Reconstruction of national regional road P30 Cēsis – Vecpiebalga – Madona (stage Vecpiebalga – Invaldnkalns) km 49.06-61.13 (Q3057633): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): L’objectif de ce projet est la reconstruction de la route nationale régionale P30 Cēsis — Vecpiebalga — Madona (étape Vecpiebalga — In’kalns) km 49,06-61.13, qui comprend la construction d’un trottoir et l’achat de terrains. Durée totale prévue de mise en œuvre du projet 39 mois. Le coût total du projet s’élève à 754 626,10 EUR, y compris le financement prévu du Fonds européen de développement régional — 64 632,18 EUR et le financement du budget...)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Wiederaufbau der nationalen Regionalstraße P30 Cēsis – Vecpiebalga – Madona (Abschnitt Vecpiebalga – In‑enkalns) km 49,06-61,13

Revision as of 09:38, 28 November 2021

Project Q3057633 in Latvia
Language Label Description Also known as
English
Reconstruction of national regional road P30 Cēsis – Vecpiebalga – Madona (stage Vecpiebalga – Invaldnkalns) km 49.06-61.13
Project Q3057633 in Latvia

    Statements

    0 references
    0 references
    0 references
    6,414,632.18 Euro
    0 references
    7,546,626.1 Euro
    0 references
    85.0 percent
    0 references
    27 September 2018
    0 references
    26 December 2021
    0 references
    Satiksmes ministrija
    0 references
    0 references

    57°14'10.61"N, 25°38'10.43"E
    0 references

    56°59'38.98"N, 26°3'45.97"E
    0 references
    Projekta mērķis ir valsts reģionālā autoceļa P30 Cēsis – Vecpiebalga – Madona (posma Vecpiebalga – Inķēnkalns) km 49,06 – 61,13 pārbūve, kas ietver segas izbūvi un zemju iegādi. Plānotais kopējais projekta īstenošanas ilgums 39 mēneši. Projekta plānotās kopējās izmaksas 7 546 626,10 euro, t.sk. plānotais Eiropas Reģionālās attīstības fonda finansējums –6 414 632,18 euro un valsts budžeta finansējums – 1 131 993,92 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts reģionālā autoceļa P30 Cēsis – Vecpiebalga – Madona (posma Vecpiebalga – Inķēnkalns) km 49,06 – 61,13 – 12,07 km garumā. Projektā ietvertā autoceļa posmu maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. Autoceļš atrodas valsts īpašumā. Nepieciešamības gadījumā vajadzīgie zemes gabali tiks iegādāti. (Latvian)
    0 references
    The aim of the project is reconstruction of the national regional road P30 Cēsis – Vecpiebalga – Madona (stage Vecpiebalga – Invaldnkalns) km 49.06-61.13, which includes construction of duvets and purchase of land. The total planned duration of the project is 39 months. The estimated total cost of the project is EUR 7546626,10, including the planned European Regional Development Fund funding – EUR 6 414632,18 and the state budget funding – EUR 1131993.92. As a result of the project, the national regional road P30 Cēsis – Vecpiebalga – Madona (stage Vecpiebalga – Invaldnkalns) will be arranged in length of 49.06-61.13-12.07 km. The maximum driven axle load of road sections covered by the project will be 11.5 tonnes after the implementation of the project and the maximum uncontrolled vehicle mass will be 44 tonnes. The road is state-owned. If necessary, the necessary plots will be purchased. (English)
    15 July 2021
    0 references
    L’objectif de ce projet est la reconstruction de la route nationale régionale P30 Cēsis — Vecpiebalga — Madona (étape Vecpiebalga — In’kalns) km 49,06-61.13, qui comprend la construction d’un trottoir et l’achat de terrains. Durée totale prévue de mise en œuvre du projet 39 mois. Le coût total du projet s’élève à 754 626,10 EUR, y compris le financement prévu du Fonds européen de développement régional — 64 632,18 EUR et le financement du budget de l’État — 1 131 993,92 EUR. À la suite de la mise en œuvre du projet, la route nationale régionale P30 Cēsis — Vecpiebalga — Madona (étape Vecpiebalga — In’kalns) sera aménagée km 49,06-61,13-12,07 km. La charge maximale par essieu moteur des tronçons routiers couverts par le projet sera de 11,5 tonnes après la mise en œuvre du projet et le véhicule non contrôlé maximal de 44 tonnes. La route appartient à l’État. Si nécessaire, les parcelles nécessaires seront achetées. (French)
    25 November 2021
    0 references
    Vecpiebalgas pag., Cēsu nov.
    0 references
    Inešu pag., Cēsu nov.
    0 references
    Liezēres pag., Madonas nov.
    0 references
    Liezēres pag., Madonas nov.
    0 references

    Identifiers

    6.3.1.0/18/I/001
    0 references