Extension of the port facility open to the public transport of Mantvaška on the island of Lošinj (Q2734701): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Extension du port ouvert au trafic public Mrtvaška sur l’île de Losinj

Revision as of 12:27, 26 November 2021

Project Q2734701 in Croatia
Language Label Description Also known as
English
Extension of the port facility open to the public transport of Mantvaška on the island of Lošinj
Project Q2734701 in Croatia

    Statements

    0 references
    69,023,226.16 Croatian kuna
    0 references
    8,973,019.4 Euro
    2 June 2021
    0 references
    81,203,795.49 Croatian kuna
    0 references
    10,556,493.41 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    22 November 2019
    0 references
    21 November 2023
    0 references
    ŽUPANIJSKA LUČKA UPRAVA MALI LOŠINJ
    0 references
    Q2762530 (Deleted Item)
    0 references
    0 references

    44°31'53.69"N, 14°28'19.34"E
    0 references
    51550
    0 references
    Cilj projekta „Dogradnja luke otvorene za javni promet Mrtvaška na otoku Lošinju“ je proširenje i povećanje kapaciteta u luci, smanjenje vremena putovanja, povećanje sigurnosti pomorskog prometa te bolja povezanost otoka Lošinja s kopnom i okolnim otocima. Provedba projekta pozitivno utječe na poboljšanje dostupnosti otoka Lošinja za njegove stanovnike. Ukupna vrijednost projekta iznosi 81.491.634,40 HRK, a prihvatljivih troškova 81.203.795,49. Neprihvatljivi troškovi odnose se na troškove radova vezane uz komunalni vez i ugostiteljski objekt te pripadajući omjer troškova stručnog nadzora. EU doprinos iznosi 69.023.226,16 HRK, a nacionalni doprinos 12.180.569,33 HRK. Planirano trajanje projekta je 48 mjeseci. (Croatian)
    0 references
    The project’s ‘upgrade of ports open to public traffic in Lošinj on the island of Lošinj’ aims at expanding and increasing capacity in the port, reducing travel time, increasing maritime safety, and improving connections between the islands and the mainland and the surrounding islands. The implementation of the project has a positive impact on improving the accessibility of the islands for its residents. The total value of the project is HRK 81.491.634,40 and the eligible costs 81.203.795,49. Ineligible costs relate to the costs of works connected with the accommodation and catering establishment and the corresponding cost of the expertise. The EU contributes HRK 69.023.226,16 and the national contribution to HRK 12.180.569,33. The planned duration of the project is 48 months. (English)
    3 June 2021
    0 references

    Identifiers

    KK.07.4.1.04.0012
    0 references