LPW-E/4.2.2/898 — Recycling of parts of the former Scholtz barracks (Q3334093): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes) |
||||||||||
Property / coordinate location | |||||||||||
54°4'27.19"N, 9°59'4.16"E
| |||||||||||
Property / coordinate location: 54°4'27.19"N, 9°59'4.16"E / rank | |||||||||||
Normal rank |
Revision as of 08:10, 5 November 2021
Project Q3334093 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | LPW-E/4.2.2/898 — Recycling of parts of the former Scholtz barracks |
Project Q3334093 in Germany |
Statements
1,601,213.93 Euro
0 references
3,202,427.85 Euro
0 references
50.0 percent
0 references
2 March 2018
0 references
1 September 2020
0 references
Stadt Neumünster
0 references
24534 Neumünster
0 references
Die Scholtz-Kaserne wurde bis Ende der 1990er Jahre militärisch genutzt. Bis auf die Bereiche der Erstaufnahmeeinrichtung liegen die Flächen bis heute brach, weshalb sich die Gebäude mittlerweile in einem baufälligen Zustand befinden. 2013 hat die Stadt Neumünster die ca. 7,2 ha großen, ungenutzten Flächen erworben.Die Stadt Neumünster beabsichtigt, eine Konversion für diese Teilflächen anzustoßen, um den städtebaulichen Missstand dringend zu beheben. Ziel ist es, durch den Abbruch sämtlicher baulicher Anlagen und die Sanierung der Altlasten eine wohnbauliche Nachnutzung vorzubereiten. Durch die zentrumsnahe Lage und gute Anbindung an alle wesentlichen Infrastruktureinrichtungen hat die Revitalisierung dieser Fläche aus Sicht der Stadt Neumünster im Sinne einer nachhaltigen Stadtentwicklung oberste Priorität. Eine städtebauliche Bebauungsskizze sieht die Errichtung von Ein-, Doppel- und Reihenhäusern sowie von Geschosswohnungsbauten vor. (German)
0 references
The Scholtz barracks were used militarily until the end of the 1990s. Apart from the areas of the first reception facility, the areas are still broken, which is why the buildings are now in a dilapidated state. In 2013, the city of Neumünster acquired the approximately 7.2 hectares of unused land.The city of Neumünster intends to initiate a conversion for these sub-areas in order to urgently remedy the urban maladministration. The aim is to prepare a residential re-use through the demolition of all structural facilities and the remediation of the contaminated sites. Due to its location close to the centre and good access to all essential infrastructures, the revitalisation of this area is a top priority from the point of view of the city of Neumünster in terms of sustainable urban development. An urban development sketch provides for the construction of single, double and terraced houses as well as of floor dwellings. (English)
25 October 2021
0 references
Identifiers
DE_TEMPORARY_36738
0 references