Q3542414 (Q3542414): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
(‎Created claim: summary (P836): The Opel Grandland X is expected to be produced in Eisenach by the end of August 2019. This model is manufactured on a new platform for employees, the EMP2 platform. In the course of the associated plant and process changes, a large number of employees need to be trained accordingly. We intend to train five repairers from the field of raw and skeleton construction with regard to the AOL3 laser processing system. The aim of the project is that...)
Property / summary
 
The Opel Grandland X is expected to be produced in Eisenach by the end of August 2019. This model is manufactured on a new platform for employees, the EMP2 platform. In the course of the associated plant and process changes, a large number of employees need to be trained accordingly. We intend to train five repairers from the field of raw and skeleton construction with regard to the AOL3 laser processing system. The aim of the project is that employees recognise risks in plant operation at an early stage and implement measures to improve poor process results. (English)
Property / summary: The Opel Grandland X is expected to be produced in Eisenach by the end of August 2019. This model is manufactured on a new platform for employees, the EMP2 platform. In the course of the associated plant and process changes, a large number of employees need to be trained accordingly. We intend to train five repairers from the field of raw and skeleton construction with regard to the AOL3 laser processing system. The aim of the project is that employees recognise risks in plant operation at an early stage and implement measures to improve poor process results. (English) / rank
 
Normal rank
Property / summary: The Opel Grandland X is expected to be produced in Eisenach by the end of August 2019. This model is manufactured on a new platform for employees, the EMP2 platform. In the course of the associated plant and process changes, a large number of employees need to be trained accordingly. We intend to train five repairers from the field of raw and skeleton construction with regard to the AOL3 laser processing system. The aim of the project is that employees recognise risks in plant operation at an early stage and implement measures to improve poor process results. (English) / qualifier
 
point in time: 18 November 2021
Timestamp+2021-11-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 23:03, 17 November 2021

Project Q3542414 in Germany
Language Label Description Also known as
English
No label defined
Project Q3542414 in Germany

    Statements

    0 references
    4,705.28 Euro
    0 references
    5,881.6 Euro
    0 references
    80.0 percent
    0 references
    1 June 2019
    0 references
    30 June 2019
    0 references
    Opel Automobile GmbH
    0 references
    0 references

    52°31'39.25"N, 13°32'6.76"E
    0 references
    12681 Berlin
    0 references
    Voraussichtlich ab Ende August 2019 soll der Opel Grandland X in Eisenach produziert werden. Dieses Modell wird auf einer für die Mitarbeiter neuen Plattform, der EMP2-Plattform gefertigt. Im Zuge der damit verbundenen Anlagen- und Prozessveränderungen muss eine Vielzahl von Mitarbeitern gezielt daraufhin geschult werden. Wir beabsichtigen fünf Instandhalter aus dem Bereich Roh- und Gerippebau hinsichtlich des Laserbearbeitungssystem AOL3 zu trainieren. Ziel des Projektes ist es, dass die Mitarbeiter Risiken im Anlagenbetrieb frühzeitig erkennen und Maßnahmen zur Verbesserung mangelhafter Prozessergebnisse durchzuführen. (German)
    0 references
    The Opel Grandland X is expected to be produced in Eisenach by the end of August 2019. This model is manufactured on a new platform for employees, the EMP2 platform. In the course of the associated plant and process changes, a large number of employees need to be trained accordingly. We intend to train five repairers from the field of raw and skeleton construction with regard to the AOL3 laser processing system. The aim of the project is that employees recognise risks in plant operation at an early stage and implement measures to improve poor process results. (English)
    18 November 2021
    0 references

    Identifiers

    DE_TEMPORARY_ESF_138326
    0 references