Process optimisation by integrating the existing goods management, stamp configurator and online shop into a closed computer system (Q3325568): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Process optimisation by integrating the existing goods management, stamp configurator and online shop into a closed computer system, translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Process optimisation by integrating the existing goods management, stamp configurator and online shop into a closed computer system

Revision as of 02:34, 25 October 2021

Project Q3325568 in Germany
Language Label Description Also known as
English
Process optimisation by integrating the existing goods management, stamp configurator and online shop into a closed computer system
Project Q3325568 in Germany

    Statements

    0 references
    13,198.01 Euro
    0 references
    16,497.51 Euro
    0 references
    80.0 percent
    0 references
    18 January 2016
    0 references
    31 December 2016
    0 references
    Stempel & SchilderRudolf Schmorrde GmbH & Co. KG
    0 references
    0 references

    51°5'41.03"N, 14°40'9.26"E
    0 references
    Prozessoptimierung durch Integration der bestehenden Warenwirtschaft, Stempelkonfigurator und Onlineshop in ein geschlossenes EDV-System (German)
    0 references
    Process optimisation by integrating the existing goods management, stamp configurator and online shop into a closed computer system (English)
    25 October 2021
    0 references
    Löbau, Stadt
    0 references

    Identifiers

    672 / 101002654601
    0 references