Q3320954 (Q3320954): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Created claim: summary (P836): Elbe, Heidenau, construction of a flood protection wall (blind wall) against the Elbe flood south of the Müglitz estuary in Heidenau (HWSK Elbe: M15 pro rata/M 16), translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Elbe, Heidenau, construction of a flood protection wall (blind wall) against the Elbe flood south of the Müglitz estuary in Heidenau (HWSK Elbe: M15 pro rata/M 16) (English) | |||||||||||||||
Property / summary: Elbe, Heidenau, construction of a flood protection wall (blind wall) against the Elbe flood south of the Müglitz estuary in Heidenau (HWSK Elbe: M15 pro rata/M 16) (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Elbe, Heidenau, construction of a flood protection wall (blind wall) against the Elbe flood south of the Müglitz estuary in Heidenau (HWSK Elbe: M15 pro rata/M 16) (English) / qualifier | |||||||||||||||
point in time: 25 October 2021
|
Revision as of 01:07, 25 October 2021
Project Q3320954 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3320954 in Germany |
Statements
23,136,796.54 Euro
0 references
28,920,995.67 Euro
0 references
80.0 percent
0 references
1 January 2015
0 references
31 December 2023
0 references
Landestalsperrenverwaltung 20 (OE)
0 references
Elbe, Heidenau, Herstellen einer Hochwasserschutzmauer (Spundwand) gegen Elbehochwasser südlich der Müglitzmündung in Heidenau (HWSK Elbe: M15 anteilig/ M 16) (German)
0 references
Elbe, Heidenau, construction of a flood protection wall (blind wall) against the Elbe flood south of the Müglitz estuary in Heidenau (HWSK Elbe: M15 pro rata/M 16) (English)
25 October 2021
0 references
Heidenau, Stadt
0 references
Identifiers
39 / 102796052
0 references