Energetic roof refurbishment City Hall (Q3297708): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Bad Tölz-Wolfratshausen / rank | |||
Normal rank |
Revision as of 19:21, 24 October 2021
Project Q3297708 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | Energetic roof refurbishment City Hall |
Project Q3297708 in Germany |
Statements
550,000.0 Euro
0 references
23 December 2020
0 references
31 March 2022
0 references
Gemeinde Lenggries
0 references
Energetische Dachsanierung Rathaus mit Ziegeleindeckung (vorher Blech), Dämmung der Dachkonstruktion und Verbesserung der Dämmung der Giebelwände ohne Beeinträchtigung des ortsbildprägenden Baudenkmals (German)
0 references
Energetic roof refurbishment City Hall with tile cover (formerly sheet metal), insulation of the roof construction and improvement of the insulation of the gable walls without impairing the site-forming building monument (English)
24 October 2021
0 references
Lenggries
0 references
Identifiers
DE_TEMPORARY_495
0 references