Arranging areas for pedestrians and cyclists on Gregorčič’s avenue (Q3274988): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in slovenia one item from slovenia) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Aménagement d’aires pour piétons et cyclistes sur l’avenue Gregorčič |
Revision as of 13:06, 27 November 2021
Project Q3274988 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Arranging areas for pedestrians and cyclists on Gregorčič’s avenue |
Project Q3274988 in Slovakia |
Statements
245,728.06 Euro
0 references
289,091.84 Euro
0 references
85.0 percent
0 references
16 April 2018
0 references
31 December 2021
0 references
MESTNA OBČINA PTUJ
0 references
2250
0 references
Namen investicije je zagotavljanje večje prometne varnosti pešcev in kolesarjev, zmanjševanje negativnih vplivov motornega prometa na okolje, vzpodbujanje trajnostne mobilnosti in uporabe koles za vsakodnevna opravila, kot alternative avtomobilskim prevozom. Poleg rekonstrukcije vozišča na lokalni cesti Gregorčičev drevored v dolžini 194,33 m (neupravičen del operacije) se bo v okviru investicije izvedlo naslednje (upravičen del operacije):- ureditev obojestranskega hodnika za pešce s kolesarskim pasom, z navezavo na Osojnikovo in Potrčevo cesto v dolžini 194,33 m,- ureditev javne razsvetljave,- zamenjava obstoječih komunalnih vodov,- zasaditev drevoreda,- namestitev urbane opreme. (Slovenian)
0 references
The purpose of the investment is to ensure greater traffic safety for pedestrians and cyclists, to reduce the negative environmental impacts of motor transport, to promote sustainable mobility and the use of bicycles for everyday tasks, as an alternative to car transport. In addition to the reconstruction of the roadway on the local road Gregorčič’s avenue with a length of 194.33 m (uneligible part of the operation), the following (eligible part of the operation) will be carried out as part of the investment:- the arrangement of a two-sided pedestrian corridor with a bicycle lane, connection to Osojnikova and Potrčeva road 194.33 m,- arrangement of public lighting,- replacement of existing municipal ducts,- planting of the avenue,- installation of urban equipment. (English)
19 October 2021
0 references
Identifiers
OP20.05273
0 references