
0.76 percent
0 references
28 February 2019
0 references
28 July 2023
0 references
0 references
Проект „Интегриран воден проект на агломерация Смолян“ е разработен на база прединвестиционно проучване с оглед преодоляване на проблемите, свързани със съществуващата инфраструктура за питейни и отпадъчни води на територията на гр. Смолян и осигуряване на екологосъобразно пречистване и заустване на битовите отпадъчни води. Основните дейности, предвидени рамките на проекта са следните:- Реконструкция на водопроводна мрежа с изтекъл експлоатационен срок;- Реконструкция на канализационна мрежа с изтекъл експлоатационен срок;- Реконструкция по безизкопен способ на главен градски колектор;- Изграждане на нова водопроводна мрежа и зониране на мрежата;- Изграждане на нова канализационна мрежа;- Реконструкция на ПСПВ „Хубча” и ПСПВ „Превала”;- Изграждане на третично пречистване за отстраняване на фосфор на ПСОВ. В резултат от изпълнение на проекта ще бъде увеличен събраният и третиран товар на замърсяване преди заустването на отпадъчните води във водни обекти, ще бъдат намалени загубите на вода във водопреносната мрежа и ще бъде подобрено водоснабдяването на населението на гр. Смолян. По този начин ще се допринесе за постигане на специфична цел 1 „Опазване и подобряване състоянието на водните ресурси” на приоритетна ос 1 „Води” на ОПОС 2014 – 2020 г. (Bulgarian)
0 references
The project “Integrated water project of agglomeration Smolyan” was developed on the basis of a pre-investment study with a view to overcoming the problems related to the existing drinking and waste water infrastructure on the territory of Smolyan and providing environmentally friendly treatment and discharge of domestic waste water. The main activities envisaged within the project are the following:- Reconstruction of a water supply network with expired service life;- Reconstruction of a sewage network with expired service life;- Reconstruction in a trenchless way of the main urban collector;- Construction of a new water supply network and zoning of the network;- Construction of a new sewerage network;- Reconstruction of PWSP “Hubcha” and PWSP “Transvala”;- Construction of tertiary treatment for the removal of phosphorus of WWTP. As a result of the implementation of the project, the collected and treated pollution load before discharge of the waste water into water bodies will be increased, water losses in the water transmission network will be reduced and the water supply of the population of Smolyan will be improved. This will contribute to the achievement of the specific objective 1 ‘Protection and improvement of the status of water resources’ of priority axis 1 ‘Water’ of OPE 2014-2020. (English)
2 December 2021
0 references
Смолян
0 references
Identifiers
BG16M1OP002-1.014-0001
0 references